The Key by HomedgeOff-plan, due 2029too few sales for a price per sq ft
Sales alert
Home › Al Satwa › Mixed-use towers › The Key by Homedge
Map: Google Maps
Off-plan mixed-use tower by Homedge Real Estate Development, handover due in 2029, with 11 floors and 54 units

The Key by Homedge, Al Satwa · by Homedge Real Estate Development

The Key by Homedge, Al Satwa

No price is given for this tower because there are too few recent sales to base one on. 0 market sales in the 12 months to 22 Oct 2026; 0 sales on record since 2020. A median needs at least 5.

The market says
Too few sales on record to say.
James Paul Booth
The agent's view
“The Key by Homedge is off-plan, due in 2029, so no owner has sold a completed home here yet. I see no sale here in the last 90 days. I would wait, or buy a completed home next door where the record is clear.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page

James is the human, licensed broker. Dalia, in the yellow bar, is the AI analyst.

Renting, or buying to let? Signed rents across the area: rent prices on RENT DUBAI →
Size
11 floors · 54 units
AIWritten by Dalia, an AI data analyst. Data to 22 Oct 2026. Built 27 Oct 2026.

From the developer: Homedge Real Estate Development

What Homedge Real Estate Development publishes about The Key by Homedge. Pictures are the developer's artist's impressions, not photos of the building. Each fact shows where it comes from; a fact read from the developer's text is checked word for word.

Checked, not found: artist's impressions, floor plans, a video, a brochure or other PDF, facts we could check. We searched the developer site and the web on 13 Oct 2026. Ask Homedge Real Estate Development for the latest brochure and floor plans.

Street view of The Key by Homedge

The street outside, live from Google, about 164 m from the building. Drag to look around.

Imagery: Google Street View · Open in Google Maps

The Key by Homedge on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Construction progress: not found

We found no public progress record for this tower. Ask the developer for the latest inspection report from the Land Department.

Payment plan: not found

We checked the pages we hold for this tower and found no payment plan that passed our checks. We do not guess one. Ask the developer for the current plan.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, by the developer or by an earlier buyer (a Land Department "delayed sell"). The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 22 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A median needs 5 sales or 3 listings.

Type
No sales and no listings.

Rents are asking rents, not registered contracts. Yield = asking rent divided by the median resale price, before service charge.

Sales we leave out of every median, count and chart (0 of 0 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (0); a sale at exactly the same price as that unit's sale before (0); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Too few resale sales to state a yearly change

0 resale sales in the last 12 months and 0 in the 12 months before. Each period needs at least 5.

Too few quarters with sales to draw a chart.

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most. Grey bars have fewer than 3 sales.

The official record

Checked, not found. We could not match this tower to a building name in the Dubai Land Department register, so sales before 2020, offices, shops, mortgages and gifts are not shown.

Get a message when something changes in The Key by Homedge
Sales, price cuts, new adverts and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from The Key by Homedge, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
NorthBrand Centro, a tower 62 m away · Whitestone Residence, a tower 96 m away · Devini 2, a tower 101 m away
North-eastEnso Jade, a tower 44 m away · Al Salam building, a tower 106 m away
South-eastSquare 334, a tower 30 m away · Trillium Heights, a tower 92 m away · DIFC 1.1 km · Dubai Design District 4.4 km · Dubai Creek and Ras Al Khor 7.0 km
SouthAxilla by Homedge, a tower 23 m away · RBK Building, a tower 89 m away · Evergrin House 2, a tower 107 m away · Burj Khalifa 2.5 km · Sheikh Zayed Road 3.3 km · Meydan racecourse 7.5 km
South-westDhana 1, a tower 60 m away · AD Residences, a tower 110 m away · Jumeirah beach and the sea 3.8 km · Burj Al Arab and the sea 12.4 km · Dubai Marina skyline 20.5 km

No resident reviews: the tower is not built

Nobody lives in The Key by Homedge yet, so there is nothing a resident can tell you. Reviews you see elsewhere under this name are about the sales office, the developer or another building. What we can show is below: what the developer and the documents say about the project. We add resident reviews after handover.

The project: what the developer and the documents say

The tower is not complete, so these are plans and claims, not facts you can check on site. Each one names its source.

Developer
Homedge Real Estate Development (also written Homedge Development)
Handover due
2029
Floors
11
Apartments
54
Unit mix
Studio, 1-bedroom and 2-bedroom apartments (marketing description, not confirmed inventory)

Amenities: Covered parking, High-speed elevators, Secure monitored entry, Landscaped outdoor areas, Seating zones and shared community spaces

Where sources disagree

  • Completion: Diyarat gives handover 1 Jan 2029; Propsearch and dxboffplan give no handover date (dxboffplan shows a dash).
  • Developer name: Propsearch and Diyarat say Homedge Real Estate Development; dxboffplan says Homedge Development. Likely the same company.
  • Area: Propsearch places it in Jumeirah Garden City, Al Satwa; Diyarat says Al Satwa. Not a real conflict.

Building

Floors, apartments and completion year
Propsearch says 11 storeys. Diyarat gives G+2P+8+ROOF (ground, 2 podium, 8 floors, roof), 54 units and handover on 1 Jan 2029. Construction was 0% complete, with a registered start of 1 May 2026.
Reported by a site · live adverts: community guide, dxboffplan.com
Amenities list
The dxboffplan page lists covered parking, high-speed elevators, secure monitored entry, landscaped outdoor areas and seating/shared community spaces. These are marketing claims for a project not yet built.
Reported by a site · propsearch.ae

Developer

Who is the developer?
Homedge Real Estate Development, a Dubai Land Department-registered developer. Diyarat lists 3 DLD projects, 0 active and 108 units; the other two are The Gyld and Axilla.
Reported by a site · live adverts: community guide, dxboffplan.com, propsearch.ae

Around

Entertainment within a 15-minute walk
Propsearch lists, as straight-line distances, Jumeirah Garden City parks 0.4 km, Al Satwa Public Park 0.5 km, Museum of the Future 0.9 km, Cinema Akil 1.1 km, and ladies nights, bars and brunches at 0.7-1.5 km. Walking times are not given.
Reported by a site · live adverts: community guide

Around The Key by Homedge

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
The Key by Homedge (this tower)–– (0)
Enso Jade44 m2,153 (103)
Brand Centro62 m– (0)
Trillium Heights92 m– (1)
Whitestone Residence96 m2,031 (14)
Evergrin House 2107 m2,430 (158)

Drive times with no traffic

ToTimeDistance
Dubai Mall9 min5.1 km
DIFC Gate8 min6.3 km
DXB Terminal 332 min19.9 km
Dubai Marina Mall24 min22.2 km
Mall of the Emirates17 min15.9 km
Kite Beach13 min10.6 km
DWC airport53 min54.7 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 2020 to 22 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., diyarat.ae, dxboffplan.com, live adverts: community guide, propsearch.ae), read by an AI model on 27 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: sales, live listings, a Google Maps place, resident reviews, a floor plan document, unit positions on a floor, the side and view of each unit, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 27 Oct 2026 first build of this page. No correction yet.

DaliaAIAsk DaliaAI analyst

Rental data (signed rents, renewals, asking against signed): RENT DUBAI, our sister site for tenants, from Dubai Land Department Ejari leases.