Ellington House 1Completed 2025AED 2,687 per sq ft resale, 36 sales
Sales alert
Home › Dubai Hills Estate › Residential towers › Ellington House › Ellington House 1
Map: Google Maps
Luxury residential tower built by Ellington Properties, handed over in 2025, with 12 floors, 60 resales and 200 off-plan sales on the Land Department record

Ellington House 1, Dubai Hills Estate · by Ellington Properties

1, Ellington House: a resale 2-bed sells for about AED 3.80m

Median of 17 resale 2-bed sales in the 12 months to 22 Oct 2026, from Land Department records (36 resale sales of all sizes). Last sale in the tower: 28 Jul 2026.

The market says
36 resales of all sizes in the 12 months to 22 Oct 2026 at AED 2,687 per sq ft; owners who sold gained 9.6% a year and 0% sold at a loss.
James Paul Booth
The agent's view
“Owners who sold in Ellington House 1 made 9.6% a year, and none of the 28 on record sold at a loss. A 2-bed gives a gross yield of about 6.8% on the signed Ejari rent for this building (AED 270,000 a year), against the median sold price. That is a steady record. I would buy for rent and a long hold, not for a quick resale.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page

James is the human, licensed broker. Dalia, in the yellow bar, is the AI analyst.

Renting, or buying to let? Signed rents across the area: rent prices on RENT DUBAI →
Signed rent, 2-bed
AED 270,000 a year (36 signed Ejari leases in this building, 12 months) · gross yield 6.8% (signed rent)
Size
12 floors
148 units with a sale on record since 2022.
39sales in the 12 months to 22 Oct 2026: 36 resale
0for sale now
Under 1 monthTime to sell: the homes now listed, at the last year's pace
AIWritten by Dalia, an AI data analyst. Data to 21 Oct 2026. Built 23 Oct 2026.

Pictures of Ellington House 1

main gallery on Propsearch (whole project ellington-house)
main gallery on Propsearch (whole project ellington-house)
Photo: propsearch.ae
main gallery on Propsearch (whole project ellington-house)
main gallery on Propsearch (whole project ellington-house)
Photo: propsearch.ae
main gallery on Propsearch (whole project ellington-house)
main gallery on Propsearch (whole project ellington-house)
Photo: propsearch.ae

20 pictures of this building: developer renders, photos. Each shows its source; select one to open it there. A drawing is made by BUY DUBAI from real pictures and is marked as a drawing.

Ellington House 1 on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, by the developer or by an earlier buyer (a Land Department "delayed sell"). The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 22 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A sold median needs 10 sales, an advert median 3 adverts.

TypeResale: soldResale: per sq ftRent a year
1-bedAED 2,100,000 (14)2,568– (2)
2-bedAED 3,800,000 (17)2,908– (0)
3-bed– (under 10)–– (1)

Sold prices: Land Department sale records to 22 Oct 2026, BUY DUBAI facts cube. Asking and rent are adverts, not contracts.

Sales we leave out of every median, count and chart (14 of 261 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (14); a sale at exactly the same price as that unit's sale before (0); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Too few resale sales to state a yearly change

The chart shows the off-plan sales by quarter, because the tower has more quarters with 10 or more of them than resale sales.

2024-Q3: AED 2,082 per sq ft, 10 sales2,08224 Q32024-Q4: AED 2,159 per sq ft, 21 sales2,15924 Q42025-Q1: AED 2,238 per sq ft, 10 sales2,23825 Q12025-Q2: AED 2,342 per sq ft, 11 sales2,34225 Q210 sales1021 sales2110 sales1011 sales11Median AED per sq ftNumber of sales

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most; Land Department records, quarters with 10 or more sales.

Every sale since 2022: 261 sales of 148 units

Newest first. Each sale is marked Resale or Off-plan. The last column shows the change from the same unit's sale before.

