The Cove Building 1Completed 2022AED 2,357 per sq ft ▲ 2% in a year resale, 16 sales
Sales alert
Home › Dubai Creek Harbour (The Lagoons) › Residential towers › The Cove › The Cove Building 1
Map: Google Maps
Upper mid-range canal-front residential tower built by Emaar Properties, handed over in 2022, with 12 floors, 110 resales and 26 off-plan sales since 2020

The Cove Building 1, Dubai Creek Harbour (The Lagoons) · by Emaar Properties

A resale 2-bed in The Cove Building 1 sells for about AED 3.13m

Median of 10 resale sales in the 12 months to 19 Oct 2026. Last sale in the tower: 13 Oct 2026.

The market says
16 resales in 12 months at AED 2,357 per sq ft (+2% in a year); a higher price than 61% of Dubai Creek Harbour (The Lagoons) towers; owners who sold gained 2.6% a year and 31% sold at a loss; 2 homes for sale now.
James Paul Booth
The agent's view
“Owners who sold in The Cove Building 1 made 2.6% a year, and 31% of them sold at a loss. Few homes are for sale against the pace of sales, so a home at the right price sells quickly. That record is weak. I would only buy below the last sold price for the same layout.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page
Renting, or buying to let? Signed rents across the area: rent prices on RENT DUBAI →
Size
12 floors
97 units with a sale on record since 2020.
1sale in the last 30 days: 1 resale, 0 off-plan
2for sale now
2 monthsto sell the homes now listed, at the last year's pace
AIWritten by Dalia, an AI data analyst. Data to 19 Oct 2026. Built 21 Oct 2026.

Pictures of The Cove Building 1

main image on the Emaar project page (checked by eye: render)
main image on the Emaar project page (checked by eye: render)
Render: emaar.com
feature image on the Emaar project page (checked by eye: render)
feature image on the Emaar project page (checked by eye: render)
Render: emaar.com
feature image on the Emaar project page (checked by eye: render)
feature image on the Emaar project page (checked by eye: render)
Render: emaar.com

41 pictures of this building: developer renders, photos. Each shows its source; select one to open it there. A drawing is made by BUY DUBAI from real pictures and is marked as a drawing.

The Cove Building 1 on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, by the developer or by an earlier buyer (a Land Department "delayed sell"). The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 19 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A median needs 5 sales or 3 listings.

TypeResale: soldResale: per sq ftMedian askingRent a year
1-bedunder 5 (3)–– (0)– (0)
2-bedAED 3,125,000 (10)2,331– (1)– (1)
3-bedunder 5 (2)–– (1)AED 300,000 (5)
4-bedunder 5 (1)–– (0)– (0)

Rents are asking rents, not registered contracts. Yield = asking rent divided by the median resale price, before service charge.

Sales we leave out of every median, count and chart (1 of 136 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (0); a sale at exactly the same price as that unit's sale before (1); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Resale price per sq ft rose 2% in a year

Median AED 2,357 per sq ft in the last 12 months (16 resale sales) against AED 2,313 in the 12 months before (14 resale sales).

2023-Q1: AED 2,045 per sq ft, 5 sales2,04523 Q12023-Q2: AED 2,322 per sq ft, 11 sales2,32223 Q22023-Q3: AED 2,518 per sq ft, 1 sale2,51823 Q32023-Q4: AED 2,609 per sq ft, 5 sales2,60923 Q42024-Q1: AED 2,321 per sq ft, 4 sales2,32124 Q12024-Q2: AED 2,044 per sq ft, 2 sales2,04424 Q22024-Q3: AED 2,162 per sq ft, 4 sales2,16224 Q32024-Q4: AED 2,234 per sq ft, 1 sale2,23424 Q42025-Q1: AED 2,162 per sq ft, 4 sales2,16225 Q12025-Q2: AED 2,417 per sq ft, 5 sales2,41725 Q22025-Q3: AED 2,544 per sq ft, 4 sales2,54425 Q32025-Q4: AED 2,170 per sq ft, 4 sales2,17025 Q42026-Q1: AED 2,495 per sq ft, 4 sales2,49526 Q12026-Q2: AED 2,612 per sq ft, 3 sales2,61226 Q22026-Q3: AED 2,193 per sq ft, 4 sales2,19326 Q32026-Q4: AED 2,383 per sq ft, 1 sale2,38326 Q45 sales511 sales111 sales15 sales54 sales42 sales24 sales41 sales14 sales45 sales54 sales44 sales44 sales43 sales34 sales41 sales1Median AED per sq ftNumber of sales

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most. Grey bars have fewer than 3 sales.

