Azizi Venice 15 Building BOff-plan, due 2027AED 1,717 per sq ft no change in a year off-plan, 674 sales
Sales alert
Home › Dubai South (Dubai World Central) › Residential towers › Azizi Venice › Azizi Venice 15 Building B
Aerial view of towers around the lagoon and Opera House
Aerial view of towers around the lagoon and Opera House. Artist's impression · Azizi Developments
Off-plan luxury residential tower by Azizi Developments, handover due in 2027, with 731 off-plan sales

Azizi Venice 15 Building B, Dubai South (Dubai World Central) · by Azizi Developments

An off-plan studio in Azizi Venice 15 Building B sells for about AED 681,000

Median of 526 off-plan sales in the 12 months to 13 Oct 2026. Last sale in the tower: 13 Oct 2026. 1 sale in this period that we judge not to be market sales are left out (see the note under the table).

The project
It combines apartments and gated beachfront mansions, linked by a swimmable lagoon and a kilometre-long retail boulevard. The apartments are studios to three bedrooms with floor-to-ceiling windows and rooftop infinity pools. An Opera House sits on the water. Sources: azizidevelopments.com, brochure (PDF)
The market says
674 off-plan sales in 12 months at AED 1,717 per sq ft (no change in a year); a higher price than 87% of Dubai South (Dubai World Central) towers; 394 sales in the last 90 days; 18 homes for sale now.
James Paul Booth
The agent's view
“Azizi Venice 15 Building B is off-plan, due in 2027, so no owner has sold a completed home here yet. Buyers took 394 homes in the last 90 days at about AED 1,717 per sq ft. Demand is there. Your return depends on the handover date and on the price of the completed towers next door on that day.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page
Asking now, studio
AED 665,000 (14 listings)
Shops and food
0 places to eat within 300 m
730 units with a sale on record since 2025.
27sales in the last 30 days: 0 resale, 27 off-plan; 1 more not counted as market sales
18for sale now, listed a median of 27 days
Off-plannot built yet: every sale so far is off-plan
AIWritten by Dalia, an AI data analyst. Data to 13 Oct 2026. Built 15 Oct 2026.

Pictures of Azizi Venice 15 Building B

Aerial view of towers around the lagoon and Opera House
Aerial view of towers around the lagoon and Opera House
Artist's impression · Azizi Developments
Aerial view of lagoon, sailboats and beachfront mansions
Aerial view of lagoon, sailboats and beachfront mansions
Artist's impression · Azizi Developments
Terraced apartment tower with green roof beside the lagoon
Terraced apartment tower with green roof beside the lagoon
Artist's impression · Azizi Developments

19 pictures of this building: developer renders. Each shows its source; select one to open it there. A drawing is made by BUY DUBAI from real pictures and is marked as a drawing.

From the developer: Azizi Developments

What Azizi Developments publishes about Azizi Venice 15 Building B. Pictures are the developer's artist's impressions, not photos of the building. Each fact shows where it comes from; a fact read from the developer's text is checked word for word.

Aerial view of towers around the lagoon and Opera House
Aerial view of towers around the lagoon and Opera House
Artist's impression · Azizi Developments · source, page 7
Aerial view of lagoon, sailboats and beachfront mansions
Aerial view of lagoon, sailboats and beachfront mansions
Artist's impression · Azizi Developments · source, page 9
Terraced apartment tower with green roof beside the lagoon
Terraced apartment tower with green roof beside the lagoon
Artist's impression · Azizi Developments · source, page 13
Apartment buildings along the lagoon with kayakers
Apartment buildings along the lagoon with kayakers
Artist's impression · Azizi Developments · source, page 17
Curved-balcony apartment tower at sunset beside the lagoon
Curved-balcony apartment tower at sunset beside the lagoon
Artist's impression · Azizi Developments · source, page 19
Towers and waterfront restaurant deck in the evening
Towers and waterfront restaurant deck in the evening
Artist's impression · Azizi Developments · source, page 21
Row of modern beachfront mansions reflected in the lagoon
Row of modern beachfront mansions reflected in the lagoon
Artist's impression · Azizi Developments · source, page 35
Opera House on the water at dusk with boulevard
Opera House on the water at dusk with boulevard
Artist's impression · Azizi Developments · source, page 15
Unit types
Studio, 1 bedroom, 2 bedrooms, 3 bedrooms azizidevelopments.com
Views
Crystal lagoon and waterfront views brochure
Amenities
Poolside area, State-of-the-art gym, Multipurpose hall, Cinema room, Kids' play area, Clubhouse, Elevated lagoon, Outdoor jacuzzi and spa zone, Indoor gardens, Elevated entertainment, Rooftop infinity pool, Opera House azizidevelopments.com
Location
Dubai South (Dubai World Central), Dubai, along Emirates Road brochure

Video

Video: Azizi Developments on YouTube.

Documents

Checked, not found: floor plans. We searched the developer site and the web on 13 Oct 2026. Ask Azizi Developments for the latest brochure and floor plans.

Azizi Venice 15 Building B on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Construction progress: not found

We found no public progress record for this tower. Ask the developer for the latest inspection report from the Land Department.

Payment plan: not found

We checked the pages we hold for this tower and found no payment plan that passed our checks. We do not guess one. Ask the developer for the current plan.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, in most cases by the developer. The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 13 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A median needs 5 sales or 3 listings.

TypeOff-plan: soldOff-plan: per sq ftMedian asking
StudioAED 680,500 (526)1,775AED 665,000 (14)
1-bedAED 1,171,095 (96)1,711– (1)
2-bedAED 1,715,920 (49)1,498– (2)
3-bedunder 5 (3)–– (1)

Rents are asking rents, not registered contracts. Yield = asking rent divided by the median resale price, before service charge.

Sales we leave out of every median, count and chart (1 of 731 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (0); a sale at exactly the same price as that unit's sale before (1); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Off-plan price per sq ft did not change in a year

Median AED 1,717 per sq ft in the last 12 months (674 off-plan sales) against AED 1,721 in the 12 months before (56 off-plan sales).

2025-Q2: AED 1,727 per sq ft, 3 sales1,72725 Q22025-Q3: AED 1,682 per sq ft, 46 sales1,68225 Q32025-Q4: AED 1,709 per sq ft, 50 sales1,70925 Q42026-Q1: AED 1,805 per sq ft, 34 sales1,80526 Q12026-Q2: AED 1,678 per sq ft, 160 sales1,67826 Q22026-Q3: AED 1,730 per sq ft, 414 sales1,73026 Q32026-Q4: AED 1,828 per sq ft, 23 sales1,82826 Q43 sales346 sales4650 sales5034 sales34160 sales160414 sales41423 sales23Median AED per sq ftNumber of sales

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most. Grey bars have fewer than 3 sales. Off-plan sales are 100% of all sales in this tower, so the early quarters show launch prices.

Every sale since 2025: 731 sales of 730 units

Newest first. Each sale is marked Resale or Off-plan. The last column shows the change from the same unit's sale before.