UnitTypeSq ftPriceAED per sq ftDateMarketAgainst the sale before
5031-bed794AED 1,467,8041,84828 Jul 2026Resale
2062-bed1,366AED 2,519,6211,84428 Jul 2026Resale
5111-bed843AED 1,557,0151,8472 Jul 2026Resale
10132-bed1,302AED 2,406,8281,84922 May 2026Resale
11091-bed890AED 2,800,0003,14711 May 2026Resale+29% from AED 2.16m in 2025
8103-bed1,743AED 6,350,0003,64430 Apr 2026Resale+18% from AED 5.40m in 2025
1091-bed843AED 2,350,0002,78827 Apr 2026Resale+40% from AED 1.68m in 2024
12043-bed1,733AED 6,400,0003,69330 Mar 2026Resale+71% from AED 3.74m in 2023
5062-bed1,366AED 4,350,0003,18416 Mar 2026Resale+73% from AED 2.52m in 2026
12053-bed1,757AED 6,200,0003,53016 Mar 2026Resale+62% from AED 3.84m in 2023
12033-bed1,726AED 6,300,0003,6503 Mar 2026Resale+66% from AED 3.79m in 2023
10042-bed1,368AED 4,400,0003,2172 Mar 2026Resale+8% from AED 4.06m in 2025
7052-bed1,274AED 4,275,0003,3563 Feb 2026Resale+53% from AED 2.80m in 2025
5132-bed1,302AED 3,800,0002,9192 Feb 2026Resale+67% from AED 2.28m in 2025
7111-bed841AED 2,425,0002,88422 Jan 2026Resale+38% from AED 1.76m in 2025
5062-bed1,366AED 2,519,6081,8449 Jan 2026Resale
11062-bed1,366AED 4,360,0003,19130 Dec 2025Resale+31% from AED 3.34m in 2025
10103-bed1,740AED 4,400,0002,52823 Dec 2025Resale+49% from AED 2.96m in 2025
11031-bed794AED 2,250,0002,8324 Dec 2025Resale+26% from AED 1.79m in 2023
11042-bed1,368AED 3,976,8282,90827 Nov 2025Resale
1121-bed797AED 2,350,0002,94924 Nov 2025Resale+53% from AED 1.53m in 2023
1031-bed793AED 2,050,0002,58721 Nov 2025Resale+35% from AED 1.52m in 2022
11072-bed1,362AED 3,994,7502,93314 Nov 2025Resale+35% from AED 2.97m in 2023
2042-bed1,368AED 2,337,8281,70913 Nov 2025Resale
5132-bed1,302AED 2,276,9981,74912 Nov 2025Resale
2111-bed843AED 2,150,0002,55010 Nov 2025Resale+28% from AED 1.68m in 2022
6091-bed890AED 1,553,0981,7455 Nov 2025Resale
3042-bed1,368AED 4,200,0003,0715 Nov 2025Resale+48% from AED 2.84m in 2024
5121-bed843AED 2,350,0002,7894 Nov 2025Resale+38% from AED 1.70m in 2025
6082-bed1,365AED 4,086,8282,9944 Nov 2025Resale
6042-bed1,368AED 2,391,3371,74828 Oct 2025Resale bulk transfer
6031-bed794AED 1,388,4641,74828 Oct 2025Resale bulk transfer
6011-bed866AED 1,516,3661,75128 Oct 2025Resale bulk transfer
6052-bed1,274AED 2,230,8471,75128 Oct 2025Resale bulk transfer
6021-bed793AED 1,384,1311,74628 Oct 2025Resale bulk transfer
2132-bed1,302AED 3,350,0002,57327 Oct 2025Resale+27% from AED 2.63m in 2022
5103-bed1,740AED 3,215,9851,84824 Oct 2025Resale
5052-bed1,274AED 2,230,8471,75124 Oct 2025Resale
1011-bed797AED 1,890,0002,37224 Oct 2025Resale+21% from AED 1.56m in 2022
1101-bed843AED 1,975,0002,34423 Oct 2025Resale+21% from AED 1.63m in 2022
7091-bed890AED 2,275,0002,55722 Oct 2025Resale+20% from AED 1.90m in 2024
10042-bed1,368AED 4,060,0002,96821 Oct 2025Resale+61% from AED 2.53m in 2025
6132-bed1,302AED 2,276,9981,74920 Oct 2025Resale
10111-bed843AED 1,557,0151,84717 Oct 2025Resale
6062-bed1,366AED 2,383,4261,74414 Oct 2025Resale
3011-bed866AED 2,000,0002,30913 Oct 2025Resale+32% from AED 1.52m in 2022
2052-bed1,274AED 3,200,0002,51212 Oct 2025Resale+29% from AED 2.48m in 2023
10042-bed1,368AED 2,527,9701,84812 Oct 2025Resale
5121-bed843AED 1,700,8282,01812 Oct 2025Resale
1071-bed890AED 2,000,0002,24810 Oct 2025Resale+17% from AED 1.71m in 2022
6103-bed1,740AED 3,042,1501,7487 Oct 2025Resale
8082-bed1,366AED 4,000,0002,9296 Oct 2025Resale+48% from AED 2.70m in 2023
