Greenside Residence Tower AOff-planAED 2,257 per sq ft off-plan, 46 sales
Sales alert
Home › Dubai Hills Estate › Residential towers › Greenside Residence › Greenside Residence Tower A
Map: Google Maps
Off-plan mid-range residential tower, not built yet, with 389 off-plan sales on the Land Department record

Greenside Residence Tower A, Dubai Hills Estate

Tower A, Greenside Residence: an off-plan 1-bed sells for about AED 1.61m

Median of 32 off-plan 1-bed sales in the 12 months to 26 Oct 2026, from Land Department records (46 off-plan sales of all sizes). Last sale in the tower: 8 Oct 2026.

The market says
46 off-plan sales of all sizes in the 12 months to 26 Oct 2026 at AED 2,257 per sq ft; 11 homes for sale now.
James Paul Booth
The agent's view
“Greenside Residence Tower A is off-plan, so no owner has sold a completed home here yet. Buyers took 46 homes here in the 12 months to 26 Oct 2026, at about AED 2,257 per sq ft. Sales are slow. Ask for a better payment plan before you sign, and compare the price with a completed tower next door.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page

James is the human, licensed broker. Dalia, in the yellow bar, is the AI analyst.

Renting, or buying to let? Signed rents across the area: rent prices on RENT DUBAI →
Asking now, 1-bed
AED 1,700,000 (5 listings)
Asking now, 2-bed
AED 2,825,000 (4 listings)
Official record
348 registered sales since 2023: 348 apartment
329 units with a sale on record since 2023.
46sales in the 12 months to 26 Oct 2026: 46 off-plan
11for sale now
Off-plannot built yet: every sale so far is off-plan
AIWritten by Dalia, an AI data analyst. Data to 23 Oct 2026. Built 27 Oct 2026.

Pictures of Greenside Residence Tower A

main image on the Emaar project page (checked by eye: render)
main image on the Emaar project page (checked by eye: render)
Render: emaar.com
feature image on the Emaar project page (checked by eye: render)
feature image on the Emaar project page (checked by eye: render)
Render: emaar.com
feature image on the Emaar project page (checked by eye: render)
feature image on the Emaar project page (checked by eye: render)
Render: emaar.com

3 pictures of this building: developer renders. Each shows its source; select one to open it there. A drawing is made by BUY DUBAI from real pictures and is marked as a drawing.

Greenside Residence Tower A on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Construction progress: not found

We found no public progress record for this tower. Ask the developer for the latest inspection report from the Land Department.

Payment plan: not found

We checked the pages we hold for this tower and found no payment plan that passed our checks. We do not guess one. Ask the developer for the current plan.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, by the developer or by an earlier buyer (a Land Department "delayed sell"). The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 26 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A sold median needs 10 sales, an advert median 3 adverts.

TypeOff-plan: soldOff-plan: per sq ftMedian asking
1-bedAED 1,607,888 (32)2,143AED 1,700,000 (5)
2-bedAED 2,540,888 (11)2,365AED 2,825,000 (4)
3-bed– (under 10)–– (2)

Sold prices: Land Department sale records to 26 Oct 2026, BUY DUBAI facts cube. Asking and rent are adverts, not contracts.

Sales we leave out of every median, count and chart (34 of 394 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (0); a sale at exactly the same price as that unit's sale before (34); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Too few off-plan sales to state a yearly change

Median AED 2,257 per sq ft in the 12 months to 26 Oct 2026 (46 off-plan sales). A yearly change needs at least 30 sales in each of the two 12-month periods.

2026-Q1: AED 2,141 per sq ft, 21 sales2,14126 Q126 Q22026-Q3: AED 2,300 per sq ft, 17 sales2,30026 Q321 sales210 sales017 sales17Median AED per sq ftNumber of sales

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most; Land Department records, quarters with 10 or more sales. Off-plan sales are 100% of sales in the last 12 months, so the bars can mix launch and resale prices.

Every sale since 2023: 394 sales of 329 units

Newest first. Each sale is marked Resale or Off-plan. The last column shows the change from the same unit's sale before.