UnitTypeSq ftPriceAED per sq ftDateMarketAgainst the sale before
253Studio382AED 707,0001,85313 Oct 2026Off-plan
1346Studio381AED 730,0001,91912 Oct 2026Off-plan, sold againsame price as in 2026: transfer
1325Studio381AED 643,0001,6879 Oct 2026Off-plan
471Studio382AED 698,0001,8288 Oct 2026Off-plan
604Studio382AED 708,0001,8528 Oct 2026Off-plan
245Studio381AED 700,0001,8398 Oct 2026Off-plan
553Studio382AED 711,0001,8638 Oct 2026Off-plan
825Studio381AED 637,0001,6728 Oct 2026Off-plan
1171Studio382AED 706,0001,8498 Oct 2026Off-plan
1045Studio381AED 709,0001,8638 Oct 2026Off-plan
1025Studio381AED 639,0001,6778 Oct 2026Off-plan
1172Studio383AED 708,0001,8508 Oct 2026Off-plan
653Studio382AED 712,0001,8668 Oct 2026Off-plan
371Studio382AED 697,0001,8258 Oct 2026Off-plan
311Studio381AED 618,7501,6268 Oct 2026Off-plan
1053Studio382AED 695,4901,8238 Oct 2026Off-plan
201Studio389AED 691,0001,7788 Oct 2026Off-plan
712Studio381AED 623,0001,6378 Oct 2026Off-plan
360Studio383AED 703,0001,8377 Oct 2026Off-plan
1560Studio383AED 730,0001,9087 Oct 2026Off-plan
1641Studio381AED 675,0001,7747 Oct 2026Off-plan
7581-bed663AED 1,146,0001,7306 Oct 2026Off-plan
554Studio381AED 727,0001,9066 Oct 2026Off-plan
13092-bed1,159AED 1,710,0001,4755 Oct 2026Off-plan
143Studio381AED 698,0001,83428 Sep 2026Off-plan
6271-bed650AED 994,0001,53024 Sep 2026Off-plan
1012Studio381AED 627,0001,64722 Sep 2026Off-plan
15092-bed1,159AED 1,540,8001,32922 Sep 2026Off-plan
711Studio381AED 623,0001,63711 Sep 2026Off-plan
1015Studio381AED 627,0001,6474 Sep 2026Off-plan
8092-bed1,159AED 1,704,0001,4703 Sep 2026Off-plan
142Studio381AED 716,0001,88131 Aug 2026Off-plan
357Studio386AED 704,0001,82331 Aug 2026Off-plan
247Studio381AED 717,0001,88431 Aug 2026Off-plan
7092-bed1,159AED 1,676,0001,44631 Aug 2026Off-plan
910Studio389AED 651,0001,67327 Aug 2026Off-plan
1202Studio382AED 714,0001,87024 Aug 2026Off-plan
1553Studio382AED 723,0001,89521 Aug 2026Off-plan
1104Studio382AED 714,0001,86821 Aug 2026Off-plan
1576Studio381AED 703,0001,84721 Aug 2026Off-plan
876Studio381AED 695,0001,82621 Aug 2026Off-plan
1412Studio381AED 618,8601,62621 Aug 2026Off-plan
1711Studio381AED 641,0001,68421 Aug 2026Off-plan
1653Studio382AED 724,0001,89721 Aug 2026Off-plan
1019Studio384AED 636,0001,65821 Aug 2026Off-plan
1175Studio382AED 701,0001,83621 Aug 2026Off-plan
314Studio381AED 618,0001,62419 Aug 2026Off-plan
1525Studio381AED 645,0001,69319 Aug 2026Off-plan
702Studio382AED 726,0001,90119 Aug 2026Off-plan
917Studio381AED 625,0001,64319 Aug 2026Off-plan
1143Studio381AED 727,0001,91119 Aug 2026Off-plan
1301Studio389AED 733,0001,88619 Aug 2026Off-plan
4031-bed733AED 1,292,0001,76319 Aug 2026Off-plan
701Studio389AED 726,0001,86819 Aug 2026Off-plan
444Studio381AED 712,8001,87319 Aug 2026Off-plan
541Studio381AED 651,0001,71117 Aug 2026Off-plan
1791-bed661AED 1,119,0001,69317 Aug 2026Off-plan
646Studio381AED 704,0001,85017 Aug 2026Off-plan
1677Studio381AED 704,0001,85017 Aug 2026Off-plan
643Studio381AED 704,0001,85017 Aug 2026Off-plan
14673-bed1,645AED 2,581,0001,56917 Aug 2026Off-plan
1441Studio381AED 661,0001,73717 Aug 2026Off-plan
160Studio383AED 714,0001,86417 Aug 2026Off-plan
841Studio381AED 654,0001,71917 Aug 2026Off-plan
112Studio381AED 616,0001,61817 Aug 2026Off-plan
510Studio389AED 635,0001,63217 Aug 2026Off-plan
1353Studio382AED 720,0001,88717 Aug 2026Off-plan
761Studio382AED 707,0001,85117 Aug 2026Off-plan
833Studio381AED 629,0001,65314 Aug 2026Off-plan
804Studio382AED 710,0001,85814 Aug 2026Off-plan
17251-bed740AED 1,273,0001,72014 Aug 2026Off-plan
2271-bed650AED 990,0001,52414 Aug 2026Off-plan
1314Studio381AED 641,0001,68514 Aug 2026Off-plan
11681-bed876AED 1,522,0001,73814 Aug 2026Off-plan
11281-bed730AED 1,119,0001,53414 Aug 2026Off-plan
1118Studio381AED 639,0001,67914 Aug 2026Off-plan
6492-bed1,160AED 1,891,0001,63014 Aug 2026Off-plan
1013Studio381AED 626,0001,64514 Aug 2026Off-plan
1076Studio381AED 697,0001,83114 Aug 2026Off-plan
348Studio389AED 705,0001,81214 Aug 2026Off-plan
1018Studio381AED 637,0001,67414 Aug 2026Off-plan
778Studio382AED 697,0001,82414 Aug 2026Off-plan
11741-bed775AED 1,322,0001,70714 Aug 2026Off-plan
1311Studio381AED 641,0001,68414 Aug 2026Off-plan
1214Studio381AED 640,0001,68214 Aug 2026Off-plan
741Studio381AED 653,0001,71614 Aug 2026Off-plan
857Studio386AED 698,0001,80714 Aug 2026Off-plan
1640Studio381AED 675,0001,77314 Aug 2026Off-plan
577Studio381AED 691,0001,81614 Aug 2026Off-plan
1031-bed733AED 1,251,0001,70713 Aug 2026Off-plan
1648Studio389AED 732,0001,88213 Aug 2026Off-plan
1048Studio389AED 725,0001,86413 Aug 2026Off-plan
15681-bed876AED 1,501,0001,71413 Aug 2026Off-plan
1730Studio386AED 720,0001,86413 Aug 2026Off-plan
113Studio381AED 616,0001,61913 Aug 2026Off-plan
376Studio381AED 689,0001,81013 Aug 2026Off-plan
1277Studio381AED 699,0001,83713 Aug 2026Off-plan
105Studio381AED 688,0001,80413 Aug 2026Off-plan
13791-bed661AED 1,133,0001,71413 Aug 2026Off-plan
5092-bed1,159AED 1,703,0001,46913 Aug 2026Off-plan
210Studio389AED 642,0001,65013 Aug 2026Off-plan
418Studio381AED 630,0001,65513 Aug 2026Off-plan
305Studio381AED 703,0001,84313 Aug 2026Off-plan
576Studio381AED 671,2401,76413 Aug 2026Off-plan
1676Studio381AED 704,0001,85013 Aug 2026Off-plan
275Studio382AED 691,0001,80913 Aug 2026Off-plan
1071Studio382AED 705,0001,84613 Aug 2026Off-plan
1240Studio381AED 659,0001,73113 Aug 2026Off-plan
805Studio381AED 709,0001,85913 Aug 2026Off-plan
214Studio381AED 617,0001,62213 Aug 2026Off-plan
1017Studio381AED 626,0001,64513 Aug 2026Off-plan
934Studio381AED 641,0001,68413 Aug 2026Off-plan
333Studio381AED 623,0001,63713 Aug 2026Off-plan
316Studio381AED 625,0001,64213 Aug 2026Off-plan
476Studio381AED 690,0001,81313 Aug 2026Off-plan
205Studio381AED 701,0001,83813 Aug 2026Off-plan
223Studio382AED 624,0001,63513 Aug 2026Off-plan
346Studio381AED 689,0001,81113 Aug 2026Off-plan
10311-bed651AED 999,0001,53613 Aug 2026Off-plan
135Studio382AED 624,0001,63313 Aug 2026Off-plan