10121-bed843AED 1,425,6481,6926 Oct 2025Resale
10103-bed1,740AED 2,955,2321,6986 Oct 2025Resale
4091-bed890AED 1,900,0002,1356 Oct 2025Resale+22% from AED 1.55m in 2022
3132-bed1,302AED 2,950,0002,2666 Oct 2025Resale+30% from AED 2.28m in 2022
6111-bed843AED 2,318,8282,7516 Oct 2025Resale
7132-bed1,302AED 3,400,0002,6116 Oct 2025Resale+26% from AED 2.70m in 2024
4011-bed866AED 1,900,0002,1946 Oct 2025Resale+25% from AED 1.52m in 2022
6072-bed1,362AED 2,375,5141,7444 Oct 2025Resale
2011-bed866AED 1,850,0002,13630 Sep 2025Resale+9% from AED 1.70m in 2022
11132-bed1,302AED 3,050,0002,34226 Sep 2025Resale+30% from AED 2.34m in 2022
8091-bed890AED 2,200,0002,47226 Sep 2025Resale+13% from AED 1.95m in 2024
4021-bed793AED 1,765,0002,22724 Sep 2025Resale+28% from AED 1.38m in 2022
7082-bed1,366AED 3,950,0002,89224 Sep 2025Resale+34% from AED 2.94m in 2024
6121-bed843AED 1,467,5781,74219 Sep 2025Resale
10052-bed1,274AED 2,167,1091,70119 Sep 2025Resale
4042-bed1,368AED 3,800,0002,77815 Sep 2025Resale+30% from AED 2.92m in 2024
11052-bed1,274AED 3,500,0002,74810 Jul 2025Off-plan, sold again+29% from AED 2.72m in 2023
8042-bed1,368AED 3,700,0002,70519 Jun 2025Off-plan, sold again+40% from AED 2.63m in 2023
3121-bed843AED 1,920,0002,27811 Jun 2025Off-plan, sold again+31% from AED 1.47m in 2022
5042-bed1,368AED 4,304,8283,1474 Jun 2025Off-plan
4031-bed794AED 1,760,0002,21627 May 2025Off-plan, sold again+27% from AED 1.39m in 2022
4121-bed843AED 1,845,0002,18930 Apr 2025Off-plan, sold again+26% from AED 1.47m in 2022
7072-bed1,362AED 3,530,0002,59224 Apr 2025Off-plan, sold again+18% from AED 2.99m in 2024
7062-bed1,366AED 3,500,0002,56210 Apr 2025Off-plan, sold again+19% from AED 2.95m in 2024
8103-bed1,743AED 5,400,0003,0998 Apr 2025Off-plan, sold again+52% from AED 3.54m in 2023
3111-bed841AED 1,850,0002,2008 Apr 2025Off-plan, sold again+26% from AED 1.47m in 2022
4111-bed841AED 1,865,0002,2187 Apr 2025Off-plan, sold again+27% from AED 1.47m in 2022
10021-bed793AED 1,850,0002,3344 Apr 2025Off-plan, sold again+26% from AED 1.46m in 2024
4132-bed1,302AED 2,825,0002,16917 Mar 2025Off-plan, sold again+24% from AED 2.28m in 2022
4052-bed1,274AED 2,900,0002,2776 Mar 2025Off-plan, sold again+30% from AED 2.23m in 2022
11091-bed890AED 2,164,2842,4321 Mar 2025Off-plan, sold again+36% from AED 1.60m in 2022
2103-bed1,740AED 4,800,0002,75814 Feb 2025Off-plan, sold again+38% from AED 3.48m in 2022
8121-bed843AED 2,049,0002,43113 Feb 2025Off-plan, sold again+28% from AED 1.60m in 2023
7021-bed793AED 1,650,0002,08222 Jan 2025Off-plan, sold again+19% from AED 1.38m in 2022
7121-bed843AED 1,810,0002,14820 Jan 2025Off-plan, sold again+23% from AED 1.47m in 2022
7111-bed841AED 1,760,0002,09314 Jan 2025Off-plan, sold again+20% from AED 1.47m in 2022
11062-bed1,366AED 3,336,8282,4426 Jan 2025Off-plan
7052-bed1,274AED 2,800,0002,1983 Jan 2025Off-plan, sold again+26% from AED 2.23m in 2022
4103-bed1,743AED 3,870,0002,22130 Dec 2024Off-plan, sold again+27% from AED 3.04m in 2022
7011-bed866AED 2,000,0002,30925 Dec 2024Off-plan, sold again+32% from AED 1.52m in 2022
11082-bed1,366AED 3,200,0002,34316 Dec 2024Off-plan, sold again+30% from AED 2.45m in 2022
7132-bed1,302AED 2,700,0002,07313 Dec 2024Off-plan, sold again+19% from AED 2.28m in 2022
7091-bed890AED 1,900,0002,13513 Dec 2024Off-plan, sold again+22% from AED 1.55m in 2022
7062-bed1,366AED 2,950,0002,15928 Nov 2024Off-plan, sold again+24% from AED 2.38m in 2022