UnitTypeSq ftPriceAED per sq ftDateMarketAgainst the sale before
A2072-bed1,176AED 2,373,8882,0188 Oct 2026Off-plan, sold againsame price as in 2023: transfer
A5101-bed745AED 1,750,8882,35030 Sep 2026Off-plan, sold againsame price as in 2023: transfer
A12181-bed747AED 1,529,8882,04817 Sep 2026Off-plan, sold againsame price as in 2023: transfer
A5031-bed748AED 1,571,8882,10117 Sep 2026Off-plan, sold againsame price as in 2023: transfer
A3031-bed748AED 1,300,0001,73816 Sep 2026Off-plan, sold again-17% from AED 1.57m in 2023
A3171-bed744AED 1,496,8882,01215 Sep 2026Off-plan, sold againsame price as in 2023: transfer
A13143-bed1,555AED 4,114,8882,64610 Sep 2026Off-plan, sold again+12% from AED 3.69m in 2023
A13111-bed733AED 1,978,8882,69927 Aug 2026Off-plan, sold again+12% from AED 1.77m in 2023
A2041-bed748AED 1,745,8882,33412 Aug 2026Off-plan, sold again+12% from AED 1.56m in 2023
AG061-bed900AED 1,619,8881,79911 Aug 2026Off-plan, sold againsame price as in 2024: transfer
A15051-bed744AED 2,000,0502,6883 Aug 2026Off-plan, sold again+26% from AED 1.59m in 2026
A15061-bed748AED 2,000,0502,6743 Aug 2026Off-plan, sold again+25% from AED 1.60m in 2026
A13152-bed1,154AED 2,456,8882,12927 Jul 2026Off-plan, sold again+12% from AED 2.20m in 2023
A13181-bed747AED 1,711,8882,29224 Jul 2026Off-plan, sold again+12% from AED 1.53m in 2023
A13011-bed725AED 1,666,8882,30024 Jul 2026Off-plan, sold again+12% from AED 1.49m in 2023
A13041-bed748AED 1,782,8882,38324 Jul 2026Off-plan, sold again+12% from AED 1.60m in 2023
A13091-bed743AED 2,001,8882,69516 Jul 2026Off-plan, sold again+12% from AED 1.79m in 2023
A13021-bed782AED 1,792,8882,29113 Jul 2026Off-plan, sold again+12% from AED 1.60m in 2023
A13171-bed744AED 1,653,7412,22326 Jun 2026Off-plan, sold again+8% from AED 1.53m in 2023
A19051-bed744AED 1,604,8882,15719 Jun 2026Off-plan, sold againsame price as in 2023: transfer
A13161-bed748AED 1,713,8882,2911 Jun 2026Off-plan, sold again+12% from AED 1.53m in 2023
A13031-bed748AED 1,781,8882,38221 May 2026Off-plan, sold again+12% from AED 1.60m in 2023
A14142-bed1,154AED 2,161,7701,87313 Apr 2026Off-plan, sold againsame price as in 2023: transfer
A4111-bed733AED 1,715,8882,34019 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15092-bed1,076AED 2,540,8882,36117 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15102-bed1,068AED 2,526,8882,36517 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15031-bed748AED 1,601,8882,14117 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15142-bed1,154AED 2,209,8881,91517 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15171-bed747AED 1,538,8882,06017 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15011-bed725AED 1,497,8882,06717 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15122-bed1,082AED 2,743,8882,53517 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15072-bed1,176AED 2,923,8882,48517 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15133-bed1,555AED 3,703,8882,38117 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15112-bed1,080AED 2,704,8882,50517 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15041-bed748AED 1,602,8882,14317 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15061-bed748AED 1,602,8882,14317 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15051-bed744AED 1,592,8882,14117 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15021-bed782AED 1,610,8882,05917 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15151-bed748AED 1,540,8882,06017 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15161-bed744AED 1,531,8882,05917 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A15083-bed1,581AED 3,923,8882,48217 Feb 2026Off-plan, sold againsame price as in 2023: transfer