13681-bed876AED 1,498,0001,71113 Aug 2026Off-plan
717Studio381AED 623,0001,63713 Aug 2026Off-plan
5701-bed744AED 1,270,0001,70813 Aug 2026Off-plan
1160Studio383AED 713,0001,86313 Aug 2026Off-plan
402Studio382AED 693,0001,81513 Aug 2026Off-plan
176Studio381AED 687,0001,80513 Aug 2026Off-plan
1519Studio384AED 635,0001,65613 Aug 2026Off-plan
16311-bed651AED 1,023,0001,57213 Aug 2026Off-plan
119Studio384AED 618,0001,61113 Aug 2026Off-plan
512Studio381AED 621,0001,63213 Aug 2026Off-plan
177Studio381AED 687,0001,80613 Aug 2026Off-plan
17222-bed1,159AED 1,903,0001,64113 Aug 2026Off-plan
1041Studio381AED 657,0001,72713 Aug 2026Off-plan
1011Studio381AED 627,0001,64713 Aug 2026Off-plan
4311-bed651AED 992,0001,52513 Aug 2026Off-plan
1675Studio382AED 707,0001,85113 Aug 2026Off-plan
634Studio381AED 627,0001,64712 Aug 2026Off-plan
641Studio381AED 652,0001,71412 Aug 2026Off-plan
246Studio381AED 688,0001,80812 Aug 2026Off-plan
1147Studio381AED 699,0001,83712 Aug 2026Off-plan
1276Studio381AED 700,0001,83912 Aug 2026Off-plan
735Studio381AED 630,5001,65312 Aug 2026Off-plan
1023Studio382AED 645,0001,69012 Aug 2026Off-plan
10681-bed876AED 1,563,0001,78512 Aug 2026Off-plan
1318Studio381AED 641,0001,68412 Aug 2026Off-plan
561Studio382AED 704,0001,84312 Aug 2026Off-plan
5791-bed661AED 1,123,0001,69912 Aug 2026Off-plan
5591-bed734AED 1,255,0001,71112 Aug 2026Off-plan
118Studio381AED 616,0001,61812 Aug 2026Off-plan
1639Studio381AED 676,0001,77612 Aug 2026Off-plan
660Studio383AED 707,0001,84812 Aug 2026Off-plan
918Studio381AED 626,0001,64512 Aug 2026Off-plan
947Studio381AED 696,0001,82912 Aug 2026Off-plan
518Studio381AED 621,0001,63212 Aug 2026Off-plan
405Studio381AED 692,0001,81512 Aug 2026Off-plan
1213Studio381AED 635,0001,66912 Aug 2026Off-plan
633Studio381AED 627,0001,64812 Aug 2026Off-plan
972Studio383AED 717,0001,87412 Aug 2026Off-plan
1661Studio382AED 729,0001,90912 Aug 2026Off-plan
1347Studio381AED 730,0001,91812 Aug 2026Off-plan
1302Studio382AED 733,0001,91912 Aug 2026Off-plan
1111Studio381AED 628,0001,65012 Aug 2026Off-plan
912Studio381AED 626,0001,64512 Aug 2026Off-plan
6092-bed1,159AED 1,704,0001,47012 Aug 2026Off-plan
624Studio380AED 626,0001,64712 Aug 2026Off-plan
461Studio382AED 703,0001,84112 Aug 2026Off-plan
213Studio381AED 617,0001,62212 Aug 2026Off-plan
5741-bed775AED 1,338,0001,72712 Aug 2026Off-plan
616Studio381AED 633,0001,66312 Aug 2026Off-plan
654Studio381AED 711,0001,86411 Aug 2026Off-plan
11732-bed1,121AED 1,933,0001,72411 Aug 2026Off-plan
724Studio380AED 634,0001,66811 Aug 2026Off-plan
14271-bed650AED 1,021,0001,57211 Aug 2026Off-plan
1425Studio381AED 648,0001,70111 Aug 2026Off-plan
812Studio381AED 605,2801,59011 Aug 2026Off-plan
12501-bed866AED 1,462,7601,69011 Aug 2026Off-plan
1416Studio381AED 638,0001,67611 Aug 2026Off-plan
1101Studio389AED 731,0001,88111 Aug 2026Off-plan
725Studio381AED 636,0001,66911 Aug 2026Off-plan
254Studio381AED 724,0001,89811 Aug 2026Off-plan
6061-bed740AED 1,272,0001,71811 Aug 2026Off-plan
902Studio382AED 728,0001,90611 Aug 2026Off-plan
757Studio386AED 725,0001,87711 Aug 2026Off-plan
771Studio382AED 714,0001,87011 Aug 2026Off-plan
15632-bed1,150AED 1,782,0001,55011 Aug 2026Off-plan
234Studio381AED 629,0001,65311 Aug 2026Off-plan
523Studio382AED 639,0001,67511 Aug 2026Off-plan
911Studio381AED 626,0001,64511 Aug 2026Off-plan
178Studio382AED 720,0001,88411 Aug 2026Off-plan
1218Studio381AED 636,0001,67111 Aug 2026Off-plan
457Studio386AED 722,0001,86911 Aug 2026Off-plan
460Studio383AED 734,0001,91811 Aug 2026Off-plan
710Studio389AED 648,0001,66611 Aug 2026Off-plan
312Studio381AED 618,7501,62611 Aug 2026Off-plan
1419Studio384AED 640,0001,66911 Aug 2026Off-plan
147Studio381AED 699,0001,83711 Aug 2026Off-plan
1246Studio381AED 721,7101,89711 Aug 2026Off-plan
9031-bed733AED 1,272,0401,73511 Aug 2026Off-plan
415Studio381AED 627,0001,64711 Aug 2026Off-plan
754Studio381AED 713,0001,87011 Aug 2026Off-plan
310Studio389AED 643,0001,65311 Aug 2026Off-plan
578Studio382AED 724,0001,89511 Aug 2026Off-plan
840Studio381AED 655,0001,72111 Aug 2026Off-plan
2361-bed735AED 1,124,0001,53011 Aug 2026Off-plan
661Studio382AED 735,0001,92511 Aug 2026Off-plan
2732-bed1,121AED 1,884,5401,68111 Aug 2026Off-plan
676Studio381AED 693,0001,82111 Aug 2026Off-plan
12581-bed663AED 1,152,0001,73911 Aug 2026Off-plan
1604Studio382AED 720,0001,88411 Aug 2026Off-plan
2681-bed876AED 1,554,0001,77511 Aug 2026Off-plan
613Studio381AED 622,0001,63511 Aug 2026Off-plan
9701-bed744AED 1,334,0001,79411 Aug 2026Off-plan
3791-bed661AED 1,174,0001,77611 Aug 2026Off-plan
423Studio382AED 633,0001,65911 Aug 2026Off-plan
1205Studio381AED 713,0001,87010 Aug 2026Off-plan
161Studio382AED 699,0001,83110 Aug 2026Off-plan
117Studio381AED 616,7701,62110 Aug 2026Off-plan
8581-bed663AED 1,147,0001,73110 Aug 2026Off-plan
726Studio381AED 623,2801,63410 Aug 2026Off-plan
925Studio381AED 638,0001,67410 Aug 2026Off-plan
344Studio381AED 711,8101,87010 Aug 2026Off-plan
14681-bed876AED 1,568,0001,79110 Aug 2026Off-plan
1326Studio381AED 643,0001,68610 Aug 2026Off-plan
1619Studio384AED 642,0001,67410 Aug 2026Off-plan
2031-bed733AED 1,290,0001,76010 Aug 2026Off-plan
540Studio381AED 651,0001,71010 Aug 2026Off-plan
7271-bed650AED 998,9101,53810 Aug 2026Off-plan
1643Studio381AED 733,0001,92610 Aug 2026Off-plan
224Studio380AED 628,0001,65210 Aug 2026Off-plan
302Studio382AED 704,0001,84310 Aug 2026Off-plan
260Studio383AED 732,0001,91310 Aug 2026Off-plan
1024Studio380AED 637,0001,67610 Aug 2026Off-plan
101Studio389AED 719,0001,85010 Aug 2026Off-plan
442Studio381AED 720,0001,89210 Aug 2026Off-plan
2311-bed651AED 1,004,0001,54310 Aug 2026Off-plan
145Studio381AED 687,0001,80510 Aug 2026Off-plan
11092-bed1,159AED 1,708,0001,47310 Aug 2026Off-plan
532Studio382AED 635,0001,66410 Aug 2026Off-plan
7681-bed876AED 1,528,8001,74610 Aug 2026Off-plan
519Studio384AED 623,7001,62610 Aug 2026Off-plan
705Studio381AED 695,0001,82210 Aug 2026Off-plan
1112Studio381AED 635,0001,66810 Aug 2026Off-plan