7103-bed1,743AED 3,740,0002,14628 Nov 2024Off-plan, sold again+23% from AED 3.04m in 2022
7082-bed1,366AED 2,945,0002,15626 Nov 2024Off-plan, sold again+24% from AED 2.38m in 2022
7042-bed1,368AED 2,955,0002,16026 Nov 2024Off-plan, sold again+24% from AED 2.39m in 2022
4062-bed1,366AED 2,950,0002,15925 Nov 2024Off-plan, sold again+24% from AED 2.38m in 2022
11111-bed841AED 1,852,5002,20322 Nov 2024Off-plan, sold again+22% from AED 1.51m in 2022
7031-bed794AED 1,750,0002,20322 Nov 2024Off-plan, sold again+26% from AED 1.39m in 2022
7072-bed1,362AED 2,992,0002,19722 Nov 2024Off-plan, sold again+26% from AED 2.38m in 2022
11121-bed843AED 1,815,0002,15420 Nov 2024Off-plan, sold again+20% from AED 1.51m in 2022
4042-bed1,368AED 2,925,0002,13918 Nov 2024Off-plan, sold again+22% from AED 2.39m in 2022
4082-bed1,366AED 2,890,0002,11613 Nov 2024Off-plan, sold again+21% from AED 2.38m in 2022
4072-bed1,362AED 3,000,0002,20331 Oct 2024Off-plan, sold again+26% from AED 2.38m in 2022
5072-bed1,362AED 2,375,8281,74518 Oct 2024Off-plan
8011-bed866AED 1,825,0002,10710 Oct 2024Off-plan, sold again+8% from AED 1.69m in 2024
3042-bed1,368AED 2,840,0002,07610 Oct 2024Off-plan, sold again+19% from AED 2.39m in 2022
3052-bed1,274AED 2,640,0002,0731 Oct 2024Off-plan, sold again+18% from AED 2.23m in 2022
1091-bed843AED 1,680,0001,99326 Sep 2024Off-plan, sold again+5% from AED 1.60m in 2023
3031-bed794AED 1,670,0002,1023 Sep 2024Off-plan, sold again+20% from AED 1.39m in 2022
3082-bed1,365AED 2,800,0002,05122 Aug 2024Off-plan, sold again+17% from AED 2.38m in 2022
10011-bed866AED 2,000,0002,30916 Aug 2024Off-plan, sold again+25% from AED 1.60m in 2024
3103-bed1,743AED 3,550,0002,03712 Aug 2024Off-plan, sold again+17% from AED 3.04m in 2022
3072-bed1,362AED 2,805,0002,06012 Aug 2024Off-plan, sold again+18% from AED 2.38m in 2022
3021-bed793AED 1,660,8002,0961 Aug 2024Off-plan, sold again+20% from AED 1.38m in 2022
3062-bed1,366AED 3,200,0002,34229 Jul 2024Off-plan, sold again+34% from AED 2.38m in 2022
3091-bed890AED 1,830,0002,05724 Jul 2024Off-plan, sold again+18% from AED 1.55m in 2022
10031-bed794AED 1,850,0002,3291 Jul 2024Off-plan, sold again+26% from AED 1.47m in 2024
11103-bed1,743AED 3,920,0002,25010 Jun 2024Off-plan, sold again+25% from AED 3.13m in 2022
10091-bed890AED 1,508,8281,6966 Jun 2024Off-plan
10072-bed1,362AED 2,511,2451,84423 May 2024Off-plan
8091-bed890AED 1,950,0002,19110 May 2024Off-plan, sold again+8% from AED 1.81m in 2023
10082-bed1,365AED 2,880,0002,11019 Feb 2024Off-plan, sold again+14% from AED 2.52m in 2024
10021-bed793AED 1,463,2201,84618 Jan 2024Off-plan
10011-bed866AED 1,603,0071,85118 Jan 2024Off-plan
10031-bed794AED 1,467,7901,84816 Jan 2024Off-plan
10082-bed1,365AED 2,520,4031,84616 Jan 2024Off-plan
8011-bed866AED 1,690,0001,9515 Jan 2024Off-plan, sold again+11% from AED 1.52m in 2022
8132-bed1,302AED 2,495,0001,91628 Dec 2023Off-plan, sold again+10% from AED 2.28m in 2022
8021-bed793AED 1,570,0001,9818 Dec 2023Off-plan, sold again+14% from AED 1.38m in 2022
12012-bed1,685AED 3,665,3682,1756 Dec 2023Off-plan, sold again+9% from AED 3.35m in 2023
12061-bed893AED 1,943,6412,1766 Dec 2023Off-plan, sold again+9% from AED 1.78m in 2023
12083-bed1,884AED 4,110,8582,1826 Dec 2023Off-plan, sold again+9% from AED 3.76m in 2023
12033-bed1,726AED 3,791,2802,1975 Dec 2023Off-plan, sold again+9% from AED 3.47m in 2023