A12171-bed744AED 1,522,8882,0472 Feb 2026Off-plan, sold again+17% from AED 1.30m in 2025
A7181-bed747AED 1,515,8882,02927 Jan 2026Off-plan, sold againsame price as in 2023: transfer
A2011-bed725AED 1,460,8882,01613 Jan 2026Off-plan, sold againsame price as in 2023: transfer
A16092-bed1,076AED 2,545,8882,36527 Nov 2025Off-plan, sold againsame price as in 2023: transfer
A10132-bed1,082AED 2,888,0002,66931 Oct 2025Off-plan, sold again+6% from AED 2.72m in 2023
A14122-bed1,082AED 2,650,0002,44923 Oct 2025Off-plan, sold again-3% from AED 2.74m in 2023
A11031-bed748AED 1,589,8882,12522 Oct 2025Off-plan, sold againsame price as in 2023: transfer
A9061-bed748AED 1,550,0002,07210 Oct 2025Off-plan, sold again-2% from AED 1.58m in 2023
A7171-bed744AED 1,508,8882,0289 Oct 2025Off-plan, sold againsame price as in 2023: transfer
A7041-bed748AED 1,577,8882,1098 Oct 2025Off-plan, sold againsame price as in 2023: transfer
A5091-bed743AED 1,520,0002,04626 Sep 2025Off-plan, sold again-13% from AED 1.74m in 2023
A4072-bed1,176AED 2,542,8882,16219 Sep 2025Off-plan, sold againsame price as in 2023: transfer
A12171-bed744AED 1,300,0001,7481 Aug 2025Off-plan, sold again-15% from AED 1.52m in 2023
A11181-bed747AED 1,540,0002,06229 Jul 2025Off-plan, sold again+1% from AED 1.53m in 2023
A8072-bed1,176AED 2,850,0002,42320 Jun 2025Off-plan, sold again-1% from AED 2.88m in 2023
A10041-bed748AED 1,950,0002,60713 Jun 2025Off-plan, sold again+23% from AED 1.59m in 2023
A5041-bed748AED 1,475,0001,9724 Jun 2025Off-plan, sold again-6% from AED 1.57m in 2023
A3061-bed748AED 1,425,0001,9053 Jun 2025Off-plan, sold again-9% from AED 1.57m in 2023
A5061-bed748AED 1,400,0001,87125 Apr 2025Off-plan, sold again-11% from AED 1.57m in 2023
A9011-bed725AED 1,480,0002,04211 Mar 2025Off-plan, sold again-0% from AED 1.48m in 2023
A9072-bed1,176AED 2,600,0002,21011 Mar 2025Off-plan, sold again-10% from AED 2.89m in 2023
A17061-bed748AED 1,545,2212,06610 Mar 2025Off-plan, sold again-4% from AED 1.61m in 2023
AP101-bed745AED 1,518,9112,03910 Feb 2025Off-plan
AP051-bed744AED 1,579,0512,12110 Feb 2025Off-plan
AP081-bed747AED 1,523,7612,0406 Feb 2025Off-plan
AP061-bed745AED 1,580,0212,1216 Feb 2025Off-plan
AP031-bed744AED 1,578,0812,1203 Feb 2025Off-plan
AP041-bed745AED 1,580,0212,1213 Feb 2025Off-plan
A3021-bed782AED 1,573,8882,01210 Dec 2024Off-plan, sold againsame price as in 2023: transfer
AP091-bed744AED 1,564,8882,10212 Nov 2024Off-plan
A7051-bed744AED 1,568,8882,1093 Jun 2024Off-plan, sold again-41% from AED 2.67m in 2023
A1141-bed747AED 1,497,8882,0057 Mar 2024Off-plan
A4143-bed1,555AED 3,425,8882,20328 Feb 2024Off-plan
A16031-bed748AED 1,604,8882,14521 Feb 2024Off-plan
A14102-bed1,068AED 2,521,8882,3611 Feb 2024Off-plan
A7011-bed725AED 1,475,8882,03624 Jan 2024Off-plan
A1031-bed748AED 1,559,8882,08518 Jan 2024Off-plan
AG061-bed900AED 1,619,8881,79916 Jan 2024Off-plan
A19011-bed724AED 1,506,8882,08327 Dec 2023Off-plan
A17092-bed1,076AED 2,550,8882,37026 Dec 2023Off-plan
AG041-bed900AED 1,684,8691,87125 Dec 2023Off-plan
AP021-bed782AED 1,533,5901,96013 Dec 2023Off-plan
A6181-bed747AED 1,512,8882,02513 Dec 2023Off-plan
A19051-bed744AED 1,604,8882,1576 Dec 2023Off-plan
A9061-bed748AED 1,584,8882,1195 Dec 2023Off-plan
A3031-bed748AED 1,565,8882,0931 Dec 2023Off-plan
AP011-bed721AED 1,447,8882,00829 Nov 2023Off-plan
A3111-bed733AED 1,705,8882,32729 Nov 2023Off-plan
A1103-bed1,632AED 3,292,8882,01828 Nov 2023Off-plan
A10031-bed748AED 1,586,8882,12122 Nov 2023Off-plan
A4011-bed725AED 1,466,8882,02421 Nov 2023Off-plan
A19102-bed1,068AED 2,545,8882,38321 Nov 2023Off-plan
A9181-bed747AED 1,520,8882,03620 Nov 2023Off-plan
A15171-bed747AED 1,538,8882,06020 Nov 2023Off-plan
A17061-bed748AED 1,608,8882,15120 Nov 2023Off-plan
A15072-bed1,176AED 2,923,8882,48520 Nov 2023Off-plan