733Studio381AED 635,0001,66910 Aug 2026Off-plan
1144Studio381AED 728,0001,91310 Aug 2026Off-plan
12692-bed1,160AED 2,009,0001,73210 Aug 2026Off-plan
1210Studio389AED 650,0001,67110 Aug 2026Off-plan
742Studio381AED 723,0001,90010 Aug 2026Off-plan
445Studio381AED 702,0001,84410 Aug 2026Off-plan
3092-bed1,159AED 1,699,0001,46610 Aug 2026Off-plan
1057Studio386AED 729,0001,88810 Aug 2026Off-plan
2581-bed663AED 1,159,0001,74910 Aug 2026Off-plan
1046Studio381AED 704,2201,85110 Aug 2026Off-plan
1513Studio381AED 639,0001,67910 Aug 2026Off-plan
1154Studio381AED 734,0001,92510 Aug 2026Off-plan
1334Studio381AED 622,7401,63610 Aug 2026Off-plan
1339Studio381AED 672,0001,76610 Aug 2026Off-plan
202Studio382AED 720,0001,88510 Aug 2026Off-plan
1539Studio381AED 684,0001,79710 Aug 2026Off-plan
904Studio382AED 729,0001,90710 Aug 2026Off-plan
1618Studio381AED 640,0001,68210 Aug 2026Off-plan
313Studio381AED 618,0001,62410 Aug 2026Off-plan
7732-bed1,121AED 1,715,9201,53010 Aug 2026Off-plan
556Studio382AED 700,0001,83210 Aug 2026Off-plan
1323Studio382AED 644,0001,68810 Aug 2026Off-plan
1319Studio384AED 639,0001,66610 Aug 2026Off-plan
753Studio382AED 722,7001,89410 Aug 2026Off-plan
13581-bed663AED 1,205,0001,81910 Aug 2026Off-plan
1224Studio380AED 639,0001,68110 Aug 2026Off-plan
443Studio381AED 711,8101,87110 Aug 2026Off-plan
810Studio389AED 632,1001,62510 Aug 2026Off-plan
1354Studio381AED 737,0001,93310 Aug 2026Off-plan
939Studio381AED 667,0001,75210 Aug 2026Off-plan
1033Studio381AED 638,0001,67710 Aug 2026Off-plan
639Studio381AED 653,0001,71610 Aug 2026Off-plan
1034Studio381AED 638,0001,67610 Aug 2026Off-plan
1005Studio381AED 728,0001,90910 Aug 2026Off-plan
243Studio381AED 717,0001,8847 Aug 2026Off-plan
10581-bed663AED 1,202,0001,8147 Aug 2026Off-plan
623Studio382AED 629,6401,6507 Aug 2026Off-plan
547Studio381AED 721,0001,8947 Aug 2026Off-plan
1510Studio389AED 658,0001,6917 Aug 2026Off-plan
1729Studio382AED 743,0001,9447 Aug 2026Off-plan
872Studio383AED 718,3401,8777 Aug 2026Off-plan
835Studio381AED 651,0001,7077 Aug 2026Off-plan
242Studio381AED 717,0001,8847 Aug 2026Off-plan
1225Studio381AED 641,0001,6827 Aug 2026Off-plan
1142Studio381AED 728,0001,9137 Aug 2026Off-plan
1119Studio384AED 637,0001,6617 Aug 2026Off-plan
1624Studio381AED 645,0001,6957 Aug 2026Off-plan
632Studio382AED 636,0001,6677 Aug 2026Off-plan
240Studio381AED 661,3201,7387 Aug 2026Off-plan
1217Studio381AED 635,0001,6697 Aug 2026Off-plan
1361Studio382AED 714,0001,8707 Aug 2026Off-plan
1591-bed733AED 1,250,0001,7057 Aug 2026Off-plan
1633Studio381AED 645,0001,6957 Aug 2026Off-plan
416Studio381AED 630,0001,6557 Aug 2026Off-plan
1625Studio381AED 645,0001,6957 Aug 2026Off-plan
1535Studio381AED 659,0001,7287 Aug 2026Off-plan
1475Studio382AED 669,7501,7547 Aug 2026Off-plan
146Studio381AED 698,0001,8347 Aug 2026Off-plan
1044Studio381AED 673,5501,7707 Aug 2026Off-plan
1435Studio381AED 658,0001,7257 Aug 2026Off-plan
1423Studio382AED 645,0001,6907 Aug 2026Off-plan
16492-bed1,160AED 1,893,6001,6337 Aug 2026Off-plan
1335Studio381AED 657,0001,7237 Aug 2026Off-plan
1715Studio382AED 644,0001,6857 Aug 2026Off-plan
501Studio389AED 724,0001,8637 Aug 2026Off-plan
1726Studio382AED 742,0001,9457 Aug 2026Off-plan
435Studio381AED 647,0001,6977 Aug 2026Off-plan
845Studio381AED 724,0001,9027 Aug 2026Off-plan
5271-bed650AED 1,010,0001,5557 Aug 2026Off-plan
1201Studio389AED 732,0001,8837 Aug 2026Off-plan
248Studio389AED 711,9801,8307 Aug 2026Off-plan
7372-bed1,156AED 1,587,5201,3746 Aug 2026Off-plan
425Studio381AED 606,7201,5926 Aug 2026Off-plan
8212-bed1,156AED 1,534,2501,3286 Aug 2026Off-plan
1271Studio382AED 722,2601,8916 Aug 2026Off-plan
16581-bed663AED 1,209,0001,8256 Aug 2026Off-plan
1654Studio381AED 740,0001,9406 Aug 2026Off-plan
846Studio381AED 724,0001,9036 Aug 2026Off-plan
9681-bed876AED 1,494,0001,7066 Aug 2026Off-plan
1340Studio381AED 681,0001,7896 Aug 2026Off-plan
1371Studio382AED 723,2401,8946 Aug 2026Off-plan
514Studio381AED 621,0001,6326 Aug 2026Off-plan
16372-bed1,156AED 1,632,6001,4136 Aug 2026Off-plan
626Studio381AED 609,6001,5986 Aug 2026Off-plan
472Studio383AED 721,7101,8866 Aug 2026Off-plan
446Studio381AED 711,8101,8716 Aug 2026Off-plan
1042Studio381AED 727,0001,9106 Aug 2026Off-plan
6651-bed736AED 1,301,0001,7676 Aug 2026Off-plan
601Studio389AED 708,0001,8226 Aug 2026Off-plan
412Studio381AED 627,0001,6476 Aug 2026Off-plan
1061Studio382AED 739,0001,9356 Aug 2026Off-plan
124Studio380AED 620,0001,6316 Aug 2026Off-plan
1635Studio381AED 647,0001,6976 Aug 2026Off-plan
1578Studio382AED 706,0001,8486 Aug 2026Off-plan
153Studio382AED 723,0001,8956 Aug 2026Off-plan
1656Studio382AED 741,0001,9396 Aug 2026Off-plan
1241Studio381AED 680,0001,7876 Aug 2026Off-plan
1439Studio381AED 668,3601,7566 Aug 2026Off-plan
945Studio381AED 703,2501,8486 Aug 2026Off-plan
335Studio381AED 646,0001,6946 Aug 2026Off-plan
8271-bed650AED 999,9001,5396 Aug 2026Off-plan
361Studio382AED 702,0001,8386 Aug 2026Off-plan
401Studio389AED 715,7701,8426 Aug 2026Off-plan
175Studio382AED 690,0001,8076 Aug 2026Off-plan
4681-bed876AED 1,488,0001,6996 Aug 2026Off-plan
256Studio382AED 696,9601,8246 Aug 2026Off-plan
3692-bed1,160AED 1,683,2001,4516 Aug 2026Off-plan
225Studio381AED 630,0001,6536 Aug 2026Off-plan
1577Studio381AED 703,0001,8486 Aug 2026Off-plan
946Studio381AED 725,0001,9056 Aug 2026Off-plan
1702Studio382AED 729,6301,9116 Aug 2026Off-plan
1245Studio381AED 729,0001,9156 Aug 2026Off-plan
1243Studio381AED 692,5501,8206 Aug 2026Off-plan
1244Studio381AED 729,0001,9156 Aug 2026Off-plan
433Studio381AED 631,0001,6586 Aug 2026Off-plan
848Studio389AED 741,0001,9056 Aug 2026Off-plan
4791-bed661AED 1,122,0001,6976 Aug 2026Off-plan
854Studio381AED 723,6901,8986 Aug 2026Off-plan
16732-bed1,121AED 1,744,2001,5566 Aug 2026Off-plan
977Studio381AED 725,0001,9056 Aug 2026Off-plan
1242Studio381AED 699,8401,8396 Aug 2026Off-plan
17092-bed1,159AED 1,696,8601,4646 Aug 2026Off-plan
942Studio381AED 725,0001,9056 Aug 2026Off-plan