12073-bed2,461AED 5,429,9262,2075 Dec 2023Off-plan, sold again+9% from AED 4.97m in 2023
12023-bed2,194AED 4,829,5762,2025 Dec 2023Off-plan, sold again+9% from AED 4.42m in 2023
12053-bed1,757AED 3,835,7502,1841 Dec 2023Off-plan, sold again+9% from AED 3.51m in 2023
12043-bed1,733AED 3,744,9082,1611 Dec 2023Off-plan, sold again+9% from AED 3.43m in 2023
8031-bed794AED 1,600,0002,01427 Oct 2023Off-plan, sold again+15% from AED 1.39m in 2022
8052-bed1,274AED 2,450,0001,92313 Oct 2023Off-plan, sold again+10% from AED 2.23m in 2022
8082-bed1,366AED 2,700,0001,9775 Oct 2023Off-plan, sold again+13% from AED 2.38m in 2022
8121-bed843AED 1,600,0001,8995 Oct 2023Off-plan, sold again+9% from AED 1.47m in 2022
5082-bed1,365AED 2,584,1791,8935 Oct 2023Off-plan
8111-bed841AED 1,650,0001,9622 Oct 2023Off-plan, sold again+12% from AED 1.47m in 2022
11011-bed866AED 1,931,8282,23017 Jul 2023Off-plan
8062-bed1,366AED 2,800,0002,04912 Jul 2023Off-plan, sold again+18% from AED 2.38m in 2022
8072-bed1,362AED 2,800,0002,05615 Jun 2023Off-plan, sold again+18% from AED 2.38m in 2022
8042-bed1,368AED 2,635,0001,92630 May 2023Off-plan, sold again+10% from AED 2.39m in 2022
12043-bed1,733AED 3,425,7201,97723 May 2023Off-plan
12053-bed1,757AED 3,508,8201,99823 May 2023Off-plan
12061-bed893AED 1,777,9801,99023 May 2023Off-plan
12073-bed2,461AED 4,967,1202,01823 May 2023Off-plan
12083-bed1,884AED 3,760,4801,99622 May 2023Off-plan
12033-bed1,726AED 3,468,1402,00919 May 2023Off-plan
12023-bed2,194AED 4,417,9402,01419 May 2023Off-plan
12012-bed1,685AED 3,352,9601,99019 May 2023Off-plan
11021-bed793AED 1,801,8282,27315 May 2023Off-plan
11072-bed1,362AED 2,965,8282,17826 Apr 2023Off-plan
1121-bed797AED 1,533,8281,92528 Feb 2023Off-plan
11052-bed1,274AED 2,720,8282,13623 Feb 2023Off-plan
8091-bed890AED 1,808,2002,03215 Feb 2023Off-plan, sold again+16% from AED 1.55m in 2022
8103-bed1,743AED 3,541,8002,03315 Feb 2023Off-plan, sold again+16% from AED 3.04m in 2022
11031-bed794AED 1,789,8282,25313 Feb 2023Off-plan
5091-bed890AED 1,770,8281,99013 Feb 2023Off-plan
1091-bed843AED 1,602,8281,9016 Jan 2023Off-plan
2082-bed1,366AED 2,546,8281,8656 Jan 2023Off-plan
1083-bed1,741AED 3,300,8281,8966 Jan 2023Off-plan
1112-bed1,301AED 2,443,8281,8784 Jan 2023Off-plan
2052-bed1,274AED 2,481,8281,9484 Jan 2023Off-plan
11103-bed1,743AED 3,129,0691,79622 Dec 2022Off-plan
2121-bed843AED 1,610,8281,91121 Dec 2022Off-plan
2132-bed1,302AED 2,634,8282,02419 Dec 2022Off-plan
1062-bed1,273AED 2,388,8281,87616 Dec 2022Off-plan
2103-bed1,740AED 3,483,8282,00215 Dec 2022Off-plan
2021-bed793AED 1,534,8281,93723 Nov 2022Off-plan
1101-bed843AED 1,628,8281,93321 Nov 2022Off-plan
1031-bed793AED 1,520,8281,91921 Nov 2022Off-plan
1011-bed797AED 1,564,8281,96317 Nov 2022Off-plan
1021-bed865AED 1,697,8281,96417 Nov 2022Off-plan
2091-bed890AED 1,774,8281,9953 Nov 2022Off-plan
1041-bed794AED 1,557,8281,9613 Nov 2022Off-plan
2031-bed794AED 1,552,8281,9553 Nov 2022Off-plan
1052-bed1,367AED 2,647,8281,9373 Nov 2022Off-plan
2011-bed866AED 1,699,8281,9623 Nov 2022Off-plan
2072-bed1,362AED 2,642,8281,9413 Nov 2022Off-plan
2111-bed843AED 1,681,8281,9953 Nov 2022Off-plan
10062-bed1,366AED 2,070,1791,5153 Nov 2022Off-plan
1071-bed890AED 1,706,8281,9182 Nov 2022Off-plan
11111-bed841AED 1,514,9341,80231 Oct 2022Off-plan
11121-bed843AED 1,509,5091,79131 Oct 2022Off-plan
3132-bed1,302AED 2,276,9981,74914 Oct 2022Off-plan
3111-bed841AED 1,472,8531,75214 Oct 2022Off-plan