A12181-bed747AED 1,529,8882,04820 Nov 2023Off-plan
A18031-bed748AED 1,610,8882,15320 Nov 2023Off-plan
A17051-bed744AED 1,598,8882,14920 Nov 2023Off-plan
A18021-bed782AED 1,619,8882,07020 Nov 2023Off-plan
A15083-bed1,581AED 3,923,8882,48220 Nov 2023Off-plan
A1021-bed782AED 1,567,8882,00420 Nov 2023Off-plan
A2021-bed782AED 1,570,8882,00820 Nov 2023Off-plan
A8021-bed782AED 1,589,8882,03220 Nov 2023Off-plan
A15142-bed1,154AED 2,209,8881,91517 Nov 2023Off-plan
A15092-bed1,076AED 2,540,8882,36117 Nov 2023Off-plan
A15122-bed1,082AED 2,743,8882,53517 Nov 2023Off-plan
A15112-bed1,080AED 2,704,8882,50517 Nov 2023Off-plan
A15133-bed1,555AED 3,703,8882,38117 Nov 2023Off-plan
A15021-bed782AED 1,610,8882,05917 Nov 2023Off-plan
A15051-bed744AED 1,592,8882,14117 Nov 2023Off-plan
A15151-bed748AED 1,540,8882,06017 Nov 2023Off-plan
A15102-bed1,068AED 2,526,8882,36517 Nov 2023Off-plan
A15161-bed744AED 1,531,8882,05917 Nov 2023Off-plan
A15031-bed748AED 1,601,8882,14117 Nov 2023Off-plan
A15061-bed748AED 1,602,8882,14317 Nov 2023Off-plan
A15011-bed725AED 1,497,8882,06717 Nov 2023Off-plan
A15041-bed748AED 1,602,8882,14317 Nov 2023Off-plan
A4111-bed733AED 1,715,8882,34016 Nov 2023Off-plan
A18061-bed748AED 1,611,8882,15516 Nov 2023Off-plan
A18083-bed1,581AED 3,946,8882,49616 Nov 2023Off-plan
A18051-bed744AED 1,601,8882,15316 Nov 2023Off-plan
A18092-bed1,077AED 2,556,8882,37516 Nov 2023Off-plan
A18041-bed748AED 1,611,8882,15516 Nov 2023Off-plan
A18011-bed724AED 1,503,8882,07816 Nov 2023Off-plan
A18102-bed1,068AED 2,540,8882,37816 Nov 2023Off-plan
A14142-bed1,154AED 2,161,7701,87316 Nov 2023Off-plan
A16072-bed1,176AED 2,928,8882,49016 Nov 2023Off-plan
A18072-bed1,176AED 2,939,8882,49916 Nov 2023Off-plan
A1072-bed1,176AED 2,289,8881,94716 Nov 2023Off-plan
A5061-bed748AED 1,571,8882,10115 Nov 2023Off-plan
AG072-bed1,531AED 2,384,8881,55815 Nov 2023Off-plan
A6122-bed1,080AED 2,595,8882,4037 Nov 2023Off-plan
A2011-bed725AED 1,460,8882,0167 Nov 2023Off-plan
AG021-bed1,128AED 1,720,8881,5266 Nov 2023Off-plan
A10171-bed744AED 1,517,8882,0401 Nov 2023Off-plan
A6021-bed782AED 1,583,8882,0241 Nov 2023Off-plan
A4041-bed748AED 1,568,8882,09731 Oct 2023Off-plan
A16133-bed1,555AED 3,710,8882,38631 Oct 2023Off-plan
A2083-bed1,581AED 3,368,8882,13131 Oct 2023Off-plan
A2143-bed1,555AED 3,263,1952,09831 Oct 2023Off-plan
A10041-bed748AED 1,587,8882,12331 Oct 2023Off-plan
A5083-bed1,581AED 3,618,8882,28930 Oct 2023Off-plan
A7072-bed1,176AED 2,798,8882,37930 Oct 2023Off-plan
A4051-bed744AED 1,559,8882,09730 Oct 2023Off-plan
A9152-bed1,154AED 2,184,8881,89330 Oct 2023Off-plan
A7122-bed1,080AED 2,631,8882,43629 Oct 2023Off-plan
A12083-bed1,581AED 3,862,8692,44327 Oct 2023Off-plan
A1011-bed725AED 1,458,8882,01327 Oct 2023Off-plan
A5072-bed1,176AED 2,627,8882,23427 Oct 2023Off-plan
A4181-bed747AED 1,506,8882,01727 Oct 2023Off-plan
A17031-bed748AED 1,607,8882,14925 Oct 2023Off-plan
A1121-bed748AED 1,499,8882,00525 Oct 2023Off-plan
A3132-bed1,082AED 2,494,8882,30525 Oct 2023Off-plan
A19041-bed748AED 1,614,8882,15925 Oct 2023Off-plan
A4122-bed1,080AED 2,523,8882,33625 Oct 2023Off-plan
A17041-bed748AED 1,608,8882,15124 Oct 2023Off-plan
A14083-bed1,581AED 3,916,8882,47724 Oct 2023Off-plan
A7132-bed1,082AED 2,663,8882,46224 Oct 2023Off-plan
AG011-bed783AED 1,474,8881,88324 Oct 2023Off-plan
A9083-bed1,581AED 3,879,8882,45424 Oct 2023Off-plan
A14122-bed1,082AED 2,737,8882,53024 Oct 2023Off-plan
A19092-bed1,077AED 2,561,8882,37924 Oct 2023Off-plan
A19021-bed782AED 1,622,8882,07420 Oct 2023Off-plan
A17021-bed782AED 1,616,8882,06720 Oct 2023Off-plan
A8061-bed748AED 1,580,8882,11320 Oct 2023Off-plan
A6143-bed1,555AED 3,539,8882,27620 Oct 2023Off-plan
A14092-bed1,076AED 2,535,8882,35619 Oct 2023Off-plan
A3021-bed782AED 1,573,8882,01219 Oct 2023Off-plan
A13122-bed1,080AED 2,694,8882,49418 Oct 2023Off-plan