960Studio383AED 731,6101,9126 Aug 2026Off-plan
1727Studio381AED 741,0001,9436 Aug 2026Off-plan
1444Studio381AED 716,3801,8826 Aug 2026Off-plan
5632-bed1,150AED 1,722,8751,4986 Aug 2026Off-plan
4732-bed1,121AED 1,597,7501,4256 Aug 2026Off-plan
447Studio381AED 690,0001,8135 Aug 2026Off-plan
1233Studio381AED 640,0001,6825 Aug 2026Off-plan
5311-bed651AED 986,8601,5174 Aug 2026Off-plan
1378Studio382AED 733,0001,9183 Aug 2026Off-plan
1461Studio382AED 715,0001,8723 Aug 2026Off-plan
411Studio381AED 630,0001,65530 Jul 2026Off-plan
1216Studio381AED 640,0001,68230 Jul 2026Off-plan
605Studio381AED 694,0001,82030 Jul 2026Off-plan
1211Studio381AED 640,0001,68229 Jul 2026Off-plan
1660Studio383AED 747,0001,95229 Jul 2026Off-plan
571Studio382AED 711,0001,86223 Jul 2026Off-plan
5501-bed866AED 1,543,0001,78323 Jul 2026Off-plan
1260Studio383AED 704,2201,84023 Jul 2026Off-plan
517Studio381AED 627,0001,64823 Jul 2026Off-plan
239Studio381AED 669,0001,75822 Jul 2026Off-plan
1105Studio381AED 700,0001,83622 Jul 2026Off-plan
15271-bed650AED 1,018,0001,56721 Jul 2026Off-plan
1512Studio381AED 632,6101,66221 Jul 2026Off-plan
948Studio389AED 724,0001,86117 Jul 2026Off-plan
1548Studio389AED 697,4301,79317 Jul 2026Off-plan
1720Studio381AED 719,3201,89017 Jul 2026Off-plan
17281-bed733AED 1,302,0001,77616 Jul 2026Off-plan
535Studio381AED 648,0001,69916 Jul 2026Off-plan
671Studio382AED 712,0001,86416 Jul 2026Off-plan
7301-bed730AED 1,098,0401,50415 Jul 2026Off-plan
15061-bed740AED 1,320,0001,78314 Jul 2026Off-plan
832Studio382AED 638,0001,67214 Jul 2026Off-plan
1040Studio381AED 668,0001,75514 Jul 2026Off-plan
1712Studio381AED 641,0001,68413 Jul 2026Off-plan
1404Studio382AED 734,0001,92013 Jul 2026Off-plan
13031-bed733AED 1,302,0001,77613 Jul 2026Off-plan
1526Studio381AED 632,1001,6579 Jul 2026Off-plan
860Studio383AED 709,0001,8539 Jul 2026Off-plan
1348Studio389AED 717,0001,8439 Jul 2026Off-plan
414Studio381AED 619,0001,6279 Jul 2026Off-plan
1713Studio381AED 641,0001,6858 Jul 2026Off-plan
4692-bed1,160AED 1,904,0001,6428 Jul 2026Off-plan
339Studio381AED 649,0001,7058 Jul 2026Off-plan
1272Studio383AED 738,0001,9298 Jul 2026Off-plan
847Studio381AED 707,0001,8588 Jul 2026Off-plan
826Studio381AED 637,0001,6708 Jul 2026Off-plan
4581-bed663AED 1,195,0001,8048 Jul 2026Off-plan
1540Studio381AED 674,0001,7717 Jul 2026Off-plan
823Studio382AED 638,0001,6727 Jul 2026Off-plan
1623Studio382AED 621,1201,6287 Jul 2026Off-plan
426Studio381AED 633,0001,6607 Jul 2026Off-plan
14791-bed661AED 1,134,0001,7167 Jul 2026Off-plan
1125Studio381AED 640,0001,6807 Jul 2026Off-plan
11791-bed661AED 1,130,0001,7107 Jul 2026Off-plan
218Studio381AED 617,0001,6216 Jul 2026Off-plan
6591-bed734AED 1,278,0001,7426 Jul 2026Off-plan
14581-bed663AED 1,119,3801,6903 Jul 2026Off-plan
1732-bed1,121AED 1,729,8001,5433 Jul 2026Off-plan
1116Studio381AED 615,9501,6183 Jul 2026Off-plan
375Studio382AED 692,0001,8123 Jul 2026Off-plan
1001Studio389AED 730,0001,8783 Jul 2026Off-plan
756Studio382AED 731,0001,9132 Jul 2026Off-plan
139Studio448AED 682,0001,5222 Jul 2026Off-plan
560Studio383AED 735,0001,9212 Jul 2026Off-plan
1313Studio381AED 641,0001,6852 Jul 2026Off-plan
116Studio381AED 616,0001,6181 Jul 2026Off-plan
10732-bed1,121AED 1,854,7201,6541 Jul 2026Off-plan
14732-bed1,121AED 1,858,5601,6571 Jul 2026Off-plan
12732-bed1,121AED 1,856,6401,6561 Jul 2026Off-plan
417Studio381AED 619,0001,6271 Jul 2026Off-plan
5681-bed876AED 1,558,0001,7791 Jul 2026Off-plan
647Studio381AED 722,0001,8971 Jul 2026Off-plan
14551-bed733AED 1,313,0001,7911 Jul 2026Off-plan
1002Studio382AED 729,0001,90930 Jun 2026Off-plan
154Studio381AED 708,5401,85830 Jun 2026Off-plan
1132Studio382AED 641,0001,68030 Jun 2026Off-plan
1056Studio382AED 700,6611,83430 Jun 2026Off-plan
347Studio381AED 711,8101,87030 Jun 2026Off-plan
816Studio381AED 624,0001,63930 Jun 2026Off-plan
1476Studio381AED 723,6901,90130 Jun 2026Off-plan
1453Studio382AED 738,0001,93429 Jun 2026Off-plan
677Studio381AED 722,0001,89729 Jun 2026Off-plan
115Studio381AED 591,8501,55529 Jun 2026Off-plan
915Studio381AED 632,0001,66029 Jun 2026Off-plan
453Studio382AED 712,4601,86727 Jun 2026Off-plan
678Studio382AED 708,0001,85327 Jun 2026Off-plan
11581-bed663AED 1,150,0001,73626 Jun 2026Off-plan
304Studio382AED 704,0001,84226 Jun 2026Off-plan
5073-bed1,645AED 2,615,0001,59026 Jun 2026Off-plan
1010Studio389AED 641,0001,64826 Jun 2026Off-plan
1717Studio381AED 734,0001,92825 Jun 2026Off-plan
704Studio382AED 709,0001,85525 Jun 2026Off-plan
1575Studio382AED 735,0001,92525 Jun 2026Off-plan
456Studio382AED 710,0001,85825 Jun 2026Off-plan
1232Studio382AED 642,0001,68224 Jun 2026Off-plan
933Studio381AED 637,0001,67424 Jun 2026Off-plan
615Studio381AED 616,4201,62024 Jun 2026Off-plan
144Studio381AED 701,6801,84423 Jun 2026Off-plan
625Studio381AED 635,0001,66623 Jun 2026Off-plan
1004Studio382AED 665,9501,74223 Jun 2026Off-plan
102Studio382AED 719,0001,88323 Jun 2026Off-plan
1078Studio382AED 700,0001,83222 Jun 2026Off-plan
1672Studio383AED 726,0001,89722 Jun 2026Off-plan
1616Studio381AED 640,0001,68222 Jun 2026Off-plan
1426Studio381AED 631,1201,65522 Jun 2026Off-plan
1047Studio381AED 727,0001,91019 Jun 2026Off-plan
16701-bed744AED 1,305,0001,75519 Jun 2026Off-plan
235Studio381AED 611,8001,60419 Jun 2026Off-plan
7311-bed651AED 1,009,0001,55119 Jun 2026Off-plan
1541Studio381AED 674,0001,77119 Jun 2026Off-plan
440Studio381AED 650,0001,70819 Jun 2026Off-plan
1133Studio381AED 633,0001,66418 Jun 2026Off-plan
861Studio382AED 720,0001,88518 Jun 2026Off-plan
1704Studio382AED 721,0001,88618 Jun 2026Off-plan
11701-bed744AED 1,336,0001,79618 Jun 2026Off-plan
140Studio447AED 681,0001,52218 Jun 2026Off-plan
3212-bed1,156AED 1,537,2001,33018 Jun 2026Off-plan
1317Studio381AED 641,0001,68518 Jun 2026Off-plan
211Studio381AED 617,0001,62118 Jun 2026Off-plan
1148Studio389AED 726,0001,86618 Jun 2026Off-plan
1234Studio381AED 641,0001,68418 Jun 2026Off-plan
378Studio382AED 692,0001,81118 Jun 2026Off-plan