3091-bed890AED 1,553,0981,74514 Oct 2022Off-plan
3121-bed843AED 1,467,5781,74214 Oct 2022Off-plan
3103-bed1,743AED 3,042,1501,74614 Oct 2022Off-plan
3062-bed1,366AED 2,383,4261,74413 Oct 2022Off-plan bulk transfer
9031-bed794AED 1,394,0181,75513 Oct 2022Off-plan
3072-bed1,362AED 2,375,5141,74413 Oct 2022Off-plan bulk transfer
3031-bed794AED 1,388,4641,74813 Oct 2022Off-plan
9011-bed866AED 1,522,4311,75813 Oct 2022Off-plan
3052-bed1,274AED 2,230,8471,75113 Oct 2022Off-plan
3042-bed1,368AED 2,392,0911,74913 Oct 2022Off-plan
3021-bed793AED 1,384,1311,74613 Oct 2022Off-plan
3082-bed1,365AED 2,384,1791,74713 Oct 2022Off-plan bulk transfer
9021-bed793AED 1,389,6681,75313 Oct 2022Off-plan
3011-bed866AED 1,516,3661,75113 Oct 2022Off-plan
11082-bed1,366AED 2,452,2991,7954 Oct 2022Off-plan
11132-bed1,302AED 2,342,0551,7984 Oct 2022Off-plan
4103-bed1,743AED 3,042,1501,7464 Oct 2022Off-plan
11091-bed890AED 1,597,4721,7953 Oct 2022Off-plan
9121-bed843AED 1,473,4491,7483 Oct 2022Off-plan
9132-bed1,302AED 2,286,1061,7563 Oct 2022Off-plan
9103-bed1,740AED 3,054,3191,7553 Oct 2022Off-plan
9111-bed843AED 1,478,7441,7543 Oct 2022Off-plan
4121-bed843AED 1,467,5781,74229 Sep 2022Off-plan
9072-bed1,362AED 2,385,0161,75129 Sep 2022Off-plan bulk transfer
9091-bed890AED 1,559,3101,75229 Sep 2022Off-plan
4132-bed1,302AED 2,276,9981,74829 Sep 2022Off-plan
9042-bed1,368AED 2,400,9031,75529 Sep 2022Off-plan
9052-bed1,274AED 2,239,7711,75829 Sep 2022Off-plan
4091-bed890AED 1,553,0981,74529 Sep 2022Off-plan
4111-bed841AED 1,472,8531,75229 Sep 2022Off-plan
9082-bed1,365AED 2,393,7161,75429 Sep 2022Off-plan bulk transfer
9062-bed1,366AED 2,392,9591,75129 Sep 2022Off-plan bulk transfer
4042-bed1,368AED 2,391,3371,74828 Sep 2022Off-plan
4072-bed1,362AED 2,375,5141,74428 Sep 2022Off-plan bulk transfer
4082-bed1,366AED 2,384,1791,74628 Sep 2022Off-plan bulk transfer
4052-bed1,274AED 2,230,8471,75128 Sep 2022Off-plan
4031-bed794AED 1,388,4641,74828 Sep 2022Off-plan
4021-bed793AED 1,384,1311,74628 Sep 2022Off-plan
4062-bed1,366AED 2,383,4261,74428 Sep 2022Off-plan bulk transfer
4011-bed866AED 1,516,3661,75128 Sep 2022Off-plan
8132-bed1,302AED 2,276,8281,74828 Sep 2022Off-plan
7011-bed866AED 1,516,8281,75127 Sep 2022Off-plan
7052-bed1,274AED 2,230,8281,75127 Sep 2022Off-plan
7031-bed794AED 1,388,8281,74827 Sep 2022Off-plan
7042-bed1,368AED 2,390,8281,74827 Sep 2022Off-plan
7121-bed843AED 1,467,8281,74227 Sep 2022Off-plan
8103-bed1,743AED 3,041,8281,74627 Sep 2022Off-plan
8052-bed1,274AED 2,230,8281,75127 Sep 2022Off-plan
8011-bed866AED 1,516,8281,75127 Sep 2022Off-plan
7103-bed1,743AED 3,041,8281,74627 Sep 2022Off-plan
8091-bed890AED 1,552,8281,74527 Sep 2022Off-plan
8072-bed1,362AED 2,375,8281,74527 Sep 2022Off-plan
8111-bed841AED 1,472,8281,75227 Sep 2022Off-plan
8031-bed794AED 1,388,8281,74827 Sep 2022Off-plan
8062-bed1,366AED 2,382,8281,74427 Sep 2022Off-plan
8121-bed843AED 1,467,8281,74227 Sep 2022Off-plan
8042-bed1,368AED 2,390,8281,74827 Sep 2022Off-plan
7132-bed1,302AED 2,276,8281,74827 Sep 2022Off-plan
8082-bed1,366AED 2,384,8281,74627 Sep 2022Off-plan
7091-bed890AED 1,552,8281,74526 Sep 2022Off-plan
8021-bed793AED 1,383,8281,74626 Sep 2022Off-plan
7111-bed841AED 1,472,8281,75226 Sep 2022Off-plan
7021-bed793AED 1,383,8281,74626 Sep 2022Off-plan
7062-bed1,366AED 2,382,8281,74426 Sep 2022Off-plan
7072-bed1,362AED 2,375,8281,74526 Sep 2022Off-plan
7082-bed1,366AED 2,384,8281,74626 Sep 2022Off-plan