A1061-bed748AED 1,559,8882,08518 Oct 2023Off-plan
A13072-bed1,176AED 2,912,8882,47618 Oct 2023Off-plan
A13083-bed1,581AED 3,909,8882,47318 Oct 2023Off-plan
A13132-bed1,082AED 2,732,8882,52517 Oct 2023Off-plan
A13143-bed1,555AED 3,689,8882,37217 Oct 2023Off-plan
A6083-bed1,581AED 3,703,8882,34317 Oct 2023Off-plan
A13171-bed744AED 1,525,8882,05117 Oct 2023Off-plan
A1051-bed744AED 1,550,8882,08517 Oct 2023Off-plan
A8143-bed1,555AED 3,654,8882,35016 Oct 2023Off-plan
A10101-bed745AED 1,788,8882,40116 Oct 2023Off-plan
A14151-bed748AED 1,537,8882,05616 Oct 2023Off-plan
A9143-bed1,555AED 3,661,8882,35413 Oct 2023Off-plan
A13181-bed747AED 1,532,8882,05212 Oct 2023Off-plan
A8161-bed748AED 1,520,8882,03312 Oct 2023Off-plan
A14112-bed1,080AED 2,672,8892,47512 Oct 2023Off-plan
A12041-bed748AED 1,593,8882,13112 Oct 2023Off-plan
A13021-bed782AED 1,604,8882,05112 Oct 2023Off-plan
A13011-bed725AED 1,492,8882,06012 Oct 2023Off-plan
A8171-bed744AED 1,511,8882,03212 Oct 2023Off-plan
A13111-bed733AED 1,772,8882,41812 Oct 2023Off-plan
A13161-bed748AED 1,534,8882,05212 Oct 2023Off-plan
A5152-bed1,154AED 2,168,8881,87912 Oct 2023Off-plan
A12111-bed733AED 1,769,8882,41412 Oct 2023Off-plan
A13091-bed743AED 1,792,8882,41412 Oct 2023Off-plan
A13152-bed1,154AED 2,201,8881,90812 Oct 2023Off-plan
A16161-bed744AED 1,534,8882,06312 Oct 2023Off-plan
A13101-bed745AED 1,798,8882,41412 Oct 2023Off-plan
A7101-bed745AED 1,770,8882,37710 Oct 2023Off-plan
A13041-bed748AED 1,596,8882,1359 Oct 2023Off-plan
A16083-bed1,581AED 3,931,8882,4879 Oct 2023Off-plan
A9132-bed1,082AED 2,684,7692,4819 Oct 2023Off-plan
A13031-bed748AED 1,595,8882,1339 Oct 2023Off-plan
A13051-bed744AED 1,586,8882,1339 Oct 2023Off-plan
A4083-bed1,581AED 3,535,8882,2369 Oct 2023Off-plan
A13061-bed748AED 1,596,8882,1359 Oct 2023Off-plan
A6091-bed743AED 1,754,8882,3629 Oct 2023Off-plan
A16122-bed1,082AED 2,748,8882,5409 Oct 2023Off-plan
A3143-bed1,555AED 3,369,8882,1679 Oct 2023Off-plan
A7143-bed1,555AED 3,596,8882,3139 Oct 2023Off-plan
A9122-bed1,080AED 2,673,8882,4759 Oct 2023Off-plan
A3083-bed1,581AED 3,451,8882,1836 Oct 2023Off-plan
A8181-bed747AED 1,518,8882,0336 Oct 2023Off-plan
A9051-bed744AED 1,574,8882,1176 Oct 2023Off-plan
A12132-bed1,082AED 2,727,8882,5216 Oct 2023Off-plan
A17072-bed1,176AED 2,876,1902,4456 Oct 2023Off-plan
A11031-bed748AED 1,589,8882,1256 Oct 2023Off-plan
A14133-bed1,555AED 3,696,8882,3776 Oct 2023Off-plan
A17083-bed1,581AED 3,938,8882,4916 Oct 2023Off-plan
A19083-bed1,581AED 3,953,8882,5016 Oct 2023Off-plan
A16142-bed1,154AED 2,214,8881,9196 Oct 2023Off-plan
A9161-bed748AED 1,523,8882,0376 Oct 2023Off-plan
A12143-bed1,555AED 3,682,8882,3686 Oct 2023Off-plan
A6072-bed1,176AED 2,713,8882,3075 Oct 2023Off-plan
A11072-bed1,176AED 2,901,8882,4674 Oct 2023Off-plan
A7083-bed1,581AED 3,787,8882,3964 Oct 2023Off-plan
A12072-bed1,176AED 2,906,8882,4714 Oct 2023Off-plan
A11143-bed1,555AED 3,675,8882,3634 Oct 2023Off-plan
A8122-bed1,080AED 2,668,8882,4704 Oct 2023Off-plan
A12051-bed744AED 1,583,8882,1294 Oct 2023Off-plan
A10083-bed1,581AED 3,887,8882,4594 Oct 2023Off-plan
A8083-bed1,581AED 3,872,8882,4494 Oct 2023Off-plan
A10143-bed1,555AED 3,668,8882,3594 Oct 2023Off-plan
A6132-bed1,082AED 2,621,8882,4234 Oct 2023Off-plan
A10072-bed1,176AED 2,895,8882,4624 Oct 2023Off-plan
A19072-bed1,176AED 2,945,8882,5044 Oct 2023Off-plan
A10132-bed1,082AED 2,716,8882,5114 Oct 2023Off-plan
A11083-bed1,581AED 3,894,8882,4634 Oct 2023Off-plan
A4171-bed744AED 1,499,8882,0164 Oct 2023Off-plan
A8051-bed744AED 1,571,8882,1134 Oct 2023Off-plan
A14031-bed748AED 1,598,8882,1374 Oct 2023Off-plan
A12122-bed1,080AED 2,689,8882,4904 Oct 2023Off-plan
A10122-bed1,080AED 2,678,8882,4804 Oct 2023Off-plan
A11132-bed1,082AED 2,695,6592,4914 Oct 2023Off-plan