978Studio382AED 699,0001,82917 Jun 2026Off-plan
614Studio381AED 632,0001,66117 Jun 2026Off-plan
1360Studio383AED 727,0001,90017 Jun 2026Off-plan
657Studio386AED 724,0001,87517 Jun 2026Off-plan
1110Studio389AED 642,0001,65017 Jun 2026Off-plan
10281-bed730AED 1,133,0001,55316 Jun 2026Off-plan
533Studio381AED 632,0001,66116 Jun 2026Off-plan
1332Studio382AED 637,5601,67116 Jun 2026Off-plan
8791-bed661AED 1,180,0001,78516 Jun 2026Off-plan
919Studio384AED 638,0001,66416 Jun 2026Off-plan
12092-bed1,159AED 1,538,1001,32716 Jun 2026Off-plan
1316Studio381AED 641,0001,68414 Jun 2026Off-plan
1032Studio382AED 640,0001,67714 Jun 2026Off-plan
11692-bed1,160AED 1,901,7001,64013 Jun 2026Off-plan
315Studio381AED 619,0001,62613 Jun 2026Off-plan
216Studio381AED 617,0001,62113 Jun 2026Off-plan
1305Studio381AED 715,0001,87512 Jun 2026Off-plan
9372-bed1,156AED 1,625,4001,40711 Jun 2026Off-plan
1440Studio381AED 673,0001,76811 Jun 2026Off-plan
10031-bed733AED 1,299,0001,77211 Jun 2026Off-plan
844Studio381AED 707,0001,85811 Jun 2026Off-plan
226Studio381AED 599,0401,5719 Jun 2026Off-plan
635Studio381AED 616,3201,6169 Jun 2026Off-plan
740Studio381AED 626,8801,6479 Jun 2026Off-plan
932Studio382AED 639,0001,6759 Jun 2026Off-plan
739Studio381AED 627,8401,6509 Jun 2026Off-plan
11492-bed1,160AED 1,792,8001,5469 Jun 2026Off-plan
1178Studio382AED 702,0001,8379 Jun 2026Off-plan
539Studio381AED 624,9601,6429 Jun 2026Off-plan
504Studio382AED 724,0001,8949 Jun 2026Off-plan
926Studio381AED 639,0001,6769 Jun 2026Off-plan
839Studio381AED 628,8001,6529 Jun 2026Off-plan
4361-bed735AED 1,093,1901,4889 Jun 2026Off-plan
1613Studio381AED 640,0001,6829 Jun 2026Off-plan
134Studio380AED 595,2001,5669 Jun 2026Off-plan
640Studio381AED 625,9201,6459 Jun 2026Off-plan
923Studio382AED 639,0001,6759 Jun 2026Off-plan
334Studio381AED 599,0401,5749 Jun 2026Off-plan
317Studio381AED 625,0001,6439 Jun 2026Off-plan
1375Studio382AED 704,0001,8439 Jun 2026Off-plan
842Studio381AED 724,0001,9029 Jun 2026Off-plan
232Studio382AED 599,0401,5709 Jun 2026Off-plan
515Studio381AED 621,0001,6328 Jun 2026Off-plan
277Studio381AED 688,0001,8088 Jun 2026Off-plan
133Studio381AED 596,1601,5678 Jun 2026Off-plan
11311-bed651AED 960,0001,4768 Jun 2026Off-plan
1346Studio381AED 730,0001,9198 Jun 2026Off-plan
11271-bed650AED 960,0001,4788 Jun 2026Off-plan
13271-bed650AED 961,9201,4818 Jun 2026Off-plan
132Studio382AED 598,0801,5678 Jun 2026Off-plan
516Studio381AED 621,0001,6328 Jun 2026Off-plan
1634Studio381AED 645,0001,6958 Jun 2026Off-plan
125Studio381AED 597,1201,5678 Jun 2026Off-plan
1146Studio381AED 710,0001,8668 Jun 2026Off-plan
12271-bed650AED 960,9601,4798 Jun 2026Off-plan
13311-bed651AED 962,8801,4808 Jun 2026Off-plan
12311-bed651AED 961,9201,4798 Jun 2026Off-plan
1035Studio381AED 654,0001,7155 Jun 2026Off-plan
323Studio382AED 632,0001,6565 Jun 2026Off-plan
1135Studio381AED 655,0001,7185 Jun 2026Off-plan
454Studio381AED 709,0001,8592 Jun 2026Off-plan
1016Studio381AED 637,0001,6742 Jun 2026Off-plan
217Studio381AED 617,0001,6222 Jun 2026Off-plan
104Studio382AED 690,0001,8052 Jun 2026Off-plan
513Studio381AED 621,0001,6322 Jun 2026Off-plan
1271-bed650AED 1,001,0001,5412 Jun 2026Off-plan
7031-bed733AED 1,258,0001,7161 Jun 2026Off-plan
13692-bed1,160AED 1,883,2401,6241 Jun 2026Off-plan
1502Studio382AED 720,3001,88625 May 2026Off-plan
171Studio382AED 724,0001,89625 May 2026Off-plan
3271-bed650AED 1,004,0001,54625 May 2026Off-plan
1312Studio381AED 641,0001,68425 May 2026Off-plan
1501Studio389AED 720,3001,85325 May 2026Off-plan
15791-bed661AED 1,135,0001,71725 May 2026Off-plan
6791-bed661AED 1,124,0001,70025 May 2026Off-plan
2692-bed1,160AED 1,757,3601,51522 May 2026Off-plan
11212-bed1,156AED 1,717,0001,48622 May 2026Off-plan
16092-bed1,159AED 1,541,7001,33021 May 2026Off-plan
448Studio389AED 718,0001,84621 May 2026Off-plan
356Studio382AED 712,4601,86521 May 2026Off-plan
1223Studio382AED 642,0001,68220 May 2026Off-plan
9732-bed1,121AED 1,679,9701,49820 May 2026Off-plan
526Studio381AED 621,3201,62919 May 2026Off-plan
12791-bed661AED 1,160,3201,75519 May 2026Off-plan
110Studio389AED 637,0001,63719 May 2026Off-plan
8732-bed1,121AED 1,592,2501,42018 May 2026Off-plan
1239Studio381AED 660,0001,73416 May 2026Off-plan
410Studio389AED 645,0001,65815 May 2026Off-plan
6661-bed742AED 1,313,0001,77115 May 2026Off-plan
1341Studio381AED 681,0001,79015 May 2026Off-plan
413Studio381AED 626,0001,64515 May 2026Off-plan
1556Studio382AED 740,0001,93715 May 2026Off-plan
16073-bed1,645AED 2,390,0801,45315 May 2026Off-plan
1605Studio381AED 712,9501,86915 May 2026Off-plan
772Studio383AED 732,0001,91314 May 2026Off-plan
340Studio381AED 670,0001,76014 May 2026Off-plan
971Studio382AED 733,0001,91914 May 2026Off-plan
1517Studio381AED 639,0001,67914 May 2026Off-plan
815Studio381AED 624,0001,63914 May 2026Off-plan
524Studio380AED 632,0001,66312 May 2026Off-plan
10372-bed1,156AED 1,510,0801,30712 May 2026Off-plan
1405Studio381AED 701,6801,84012 May 2026Off-plan
935Studio381AED 652,0001,71012 May 2026Off-plan
1448Studio389AED 730,0001,87712 May 2026Off-plan
1315Studio381AED 637,0001,6749 May 2026Off-plan
1561Studio382AED 745,0001,9519 May 2026Off-plan
813Studio381AED 618,3801,6251 May 2026Off-plan
1333Studio381AED 634,5901,6681 May 2026Off-plan
924Studio380AED 636,0001,67330 Apr 2026Off-plan
819Studio384AED 633,0001,6516 Apr 2026Off-plan
1714Studio381AED 628,1801,6512 Apr 2026Off-plan
1443Studio381AED 714,0001,87631 Mar 2026Off-plan
675Studio382AED 695,0001,82030 Mar 2026Off-plan
1460Studio383AED 716,0001,87126 Mar 2026Off-plan
575Studio382AED 694,0001,81724 Mar 2026Off-plan
1418Studio381AED 638,0001,67611 Mar 2026Off-plan
4092-bed1,159AED 1,701,0001,4676 Mar 2026Off-plan
572Studio383AED 713,0001,8636 Mar 2026Off-plan
545Studio381AED 703,0001,84727 Feb 2026Off-plan
354Studio381AED 708,0001,85627 Feb 2026Off-plan
875Studio382AED 698,0001,82826 Feb 2026Off-plan
1447Studio381AED 731,0001,92126 Feb 2026Off-plan