The official record

Checked, not found. We could not match this tower to a building name in the Dubai Land Department register, so sales before 2020, offices, shops, mortgages and gifts are not shown.

Get a message when something changes in Ellington House 1
Sales, price cuts, new adverts, rents and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from Ellington House 1, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
NorthSheikh Zayed Road 8.0 km · Burj Khalifa 8.9 km · Jumeirah beach and the sea 9.8 km · DIFC 10.6 km
North-eastMeydan racecourse 5.9 km · Dubai Design District 8.6 km · Dubai Creek and Ras Al Khor 11.0 km
SouthEllington House 2, a tower 98 m away
West399 Hills Park B, a tower 73 m away · Burj Al Arab and the sea 7.8 km · Dubai Marina skyline 12.7 km
North-west399 Hills Park A, a tower 71 m away

The building: 17 of 23 questions answered

Each answer names its source. Questions with no answer are listed as "checked, not found" so you know we looked.

Developer
Ellington Properties
Completed
2025
Floors
12
Unit mix
1, 2 and 3-bedroom apartments

Amenities: Leisure/lounge/lap pool with Baja shelf, Kids' pool and spa, Indoor and outdoor fitness, Yoga room with steam and sauna, Clubhouse with games and dining, Kids' clubhouse, Mini putt, BBQ area, Dog wash, Golf lockers and wash, Bicycle parking with maintenance, EV charging, Lobby lounge with mezzanine library wall and workstations

Where sources disagree

No conflict found between sources.