Every sale since 2020: 136 sales of 97 units

Newest first. Each sale is marked Resale or Off-plan. The last column shows the change from the same unit's sale before.

UnitTypeSq ftPriceAED per sq ftDateMarketAgainst the sale before
19072-bed1,343AED 3,200,0002,38313 Oct 2026Resale+14% from AED 2.80m in 2023
3052-bed1,283AED 2,750,0002,14411 Sep 2026Resale-0% from AED 2.76m in 2021
13062-bed1,339AED 3,300,0002,4659 Sep 2026Resale
7062-bed1,339AED 2,750,0002,0543 Aug 2026Resale+8% from AED 2.54m in 2022
2062-bed1,339AED 3,000,0002,2416 Jul 2026Resale+8% from AED 2.79m in 2022
6052-bed1,283AED 3,350,0002,61223 Jun 2026Resale+34% from AED 2.50m in 2020
20024-bed4,136AED 12,000,0002,90118 Jun 2026Resale+12% from AED 10.75m in 2022
10062-bed1,340AED 2,650,0001,9782 Jun 2026Resale
8062-bed1,339AED 3,050,0002,27926 Mar 2026Resale
1042-bed1,662AED 4,424,8882,66210 Mar 2026Resale+19% from AED 3.71m in 2024
14011-bed826AED 2,000,0002,42113 Feb 2026Resale
13072-bed1,343AED 3,450,0002,5696 Jan 2026Resale+32% from AED 2.61m in 2022
1023-bed1,840AED 3,700,0002,01118 Dec 2025Resale-12% from AED 4.21m in 2022
3011-bed826AED 1,500,0001,81610 Dec 2025Resale
6011-bed826AED 1,925,0002,33017 Nov 2025Resale+14% from AED 1.69m in 2023
4033-bed1,839AED 4,500,0002,4478 Nov 2025Resale
14041-bed745AED 2,050,0002,75111 Sep 2025Resale-5% from AED 2.15m in 2023
16062-bed1,339AED 3,320,0002,4808 Sep 2025Resale+7% from AED 3.11m in 2023
9052-bed1,283AED 2,950,0002,3007 Aug 2025Resale+10% from AED 2.68m in 2021
7023-bed1,840AED 4,800,0002,60825 Jul 2025Resale+13% from AED 4.26m in 2022
12062-bed1,339AED 2,970,0002,21918 Jun 2025Resale+11% from AED 2.68m in 2021
6023-bed1,840AED 4,800,0002,60812 Jun 2025Resale+13% from AED 4.25m in 2022
13052-bed1,283AED 3,100,0002,41711 Jun 2025Resale
16041-bed745AED 2,250,0003,01915 May 2025Resale+15% from AED 1.95m in 2023
4023-bed1,840AED 4,000,0002,17428 Apr 2025Resale-6% from AED 4.23m in 2022
9062-bed1,339AED 2,950,0002,20425 Feb 2025Resale
21014-bed4,620AED 10,750,0002,32721 Feb 2025Resale+8% from AED 9.99m in 2022
8072-bed1,343AED 2,575,0001,91711 Feb 2025Resale+15% from AED 2.24m in 2023
10072-bed1,344AED 2,850,0002,1205 Feb 2025Resale+10% from AED 2.60m in 2022
11072-bed1,343AED 3,000,0002,23410 Dec 2024Resale+9% from AED 2.75m in 2022
15011-bed826AED 2,080,0002,51830 Aug 2024Resale
15052-bed1,283AED 2,900,0002,26129 Aug 2024Resale
10023-bed1,841AED 3,800,0002,06419 Aug 2024Resale
2011-bed826AED 1,570,0001,90015 Jul 2024Resale
3062-bed1,339AED 2,930,0002,18920 Jun 2024Resale+5% from AED 2.79m in 2022
G011-bed837AED 1,590,0001,90020 Jun 2024Resale-11% from AED 1.79m in 2022