544Studio381AED 703,0001,84726 Feb 2026Off-plan
204Studio382AED 703,0001,83924 Feb 2026Off-plan
9061-bed740AED 1,254,0001,69424 Feb 2026Off-plan
156Studio382AED 687,8001,80023 Feb 2026Off-plan
10092-bed1,159AED 1,535,4001,32420 Feb 2026Off-plan
2791-bed661AED 1,173,0001,77518 Feb 2026Off-plan
744Studio381AED 715,7701,88116 Feb 2026Off-plan
1614Studio381AED 633,0001,66412 Feb 2026Off-plan
301Studio389AED 707,5601,82011 Feb 2026Off-plan
272Studio383AED 712,4601,86211 Feb 2026Off-plan
944Studio381AED 725,0001,90511 Feb 2026Off-plan
342Studio381AED 689,0001,8106 Feb 2026Off-plan
16591-bed734AED 1,277,1001,7415 Feb 2026Off-plan
546Studio381AED 667,8501,7554 Feb 2026Off-plan
1518Studio381AED 639,0001,67930 Jan 2026Off-plan
9092-bed1,159AED 1,705,0001,47127 Jan 2026Off-plan
3581-bed663AED 1,161,0001,75221 Jan 2026Off-plan
326Studio381AED 619,3601,62421 Jan 2026Off-plan
2521-bed740AED 1,237,3041,67221 Jan 2026Off-plan
1413Studio381AED 638,0001,67721 Jan 2026Off-plan
1632Studio382AED 634,0601,66219 Jan 2026Off-plan
975Studio382AED 699,0001,8309 Jan 2026Off-plan
1039Studio381AED 669,0001,7582 Jan 2026Off-plan
1139Studio381AED 670,0001,76030 Dec 2025Off-plan
7361-bed735AED 1,134,0001,54330 Dec 2025Off-plan
14692-bed1,160AED 2,011,0001,73424 Dec 2025Off-plan
746Studio381AED 694,0001,82423 Dec 2025Off-plan
13081-bed875AED 1,455,0001,66222 Dec 2025Off-plan
745Studio381AED 694,0001,82319 Dec 2025Off-plan
1417Studio381AED 642,0001,68715 Dec 2025Off-plan
1235Studio381AED 656,0001,72015 Dec 2025Off-plan
1376Studio381AED 708,1001,86015 Dec 2025Off-plan
3061-bed740AED 1,269,0001,7148 Dec 2025Off-plan
424Studio380AED 630,0001,6588 Dec 2025Off-plan
760Studio383AED 708,0001,8505 Dec 2025Off-plan
1176Studio381AED 699,0001,83729 Nov 2025Off-plan
8311-bed651AED 1,014,0001,55926 Nov 2025Off-plan
878Studio382AED 698,0001,82725 Nov 2025Off-plan
1304Studio382AED 733,0001,91820 Nov 2025Off-plan
1515Studio381AED 607,0501,59517 Nov 2025Off-plan
1511Studio381AED 607,0501,59517 Nov 2025Off-plan
1523Studio382AED 613,7001,60817 Nov 2025Off-plan
4271-bed650AED 1,006,0001,54915 Nov 2025Off-plan
14061-bed740AED 1,305,8101,76414 Nov 2025Off-plan
1415Studio381AED 631,6201,65914 Nov 2025Off-plan
13632-bed1,150AED 1,916,0001,66614 Nov 2025Off-plan
1414Studio381AED 631,6201,66014 Nov 2025Off-plan
1524Studio380AED 643,0001,69214 Nov 2025Off-plan
7791-bed661AED 1,126,0001,7038 Nov 2025Off-plan
834Studio381AED 623,2801,63831 Oct 2025Off-plan
811Studio381AED 624,0001,63930 Oct 2025Off-plan
8281-bed730AED 1,131,0001,55030 Oct 2025Off-plan
343Studio381AED 639,0201,67929 Oct 2025Off-plan
715Studio381AED 623,0001,63729 Oct 2025Off-plan
1646Studio381AED 725,6701,90729 Oct 2025Off-plan
3732-bed1,121AED 1,904,7601,69928 Oct 2025Off-plan
432Studio382AED 620,3401,62628 Oct 2025Off-plan
953Studio382AED 715,0001,87428 Oct 2025Off-plan
954Studio381AED 715,0001,87528 Oct 2025Off-plan
853Studio382AED 714,0001,87128 Oct 2025Off-plan
9791-bed661AED 1,169,1901,76928 Oct 2025Off-plan
13732-bed1,121AED 1,876,0001,67328 Oct 2025Off-plan
5732-bed1,121AED 1,906,7401,70024 Oct 2025Off-plan
1115Studio381AED 639,0001,67921 Oct 2025Off-plan
1571Studio382AED 723,0001,89321 Oct 2025Off-plan
1212Studio381AED 629,6401,65417 Oct 2025Off-plan
12681-bed876AED 1,523,0001,73910 Oct 2025Off-plan
1546Studio381AED 724,6801,90510 Oct 2025Off-plan
16681-bed876AED 1,528,0001,74510 Oct 2025Off-plan
776Studio381AED 694,0001,8239 Oct 2025Off-plan
748Studio389AED 722,0001,8568 Oct 2025Off-plan
17061-bed740AED 1,285,0001,7361 Oct 2025Off-plan
1705Studio381AED 719,0001,8851 Oct 2025Off-plan
7501-bed866AED 1,529,5501,76729 Sep 2025Off-plan
157Studio386AED 719,0001,86229 Sep 2025Off-plan
1219Studio384AED 631,0001,64527 Sep 2025Off-plan
734Studio381AED 635,0001,66825 Sep 2025Off-plan
976Studio381AED 696,0001,82924 Sep 2025Off-plan
9271-bed650AED 1,011,0001,55624 Sep 2025Off-plan
732Studio382AED 624,2601,63622 Sep 2025Off-plan
1161Studio382AED 711,0001,86220 Sep 2025Off-plan
1611Studio381AED 645,0001,69519 Sep 2025Off-plan
719Studio384AED 625,0001,63018 Sep 2025Off-plan
1492-bed1,160AED 1,918,0001,65416 Sep 2025Off-plan
801Studio389AED 710,0001,82713 Sep 2025Off-plan
802Studio382AED 710,0001,85913 Sep 2025Off-plan
672Studio383AED 731,0001,9103 Sep 2025Off-plan
916Studio381AED 626,0001,6452 Sep 2025Off-plan
914Studio381AED 625,0001,6432 Sep 2025Off-plan
10791-bed661AED 1,129,0001,70828 Aug 2025Off-plan
542Studio381AED 703,0001,84725 Aug 2025Off-plan
7673-bed1,645AED 2,617,0001,59125 Aug 2025Off-plan
15581-bed663AED 1,208,0001,82322 Aug 2025Off-plan
441Studio381AED 663,3001,74322 Aug 2025Off-plan
318Studio381AED 619,0001,62620 Aug 2025Off-plan
9311-bed651AED 998,0001,53420 Aug 2025Off-plan
8681-bed876AED 1,561,0001,78320 Aug 2025Off-plan
1721Studio389AED 721,0001,85318 Aug 2025Off-plan
913Studio381AED 625,0001,64314 Aug 2025Off-plan
1454Studio381AED 738,0001,93512 Aug 2025Off-plan
6031-bed733AED 1,257,0001,71511 Aug 2025Off-plan
1113Studio381AED 631,6201,66011 Aug 2025Off-plan
818Studio381AED 624,0001,6398 Aug 2025Off-plan
148Studio389AED 703,0001,80728 Jul 2025Off-plan
814Studio381AED 624,0001,64025 Jul 2025Off-plan
1410Studio389AED 652,0001,67625 Jul 2025Off-plan
219Studio384AED 613,4801,60023 Jul 2025Off-plan
1177Studio381AED 698,0001,83414 Jul 2025Off-plan
1077Studio381AED 697,0001,83211 Jul 2025Off-plan
15311-bed651AED 994,9501,5299 Jul 2025Off-plan
1504Studio382AED 698,9401,8299 Jul 2025Off-plan
1505Studio381AED 697,9501,8309 Jul 2025Off-plan
15301-bed730AED 1,114,7401,5279 Jul 2025Off-plan
15031-bed733AED 1,234,5301,6849 Jul 2025Off-plan
1532Studio382AED 632,6101,6589 Jul 2025Off-plan
212Studio381AED 617,0001,6218 Jul 2025Off-plan
1610Studio389AED 652,4101,6777 Jul 2025Off-plan
1710Studio389AED 652,4101,6797 Jul 2025Off-plan
1140Studio381AED 679,0001,7843 Jul 2025Off-plan
1514Studio381AED 632,0001,66130 Jun 2025Off-plan
7692-bed1,160AED 2,003,0001,72716 Jun 2025Off-plan
477Studio381AED 683,1001,79512 Jun 2025Off-plan