A11122-bed1,080AED 2,683,8882,4844 Oct 2023Off-plan
A9072-bed1,176AED 2,890,8882,4574 Oct 2023Off-plan
A8072-bed1,176AED 2,884,8882,4524 Oct 2023Off-plan
A5132-bed1,082AED 2,579,8882,3844 Oct 2023Off-plan
A11152-bed1,154AED 2,193,8881,9014 Oct 2023Off-plan
A5143-bed1,555AED 3,482,8882,2394 Oct 2023Off-plan
A16112-bed1,080AED 2,709,8882,5093 Oct 2023Off-plan
A16102-bed1,068AED 2,531,8882,3703 Oct 2023Off-plan
A6041-bed748AED 1,574,8882,1053 Oct 2023Off-plan
A16171-bed747AED 1,541,8882,0643 Oct 2023Off-plan
A4031-bed748AED 1,568,8882,0973 Oct 2023Off-plan
A8132-bed1,082AED 2,706,8882,5013 Oct 2023Off-plan
A12152-bed1,154AED 2,197,8881,9053 Oct 2023Off-plan
A2051-bed744AED 1,553,8882,0893 Oct 2023Off-plan
A3061-bed748AED 1,565,8882,0933 Oct 2023Off-plan
A6031-bed748AED 1,574,8882,1053 Oct 2023Off-plan
A7031-bed748AED 1,577,8882,1093 Oct 2023Off-plan
A1041-bed748AED 1,559,8882,0853 Oct 2023Off-plan
A12171-bed744AED 1,522,8882,0472 Oct 2023Off-plan
A17102-bed1,068AED 2,535,8882,3742 Oct 2023Off-plan
A1092-bed1,216AED 2,474,8882,0362 Oct 2023Off-plan
A12091-bed743AED 1,789,8882,4102 Oct 2023Off-plan
A2122-bed1,080AED 2,451,8882,2692 Oct 2023Off-plan
A2072-bed1,176AED 2,373,8882,0182 Oct 2023Off-plan
A1082-bed1,196AED 2,447,1692,0472 Oct 2023Off-plan
A4101-bed745AED 1,740,8882,3372 Oct 2023Off-plan
A9021-bed782AED 1,592,8882,0362 Oct 2023Off-plan
A2132-bed1,082AED 2,453,8882,2672 Oct 2023Off-plan
A14161-bed744AED 1,528,8882,0552 Oct 2023Off-plan
A4091-bed743AED 1,734,8882,3362 Oct 2023Off-plan
A5122-bed1,080AED 2,559,8882,3692 Oct 2023Off-plan
A3181-bed747AED 1,503,8882,0132 Oct 2023Off-plan
A6011-bed725AED 1,472,8882,0322 Oct 2023Off-plan
A9011-bed725AED 1,480,8882,0432 Oct 2023Off-plan
A16092-bed1,076AED 2,545,8882,3652 Oct 2023Off-plan
A9041-bed748AED 1,584,8882,1192 Oct 2023Off-plan
A8091-bed743AED 1,775,8882,3912 Oct 2023Off-plan
A4072-bed1,176AED 2,542,8882,1622 Oct 2023Off-plan
A14011-bed725AED 1,495,8882,0642 Oct 2023Off-plan
A5111-bed733AED 1,725,8882,3542 Oct 2023Off-plan
A8111-bed733AED 1,755,8882,3952 Oct 2023Off-plan
A16021-bed782AED 1,613,8882,0632 Oct 2023Off-plan
A3122-bed1,080AED 2,487,8882,3032 Oct 2023Off-plan
A12061-bed748AED 1,577,9492,1092 Oct 2023Off-plan
A2171-bed744AED 1,493,8882,0082 Oct 2023Off-plan
A4132-bed1,082AED 2,536,8882,3442 Oct 2023Off-plan
A7111-bed733AED 1,745,8882,3812 Oct 2023Off-plan
A5181-bed747AED 1,509,8882,0212 Oct 2023Off-plan
A3072-bed1,176AED 2,458,8882,0902 Oct 2023Off-plan
A8011-bed725AED 1,477,8882,0392 Oct 2023Off-plan
A16061-bed748AED 1,605,8882,14728 Sep 2023Off-plan
A6161-bed748AED 1,514,8882,02528 Sep 2023Off-plan
A2152-bed1,154AED 2,155,8881,86828 Sep 2023Off-plan
A6061-bed748AED 1,574,8882,10528 Sep 2023Off-plan
A2111-bed733AED 1,695,8882,31328 Sep 2023Off-plan
A8031-bed748AED 1,580,8882,11328 Sep 2023Off-plan
A11111-bed733AED 1,766,8882,41028 Sep 2023Off-plan
A1112-bed1,154AED 2,151,8881,86528 Sep 2023Off-plan
A9101-bed745AED 1,784,8882,39628 Sep 2023Off-plan
A11161-bed748AED 1,528,8882,04428 Sep 2023Off-plan
A2091-bed743AED 1,713,8882,30728 Sep 2023Off-plan
A14021-bed782AED 1,591,8092,03428 Sep 2023Off-plan
A12021-bed782AED 1,601,8882,04728 Sep 2023Off-plan
AG031-bed900AED 1,617,8881,79828 Sep 2023Off-plan
A4152-bed1,154AED 2,163,8881,87528 Sep 2023Off-plan
A5171-bed744AED 1,502,8882,02028 Sep 2023Off-plan
A9091-bed743AED 1,743,3102,34728 Sep 2023Off-plan
A10091-bed743AED 1,782,8882,40028 Sep 2023Off-plan
A8152-bed1,154AED 2,180,8881,89028 Sep 2023Off-plan
A9111-bed733AED 1,759,8882,40128 Sep 2023Off-plan
A7152-bed1,154AED 2,176,8881,88628 Sep 2023Off-plan
A10061-bed748AED 1,587,8882,12328 Sep 2023Off-plan
A6152-bed1,154AED 2,172,8881,88328 Sep 2023Off-plan
A3041-bed748AED 1,565,8882,09328 Sep 2023Off-plan
A11101-bed745AED 1,791,8882,40528 Sep 2023Off-plan