G033-bed1,839AED 4,240,0002,30627 Feb 2024Resale+1% from AED 4.19m in 2022
1042-bed1,662AED 3,705,8882,22919 Feb 2024Resale
18041-bed745AED 1,750,0002,3488 Feb 2024Resale
15023-bed1,840AED 4,300,0002,33715 Jan 2024Resale+5% from AED 4.11m in 2022
4041-bed745AED 2,040,0002,73830 Nov 2023Resale
14041-bed745AED 2,150,0002,88528 Nov 2023Resale
G023-bed1,843AED 4,808,8882,60927 Nov 2023Resale
17052-bed1,283AED 2,776,2502,16516 Nov 2023Resale
17033-bed1,839AED 4,340,0002,3603 Oct 2023Resale
16023-bed1,840AED 4,633,8882,5187 Jul 2023Resale
6011-bed826AED 1,685,0002,04014 Jun 2023Resale
16052-bed1,283AED 3,169,8882,4719 Jun 2023Resale
14033-bed1,839AED 4,000,0002,1758 Jun 2023Resale+30% from AED 3.07m in 2023
3023-bed1,840AED 4,519,8882,45631 May 2023Resale+7% from AED 4.22m in 2022
19072-bed1,343AED 2,800,0002,08518 May 2023Resale
11052-bed1,283AED 2,000,0001,55911 May 2023Resale
16062-bed1,339AED 3,108,8882,32212 Apr 2023Resale
18011-bed826AED 1,979,8882,39711 Apr 2023Resale+24% from AED 1.59m in 2020
16072-bed1,343AED 2,813,8882,0956 Apr 2023Resale
16011-bed826AED 1,971,8882,3875 Apr 2023Resale
16041-bed745AED 1,951,8882,6194 Apr 2023Resale
14033-bed1,839AED 3,067,1491,66830 Mar 2023Resale-12% from AED 3.50m in 2020
16033-bed1,839AED 4,686,8882,54928 Mar 2023Resale
14023-bed1,840AED 3,500,0001,90224 Feb 2023Resale-16% from AED 4.19m in 2022
3072-bed1,343AED 2,746,8882,0452 Feb 2023Resale
13023-bed1,840AED 4,608,8882,50530 Jan 2023Resale
8072-bed1,343AED 2,242,8881,6709 Jan 2023Resalesame price as in 2020: transfer
11072-bed1,343AED 2,750,0002,0488 Dec 2022Resale
6041-bed745AED 1,177,0001,5795 Dec 2022Resale
13072-bed1,343AED 2,613,8881,94624 Nov 2022Resale
14072-bed1,343AED 2,800,0002,08522 Nov 2022Resale
7052-bed1,283AED 2,300,0001,79322 Nov 2022Resale-8% from AED 2.51m in 2020
5041-bed745AED 1,600,0002,14714 Nov 2022Resale
15023-bed1,840AED 4,105,7942,23110 Nov 2022Resale
20024-bed4,136AED 10,750,0002,5997 Nov 2022Resale+51% from AED 7.10m in 2022
1023-bed1,840AED 4,207,8882,2873 Nov 2022Resale
2052-bed1,283AED 2,650,0002,06631 Oct 2022Resale-3% from AED 2.73m in 2022
18033-bed1,839AED 3,200,0001,74028 Oct 2022Resale-20% from AED 3.98m in 2021
5062-bed1,339AED 2,803,8882,09524 Oct 2022Resale
21014-bed4,620AED 9,991,0002,16317 Oct 2022Resale
11062-bed1,339AED 2,650,0001,98015 Sep 2022Resale
14023-bed1,840AED 4,185,8882,2752 Sep 2022Resale
17062-bed1,339AED 2,544,8831,90111 Aug 2022Resale-1% from AED 2.57m in 2021
2023-bed1,840AED 4,216,8882,2925 Aug 2022Resale
G011-bed837AED 1,792,8882,1431 Aug 2022Resale
15062-bed1,339AED 2,600,0001,94221 Jul 2022Resale+4% from AED 2.51m in 2020
2072-bed1,343AED 2,561,8881,90819 Jul 2022Resale