Sellers ask 1% less than buyers paid

18 homes are for sale in Azizi Venice 15 Building B. The median advert asks 1% less per sq ft than the median off-plan sale of the same type in the last 12 months. 9 of 17 adverts ask the sold level or less. The median advert has been listed for 27 days; the oldest for 295 days.

TypeFor saleMedian askingAsking per sq ftSold per sq ft (sales)Asking over soldMedian time listed
Studio14AED 665,0001,7431,775 (526)-2%34 days
1-bed1AED 1,100,0001,6921,711 (96)-1%20 days
2-bed2AED 2,045,0001,7641,498 (49)+18%27 days
3-bed1AED 2,700,0001,643too few sales–295 days

How long the adverts have been listed

30 days or less10
31 to 90 days5
91 to 180 days2
More than 180 days1

Each home for sale, closest to sold prices first

TypeSq ftAskingPer sq ftAgainst soldDays listedNotes
Studio382AED 565,0001,479-17%70
Studio388AED 580,0001,495-16%71
Studio382AED 580,0001,518-14%70
Studio380AED 618,0001,626-8%42
Studio381AED 639,0001,677-6%16
Studio381AED 649,9001,706-4%9
Studio382AED 660,0001,728-3%125
1-bed650AED 1,100,0001,692-1%20
Studio381AED 670,0001,759-1%106
2-bed1,159AED 1,790,0001,544+3%27
Studio380AED 720,0001,895+7%25furnished
Studio382AED 730,0001,911+8%54
Studio382AED 730,0001,911+8%-7
Studio382AED 750,0001,963+11%2
Studio382AED 770,0002,016+14%20
2-bed1,160AED 2,300,0001,983+32%27
Studio389AED 1,230,0003,162+78%-5furnished
3-bed1,643AED 2,700,0001,643–295

Adverts: one reading on 7 Oct 2026. Sold prices: off-plan sales in this tower in the last 12 months, 5 or more of the type. An advert has no unit number, so we compare the price per sq ft with the type, not with the same unit. An asking price is not a sale price. Days listed is from the date on the advert: an agent can place a home again as a new advert, so the real time for sale can be longer. 1 adverts have the same type, size and price as another advert: they are probably the same home with a second agent. We cannot show price cuts over time or the time to sell yet: these need more than one reading.

The official record

Checked, not found. We could not match this tower to a building name in the Dubai Land Department register, so sales before 2020, offices, shops, mortgages and gifts are not shown.

Get a message when something changes in Azizi Venice 15 Building B
Sales, price cuts, new adverts and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from Azizi Venice 15 Building B, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
NorthAzizi Venice 15 Building A, a tower 0 m away · Azizi Venice 15, a tower 0 m away · Dubai Marina skyline 26.9 km · Burj Al Arab and the sea 34.1 km · Sheikh Zayed Road 41.3 km · Jumeirah beach and the sea 42.1 km · Burj Khalifa 42.3 km · DIFC 44.0 km
North-eastMeydan racecourse 39.0 km · Dubai Design District 42.1 km · Dubai Creek and Ras Al Khor 44.0 km
North-westAzizi Venice 16, a tower 147 m away

No resident reviews: the tower is not built

Nobody lives in Azizi Venice 15 Building B yet, so there is nothing a resident can tell you. Reviews you see elsewhere under this name are about the sales office, the developer or another building. What we can show is below: what the developer and the documents say about the project. We add resident reviews after handover.

The project: what the developer and the documents say

The tower is not complete, so these are plans and claims, not facts you can check on site. Each one names its source.

Developer
Azizi Developments
Handover due
2027
Unit mix
Studios, 1-bed, 2-bed and 3-bed. Sold in the last 12 months: 525 studios, 96 one-beds, 49 two-beds, 3 three-beds.

Amenities: Swimming pool (community), Gym, Kids' play area, Retail in the wider community, Lagoon and swimmable beaches (wider Azizi Venice community)

Where sources disagree

  • Starting price: dxboffplan shows AED 619,000 for the complex and AED 570,000 for Tower B, versus a Propsearch launch price of AED 64k (likely an incomplete figure).
  • Project dates: dxboffplan shows completion 30 May 2027, with handover Q2 2027; Propsearch says only that construction began in 2025.

Building

Floors, apartments and completion year
Floors are not consistent: Propsearch says 18 or 19 storeys plus 4 basements, while another source and another source search results say 22 floors. Our data shows unit codes up to floor 17, and sales listings reach the 15th floor. The dxboffplan page gives 1,855 units (1,796 residential) for the whole two-building project, not Building B alone, with completion 30 May 2027 (handover Q2 2027).
Reported by a site · live adverts, propsearch.ae, mcconeproperties.com, web search results, our sales data
Amenities list
Sites list swimming pool(s), fitness centre or gym, kids' play area, spa and wellness. Community amenities include a crystal lagoon, swimmable beaches, promenades, retail and restaurants. One listing adds a waterpark, an opera theatre and a hotel. The dxboffplan amenity list is generic and the wider-community items may not be inside Building B.
Reported by a site · propsearch.ae, yallavalue.com

Developer

Who is the developer?
Azizi Developments.
Reported by a site · live adverts, propsearch.ae
Delivery record (on time or late)
Not found for this tower. The registered completion date is 30 May 2027 and the project started 2 May 2025.
Reported by a site · propsearch.ae

Around

Metro and public transport
Not found. A guide mentions only 'future metro connectivity' and 'planned transportation infrastructure'. A listing gives 10 minutes by car to Al Maktoum Airport.
Reported by a site · propsearch.ae, yallavalue.com

Around Azizi Venice 15 Building B

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
Azizi Venice 15 Building B (this tower)–1,717 (674)
Azizi Venice 15 Building A0 m1,667 (157)
Azizi Venice 16147 m1,900 (296)
Azizi Venice 14 Building G351 m1,725 (439)
Azizi Venice 14 Building A352 m1,639 (426)
Azizi Venice 14 Building D423 m1,726 (148)
Azizi Venice 6 Building A508 m1,983 (334)
Azizi Venice 6 Building G508 m2,063 (172)
Azizi Venice 6 Building B508 m2,002 (135)

Drive times with no traffic

ToTimeDistance
Dubai Mall56 min58.1 km
DIFC Gate56 min58.9 km
DXB Terminal 376 min72.6 km
Dubai Marina Mall46 min41.5 km
Mall of the Emirates47 min45.2 km
Kite Beach52 min52.3 km
DWC airport32 min15.8 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Shops, food and services

Nothing is open in the tower: it is not built yet.

Source: Google Maps, read 15 Oct 2026. Straight-line distance from the tower. Each list shows the 10 nearest. Open the name to see it on Google Maps.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 12 Jun 2025 to 13 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (dxboffplan.com, live adverts: community guide, mcconeproperties.com, propsearch.ae, yallavalue.com), read by an AI model on 15 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: a Google Maps place, resident reviews, a floor plan document, unit positions on a floor, the side and view of each unit, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 15 Oct 2026 first build of this page. No correction yet.

Dalia, an AI data analyst. This picture is AI-made.AIAsk Dalia