A2101-bed745AED 1,719,8882,30828 Sep 2023Off-plan
AP112-bed1,149AED 2,136,8881,86028 Sep 2023Off-plan
A10111-bed733AED 1,762,8882,40528 Sep 2023Off-plan
A14061-bed748AED 1,599,8882,13928 Sep 2023Off-plan
A14171-bed747AED 1,535,8882,05628 Sep 2023Off-plan
A16041-bed748AED 1,605,8882,14728 Sep 2023Off-plan
A8101-bed745AED 1,781,8882,39228 Sep 2023Off-plan
A7091-bed743AED 1,765,8882,37728 Sep 2023Off-plan
A10152-bed1,154AED 2,188,8881,89728 Sep 2023Off-plan
A12101-bed745AED 1,795,8882,41028 Sep 2023Off-plan
A6111-bed733AED 1,735,8882,36828 Sep 2023Off-plan
A6101-bed745AED 1,760,8882,36328 Sep 2023Off-plan
A11041-bed748AED 1,590,8882,12728 Sep 2023Off-plan
A11171-bed744AED 1,519,8882,04328 Sep 2023Off-plan
A5051-bed744AED 1,562,8882,10128 Sep 2023Off-plan
A5031-bed748AED 1,571,8882,10128 Sep 2023Off-plan
A19031-bed748AED 1,613,8882,15728 Sep 2023Off-plan
AG051-bed903AED 1,619,8881,79528 Sep 2023Off-plan
A5101-bed745AED 1,750,8882,35028 Sep 2023Off-plan
A19061-bed748AED 1,614,8882,15928 Sep 2023Off-plan
A5091-bed743AED 1,744,8882,34928 Sep 2023Off-plan
A12031-bed748AED 1,592,8882,12928 Sep 2023Off-plan
A12161-bed748AED 1,531,8882,04828 Sep 2023Off-plan
A4021-bed782AED 1,577,8882,01727 Sep 2023Off-plan
A11181-bed747AED 1,526,8882,04426 Sep 2023Off-plan
A7061-bed748AED 1,577,8882,10926 Sep 2023Off-plan
A2031-bed748AED 1,562,8882,08926 Sep 2023Off-plan
A2061-bed748AED 1,562,8882,08926 Sep 2023Off-plan
A7171-bed744AED 1,508,8882,02826 Sep 2023Off-plan
A10051-bed744AED 1,577,8882,12126 Sep 2023Off-plan
A9031-bed748AED 1,583,8882,11726 Sep 2023Off-plan
A16051-bed744AED 1,595,8882,14526 Sep 2023Off-plan
A10161-bed748AED 1,526,8882,04126 Sep 2023Off-plan
A8041-bed748AED 1,580,8882,11326 Sep 2023Off-plan
A7021-bed782AED 1,586,8882,02826 Sep 2023Off-plan
A16151-bed748AED 1,543,8882,06426 Sep 2023Off-plan
A11051-bed744AED 1,580,8882,12526 Sep 2023Off-plan
A4061-bed748AED 1,568,8882,09726 Sep 2023Off-plan
A14041-bed748AED 1,599,8882,13926 Sep 2023Off-plan
A3171-bed744AED 1,496,8882,01226 Sep 2023Off-plan
A7041-bed748AED 1,577,8882,10926 Sep 2023Off-plan
A11061-bed748AED 1,574,9792,10526 Sep 2023Off-plan
A2181-bed747AED 1,500,8882,00926 Sep 2023Off-plan
A2041-bed748AED 1,562,8882,08926 Sep 2023Off-plan
A11021-bed782AED 1,598,8882,04326 Sep 2023Off-plan
A6051-bed744AED 1,565,8882,10526 Sep 2023Off-plan
A2161-bed748AED 1,502,8882,00926 Sep 2023Off-plan
A17011-bed724AED 1,500,8882,07426 Sep 2023Off-plan
A11011-bed725AED 1,486,8882,05225 Sep 2023Off-plan
A1131-bed744AED 1,490,8882,00425 Sep 2023Off-plan
A7181-bed747AED 1,515,8882,02925 Sep 2023Off-plan
A9171-bed744AED 1,514,8882,03625 Sep 2023Off-plan
A5161-bed748AED 1,511,8882,02125 Sep 2023Off-plan
A7161-bed748AED 1,517,8882,02925 Sep 2023Off-plan
A3161-bed748AED 1,505,8882,01325 Sep 2023Off-plan
A3011-bed725AED 1,463,8882,02025 Sep 2023Off-plan
A10011-bed725AED 1,469,0492,02725 Sep 2023Off-plan
A5011-bed725AED 1,469,8882,02819 Sep 2023Off-plan
A10021-bed782AED 1,579,9292,01919 Sep 2023Off-plan
A5021-bed782AED 1,580,8882,02019 Sep 2023Off-plan
A6171-bed744AED 1,505,8882,02419 Sep 2023Off-plan
A3101-bed745AED 1,729,8882,32219 Sep 2023Off-plan
A14072-bed1,176AED 2,917,8882,48019 Sep 2023Off-plan
A3091-bed743AED 1,724,8882,32219 Sep 2023Off-plan
A11091-bed743AED 1,785,8882,40419 Sep 2023Off-plan
A14051-bed744AED 1,589,8882,13719 Sep 2023Off-plan
A10181-bed747AED 1,523,8882,04019 Sep 2023Off-plan
A5041-bed748AED 1,571,8882,10119 Sep 2023Off-plan
A3051-bed744AED 1,556,8882,09319 Sep 2023Off-plan
AP072-bed1,171AED 2,231,8881,90619 Sep 2023Off-plan
A16011-bed725AED 1,485,8792,05019 Sep 2023Off-plan
A12011-bed725AED 1,489,8882,05618 Sep 2023Off-plan
A4161-bed748AED 1,508,8882,01718 Sep 2023Off-plan
A7051-bed744AED 2,670,8883,59018 Sep 2023Off-plan
A3152-bed1,154AED 2,159,8881,87218 Sep 2023Off-plan