3023-bed1,840AED 4,222,8882,2954 Jul 2022Resale
G033-bed1,839AED 4,188,8882,27814 Jun 2022Resale
9033-bed1,839AED 4,260,8882,3179 Jun 2022Resale
3033-bed1,839AED 4,214,8882,2922 Jun 2022Resale
12023-bed1,840AED 4,297,8882,33626 May 2022Resale
19041-bed745AED 1,450,0001,94626 May 2022Resale-7% from AED 1.56m in 2020
10072-bed1,344AED 2,600,8881,93520 Apr 2022Resale
1033-bed1,839AED 4,195,8882,28212 Apr 2022Resale
4062-bed1,339AED 2,798,8882,09112 Apr 2022Resale
4023-bed1,840AED 4,231,8882,30018 Mar 2022Resale
2033-bed1,839AED 4,205,8882,2877 Mar 2022Resale
2062-bed1,339AED 2,786,8882,0827 Mar 2022Resale
9023-bed1,840AED 4,187,4302,2767 Mar 2022Resale
2052-bed1,283AED 2,725,3322,12525 Feb 2022Resale
6023-bed1,840AED 4,249,8882,30921 Feb 2022Resale
3062-bed1,339AED 2,793,8882,0877 Feb 2022Resale
7023-bed1,840AED 4,255,8882,3137 Feb 2022Resale
4052-bed1,283AED 2,849,8882,22228 Jan 2022Resale
7062-bed1,339AED 2,544,2011,90128 Jan 2022Resale
20024-bed4,136AED 7,100,0001,71726 Jan 2022Resale
11023-bed1,840AED 4,074,4442,21424 Jan 2022Resale
6072-bed1,343AED 2,285,5941,70219 Jan 2022Resale
17023-bed1,840AED 4,209,8882,28814 Jan 2022Resale
6062-bed1,339AED 2,724,8882,03619 Dec 2021Resale
3052-bed1,283AED 2,761,8882,15313 Dec 2021Resale
18023-bed1,840AED 4,049,1722,2009 Dec 2021Resale
14062-bed1,339AED 2,350,0001,75630 Nov 2021Resale
5052-bed1,283AED 2,770,8882,1603 Nov 2021Off-plan
13033-bed1,839AED 3,260,0001,77328 Oct 2021Off-plan
12033-bed1,839AED 3,778,4522,05526 Oct 2021Off-plan
9052-bed1,283AED 2,682,8882,09225 Oct 2021Off-plan
18033-bed1,839AED 3,977,8882,16324 Oct 2021Off-plan
19023-bed1,840AED 4,061,8882,2079 Oct 2021Off-plan
11011-bed826AED 1,699,8882,0587 Oct 2021Off-plan
20014-bed4,905AED 9,456,8881,92814 Sep 2021Off-plan
9072-bed1,343AED 2,240,8881,66913 Sep 2021Off-plan
5072-bed1,343AED 2,401,8881,78929 Aug 2021Off-plan
17062-bed1,339AED 2,571,8881,92116 Jun 2021Off-plan
14052-bed1,283AED 1,400,0001,0927 Jun 2021Off-plan
5033-bed1,839AED 3,642,8881,98123 May 2021Off-plan
12062-bed1,339AED 2,675,8881,99918 May 2021Off-plan
7011-bed826AED 1,674,8882,02728 Apr 2021Off-plan
8052-bed1,283AED 2,507,8881,95526 Nov 2020Off-plan
18052-bed1,283AED 2,598,8882,02626 Nov 2020Off-plan
15062-bed1,339AED 2,509,8881,87526 Nov 2020Off-plan
14033-bed1,839AED 3,496,8881,90218 Jun 2020Off-plan
18011-bed826AED 1,592,8881,92819 Apr 2020Off-plan
5011-bed826AED 1,548,8881,87526 Feb 2020Off-plan
6052-bed1,283AED 2,503,8881,95223 Feb 2020Off-plan
7052-bed1,283AED 2,507,8881,95518 Feb 2020Off-plan
8072-bed1,343AED 2,242,8881,67013 Feb 2020Off-plan
19041-bed745AED 1,564,8882,10010 Feb 2020Off-plan
11041-bed745AED 1,457,8881,95619 Jan 2020Off-plan