Building

Floors, apartments and completion year
The building has 12 floors and was completed in 2025. It contains 1, 2 and 3-bedroom apartments.
Our data · our sales data, Resident and public material found on the open web (one passage per block; source and date under each).
Amenities list
Amenities include a lap pool with Baja shelf, kids' pool, spa, indoor and outdoor fitness centers, yoga room, steam and sauna, clubhouses for adults and kids, mini putt, BBQ area, dog wash, golf lockers, bicycle parking with maintenance, EV charging, and a lobby lounge with a library wall.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
What do residents say on the plus side?
One review describes the apartments as ultra-modern with spacious balconies, a clubhouse, and greenery.
Residents say · Resident and public material found on the open web (one passage per block; source and date under each).
Can you use the balcony?
Yes, 1-, 2- and 3-bedroom apartments are described as having balconies.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Is there a doorman or concierge?
Agency pages advertise valet parking services.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
What do residents say about the pool?
One review mentions the pool area as part of the ultra-modern amenities.
Residents say · Resident and public material found on the open web (one passage per block; source and date under each).

Watch-outs

Overall rating
There are no building-specific resident reviews yet. Community reviews for Dubai Hills Estate rate the area 4.4 out of 5 overall.
Reported by a site · live adverts: community guide, Resident and public material found on the open web (one passage per block; source and date under each).

Developer

Who is the developer?
The developer is Ellington Properties.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Finishes
Apartments feature open-plan kitchens with quartz countertops, lacquer cabinets, and porcelain floors. Bedrooms have floor-to-ceiling windows and soft-close wardrobes, while bathrooms use a minimalist palette with water-saving fixtures.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Delivery record (on time or late)
Handover ran in 2025, with the DLD registered completion date on 28 February 2025. The building reached 100% inspection in July 2025, about five months after the initial Q1 2025 brief.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Quality of construction
The developer reported strong post-handover performance with no major snagging observed. However, independent commentary notes minority complaints about construction quality for the brand and advises proper snagging.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
After-sales and repairs
The developer reported that rents ran about 28% above the market average in the three months before the House II handover announcement, citing strong occupancy and post-handover performance.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Parking

Resident parking
Covered resident parking is provided: one space for 1- and 2-bedroom apartments, and two spaces for 3-bedroom apartments. EV charging and bicycle parking are also available.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

People

Who are my neighbours?
In the community, residents are primarily working professionals and retirees, with smaller proportions of students, young professionals, and families. Top renter nationalities include the United Kingdom, Russia, Lebanon, and Egypt.
Reported by a site · live adverts: community guide, Resident and public material found on the open web (one passage per block; source and date under each)., Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").

Around

Entertainment within a 15-minute walk
In the community, Dubai Hills Mall, Dubai Hills Golf Club, and Dubai Hills Park are nearby. The mall is about an 8-minute drive away.
Reported by a site · live adverts: community guide, Resident and public material found on the open web (one passage per block; source and date under each).
Metro and public transport
In the community, public transport is limited mainly to buses. The nearest metro station (Burj Khalifa/Dubai Mall) is about a 12-minute drive away. Bus stops are located nearby, including one at King's College Hospital.
Reported by a site · live adverts: community guide, Resident and public material found on the open web (one passage per block; source and date under each)., Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts").
What is being built next to it?
Later phases Ellington House 2, 3 and 4 are separate projects sharing the name and location.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Management

Around Ellington House 1

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
Ellington House 1 (this tower)–2,789 (37)
399 Hills Park A71 m– (0)
399 Hills Park B73 m2,096 (35)
Ellington House 298 m2,699 (42)
Greenside Residence Tower A202 m2,358 (18)
Greenside Residence Tower B202 m– (4)
Greenside Residence Tower C202 m– (0)
Golf Residences by Fortimo236 m1,999 (40)
Ellington House 4280 m2,503 (11)

Drive times with no traffic

ToTimeDistance
Dubai Mall16 min14.4 km
DIFC Gate16 min15.2 km
DXB Terminal 336 min28.6 km
Dubai Marina Mall20 min17.0 km
Mall of the Emirates11 min8.9 km
Kite Beach12 min9.8 km
DWC airport41 min37.7 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 26 Sep 2022 to 21 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Resident and public material found on the open web (one passage per block; source and date under each)., live adverts: community guide), read by an AI model on 23 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: a Google Maps place, resident reviews, guides, a floor plan document, unit positions on a floor, the side and view of each unit, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 23 Oct 2026 first build of this page. No correction yet.

DaliaAIAsk DaliaAI analyst

Rental data (signed rents, renewals, asking against signed): RENT DUBAI, our sister site for tenants, from Dubai Land Department Ejari leases.