Sellers ask 2% less than buyers paid

11 homes are for sale in Greenside Residence Tower A. The median advert asks 2% less per sq ft than the median off-plan sale of the same type in the last 12 months. 3 of 5 adverts ask the sold level or less. The median advert has been listed for 3 days; the oldest for 7 days.

TypeFor saleMedian askingAsking per sq ftSold per sq ft (sales)Asking over soldMedian time listed
1-bed5AED 1,700,0002,2732,317 (14)-2%3 days
2-bed4AED 2,825,0002,467too few sales–2 days
3-bed2AED 4,550,0002,902too few sales–4 days

How long the adverts have been listed

30 days or less11
31 to 90 days0
91 to 180 days0
More than 180 days0

Each home for sale, closest to sold prices first

TypeSq ftAskingPer sq ftAgainst soldDays listed
1-bed744AED 1,690,0002,272-2%6
1-bed748AED 1,699,9992,273-2%2
1-bed748AED 1,700,0002,273-2%3
1-bed748AED 1,750,0002,340+1%5
1-bed748AED 1,799,9992,406+4%2
2-bed1,154AED 2,500,0002,166–6
2-bed1,154AED 2,750,0002,383–2
2-bed1,176AED 3,000,0002,551–3
2-bed1,068AED 2,900,0002,715–0
3-bed1,581AED 4,500,0002,846–1
3-bed1,555AED 4,600,0002,958–7

Adverts: one reading on 7 Oct 2026. Sold prices: off-plan sales in this tower in the last 12 months, 5 or more of the type. An advert has no unit number, so we compare the price per sq ft with the type, not with the same unit. An asking price is not a sale price. Days listed is from the date on the advert: an agent can place a home again as a new advert, so the real time for sale can be longer. We cannot show price cuts over time or the time to sell yet: these need more than one reading.

Mortgage: what Greenside Residence Tower A costs a month

The tower is off-plan. A bank can lend at most 50% of the price of an off-plan home, and most buyers use the loan for the payment at handover. The rate starts at 3.99%, the most common 3-year fixed rate in two bank comparison lists dated 5 October 2026. Fixed rates in those lists run from 3.75% to 4.69%. Three-month EIBOR, the base for variable rates, was 4.19% on 9 Oct 2026.

Monthly payment

Cash you need on day one

Buy against rent

Loan limits: Central Bank of the UAE mortgage rules (first home under AED 5 million: 80% for residents, 85% for UAE nationals; AED 5 million and above: 70% and 75%; second home or investment: 60% and 65%; off-plan: 50%; 25 years at most; all your debt payments at most 50% of your income). Banks set their own limit for buyers who do not live in the UAE. Assumptions, the same in every BUY DUBAI calculator: rate 3.99% a year, the most common 3-year fixed rate in two bank comparison lists dated 5 October 2026; repayment loan over 25 years; Land Department fee 4% of the price plus AED 580; trustee office AED 4,200 (AED 2,100 under AED 500,000); agent 2% plus 5% VAT; with a loan: mortgage registration 0.25% of the loan plus AED 290, bank fee 1% of the loan plus VAT (it differs by bank), valuation AED 3,150. Life cover, insurance and service charges are not included. This is an illustration, not an offer of a loan. Rates read on 9 Oct 2026.

The official record: 348 registered sales since 2023

Dubai Land Department register for "Greenside Residence - Tower A", 18 Sep 2023 to 12 Feb 2026: 348 apartment sales, plus 6 gifts. This source has every year and every unit type, but no unit numbers.

YearApartments: salesAED per sq ft
202632,029
2025262,091
2024102,094
20233092,123

Median AED per sq ft is shown for 3 or more sales in a year. 348 of these sales were off-plan and 0 were of completed units. What our unit list above does not have: sales before 2020; mortgages and gifts. For homes from 2020 to 12 Feb 2026 the register has 348 sales and our unit list has 353.

Get a message when something changes in Greenside Residence Tower A
Sales, price cuts, new adverts and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from Greenside Residence Tower A, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
NorthGreenside Residence Tower B, a tower 0 m away · Greenside Residence Tower C, a tower 0 m away · Sheikh Zayed Road 7.8 km · Burj Khalifa 8.7 km · Jumeirah beach and the sea 9.6 km · DIFC 10.4 km
North-eastGolfville, a tower 115 m away · Golfville Block A, a tower 123 m away · Golfville Block B, a tower 123 m away · Meydan racecourse 5.7 km · Dubai Design District 8.4 km · Dubai Creek and Ras Al Khor 10.9 km
WestBurj Al Arab and the sea 7.7 km · Dubai Marina skyline 12.8 km

No resident reviews: the tower is not built

Nobody lives in Greenside Residence Tower A yet, so there is nothing a resident can tell you. Reviews you see elsewhere under this name are about the sales office, the developer or another building. What we can show is below: what the developer and the documents say about the project. We add resident reviews after handover.

The project: what the developer and the documents say

The tower is not complete, so these are plans and claims, not facts you can check on site. Each one names its source.

Where sources disagree

No conflict found between sources.

Around Greenside Residence Tower A

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
Greenside Residence Tower A (this tower)–2,358 (18)
Greenside Residence Tower B0 m– (4)
Greenside Residence Tower C0 m– (0)
Golfville Block A123 m2,355 (23)
Golfville Block B123 m– (3)
399 Hills Park A186 m– (0)
Ellington House 1202 m2,789 (35)
399 Hills Park B212 m2,096 (35)
Golf Grand213 m2,197 (38)

Drive times with no traffic

ToTimeDistance
Dubai Mall15 min12.6 km
DIFC Gate15 min13.3 km
DXB Terminal 335 min26.8 km
Dubai Marina Mall22 min17.6 km
Mall of the Emirates13 min9.5 km
Kite Beach14 min10.4 km
DWC airport43 min38.4 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 18 Sep 2023 to 23 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Developer material (the developer's own project page and brochure; marketing text, not residents)., Resident and public material found on the open web (one passage per block; source and date under each)., live adverts: community guide), read by an AI model on 27 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: a Google Maps place, resident reviews, guides, a floor plan document, unit positions on a floor, the side and view of each unit, building facts, the developer, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 27 Oct 2026 first build of this page. No correction yet.

Other towers in Greenside Residence

Greenside Residence Tower A is in Greenside Residence, Dubai Hills Estate. Sold prices and sales for the other towers with a page:

DaliaAIAsk DaliaAI analyst

Rental data (signed rents, renewals, asking against signed): RENT DUBAI, our sister site for tenants, from Dubai Land Department Ejari leases.