The official record

Checked, not found. We could not match this tower to a building name in the Dubai Land Department register, so sales before 2020, offices, shops, mortgages and gifts are not shown.

Get a message when something changes in The Cove Building 1
Sales, price cuts, new adverts, rents and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from The Cove Building 1, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
South-westThe Cove Building 3, a tower 119 m away · Dubai Creek and Ras Al Khor 1.7 km · Meydan racecourse 6.8 km · Burj Al Arab and the sea 17.5 km · Dubai Marina skyline 24.7 km
WestThe Cove Building 2, a tower 63 m away · The Cove II Building 4, a tower 124 m away · Dubai Design District 5.1 km · DIFC 6.7 km · Burj Khalifa 7.2 km · Sheikh Zayed Road 8.3 km · Jumeirah beach and the sea 10.7 km
North-westThe Cove II Podium, a tower 125 m away

The building: 15 of 23 questions answered

Each answer names its source. Questions with no answer are listed as "checked, not found" so you know we looked.

Developer
Emaar Properties
Completed
2022
Floors
12
Unit mix
1, 2, and 3-bedroom apartments

Amenities: Infinity-edge swimming pool, Fully equipped fitness center, Children’s play area, Landscaped gardens, Multi-purpose community room, 24-hour security, High-speed elevators, Covered parking

Where sources disagree

No conflict found between sources.

Building

Floors, apartments and completion year
The building has 12 floors and was completed in 2022. It contains 1, 2, and 3-bedroom apartments.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").
Amenities list
Amenities include an infinity-edge pool, gym, children's play area, landscaped gardens, a community room, 24-hour security, high-speed elevators, and covered parking.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Resident and public material found on the open web (one passage per block; source and date under each).
Can you use the balcony?
Yes, apartments come with private balconies offering views of the creek, parklands, or skyline.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").
Is there a doorman or concierge?
The building has an elegant lobby and reception.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").

Watch-outs

Overall rating
In the community, the overall resident rating is 4.4 out of 5.
Reported by a site · live adverts: community guide
Security staff
The building features 24-hour security and CCTV surveillance.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Resident and public material found on the open web (one passage per block; source and date under each).
Maintenance and cleanliness of common areas
In the community, the maintenance rating is 4.3 out of 5.
Reported by a site · live adverts: community guide

Developer

Who is the developer?
The developer is Emaar Properties.
Reported by a site · Developer material (the developer's own project page and brochure; marketing text, not residents)., Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").
Finishes
Apartments feature premium finishes, modern kitchens, and floor-to-ceiling windows.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").
Delivery record (on time or late)
The building was completed in 2022. Additional phases of The Cove are set for handover in Q1 2026.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Resident and public material found on the open web (one passage per block; source and date under each).

Parking

Resident parking
The building provides secure, covered parking spaces for residents within the tower.
Reported by a site · Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").

People

Who are my neighbours?
In the community, residents describe it as family-friendly with a mix of professionals and families. It is noted for being spacious and less congested than other areas.
Reported by a site · live adverts: community guide

Around

Entertainment within a 15-minute walk
In the community, entertainment options include a 6km waterfront promenade, Creek Beach, outdoor fitness areas, and dining at waterfront restaurants and food trucks.
Reported by a site · live adverts: community guide, Developer material (the developer's own project page and brochure; marketing text, not residents).
Metro and public transport
In the community, the nearest metro stations are Creek (8 minutes drive) and Al Jadaf (10 minutes drive). Bus stops are within walking distance, and a marine transport station is a 3-minute walk away.
Reported by a site · live adverts: community guide, Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").
What is being built next to it?
In the community, additional phases of The Cove (The Cove 2) are under construction. The wider area is still under development with plans for a mall and tourist attractions.
Reported by a site · live adverts: community guide, Resident and public material found on the open web (one passage per block; source and date under each).

Management

Around The Cove Building 1

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
The Cove Building 1 (this tower)–2,357 (16)
The Cove Building 263 m2,274 (11)
The Cove Building 3119 m2,233 (5)
The Cove II Building 4124 m2,258 (18)
The Cove II Building 5178 m2,177 (12)
Creek Palace181 m2,780 (45)
The Cove II Townhouses190 m– (1)
Creek Bay Tower A202 m2,740 (398)
Creek Bay Tower B202 m2,731 (299)

Drive times with no traffic

ToTimeDistance
Dubai Mall16 min11.6 km
DIFC Gate16 min12.4 km
DXB Terminal 327 min13.3 km
Dubai Marina Mall31 min30.0 km
Mall of the Emirates24 min24.0 km
Kite Beach22 min19.8 km
DWC airport54 min52.9 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 19 Jan 2020 to 19 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Developer material (the developer's own project page and brochure; marketing text, not residents)., Resident and public material found on the open web (one passage per block; source and date under each)., live adverts: community guide), read by an AI model on 21 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: a Google Maps place, resident reviews, guides, a floor plan document, unit positions on a floor, the side and view of each unit, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 21 Oct 2026 first build of this page. No correction yet.

DaliaAIAsk Dalia

Rental data (signed rents, renewals, asking against signed): RENT DUBAI, our sister site for tenants, from Dubai Land Department Ejari leases.