Capri 1AOff-plan, due 2029AED 1,440 per sq ft no change in a year off-plan, 82 sales
Sales alert
Home › Dubai Investment Park (DIP) › Residential towers › Dubai Investment Park 2 (DIP 2) › Capri 1A
Aerial render of curved terraced building with pool and fountains
Aerial render of curved terraced building with pool and fountains. Render: skyviewdubai.com
Off-plan mid-range residential tower by DAMAC Properties, handover due in 2029, with 14 floors and 187 off-plan sales on the Land Department record

Capri 1A, Dubai Investment Park (DIP) · by DAMAC Properties

An off-plan 1-bed in Capri 1A sells for about AED 1.16m

Median of 77 off-plan sales in the 12 months to 21 Oct 2026, from Land Department records. Last sale in the tower: 9 Oct 2026.

The market says
82 off-plan sales in the 12 months to 21 Oct 2026 at AED 1,440 per sq ft (no change in a year); 1 home for sale now.
James Paul Booth
The agent's view
“Capri 1A is off-plan, due in 2029, so no owner has sold a completed home here yet. Buyers took 82 homes here in the 12 months to 21 Oct 2026, at about AED 1,440 per sq ft. Demand is there. Your return depends on the handover date and on the price of the completed towers next door on that day.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page

James is the human, licensed broker. Dalia, in the yellow bar, is the AI analyst.

Renting, or buying to let? Signed rents across the area: rent prices on RENT DUBAI →
Size
14 floors
186 units with a sale on record since 2025.
82sales in the 12 months to 21 Oct 2026: 82 off-plan
1for sale now
Off-plannot built yet: every sale so far is off-plan
AIWritten by Dalia, an AI data analyst. Data to 20 Oct 2026. Built 22 Oct 2026.

Pictures of Capri 1A

Aerial render of curved terraced building with pool and fountains
Aerial render of curved terraced building with pool and fountains
Render: skyviewdubai.com
Project picture: Capri 1. Tower with podium and lagoon at dusk
Project picture: Capri 1. Tower with podium and lagoon at dusk
Render: propsearch.ae
Project picture: Capri 1. Terracotta stepped facade above podium and lagoon
Project picture: Capri 1. Terracotta stepped facade above podium and lagoon
Render: propsearch.ae

3 pictures of this building: developer renders. Each shows its source; select one to open it there. A drawing is made by BUY DUBAI from real pictures and is marked as a drawing.

Other towers in Dubai Investment Park 2 (DIP 2)

Capri 1A is in Dubai Investment Park 2 (DIP 2), Dubai Investment Park. Sold prices and sales for the other towers with a page:

From the developer: DAMAC Properties

What DAMAC Properties publishes about Capri 1A. Pictures are the developer's artist's impressions, not photos of the building. Each fact shows where it comes from; a fact read from the developer's text is checked word for word.

Checked, not found: artist's impressions, floor plans, a video, a brochure or other PDF, facts we could check. We searched the developer site and the web on 13 Oct 2026. Ask DAMAC Properties for the latest brochure and floor plans.

Capri 1A on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Construction progress: not found

We found no public progress record for this tower. Ask the developer for the latest inspection report from the Land Department.

Payment plan: not found

We checked the pages we hold for this tower and found no payment plan that passed our checks. We do not guess one. Ask the developer for the current plan.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, by the developer or by an earlier buyer (a Land Department "delayed sell"). The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 21 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A sold median needs 10 sales, an advert median 3 adverts.

TypeOff-plan: soldOff-plan: per sq ftMedian asking
1-bedAED 1,162,000 (77)1,440– (1)

Sold prices: Land Department sale records to 21 Oct 2026, BUY DUBAI facts cube. Asking and rent are adverts, not contracts.

Sales we leave out of every median, count and chart (0 of 187 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (0); a sale at exactly the same price as that unit's sale before (0); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Off-plan price per sq ft did not change in a year

Median AED 1,440 per sq ft in the last 12 months (82 off-plan sales) against AED 1,447 in the 12 months before (105 off-plan sales).

2025-Q3: AED 1,461 per sq ft, 36 sales1,46125 Q32025-Q4: AED 1,441 per sq ft, 137 sales1,44125 Q436 sales36137 sales137Median AED per sq ftNumber of sales

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most; Land Department records, quarters with 10 or more sales. Off-plan sales are 100% of sales in the last 12 months, so the bars can mix launch and resale prices.

Every sale since 2025: 187 sales of 186 units

Newest first. Each sale is marked Resale or Off-plan. The last column shows the change from the same unit's sale before.

UnitTypeSq ftPriceAED per sq ftDateMarketAgainst the sale before
7131-bed696AED 945,6401,3599 Oct 2026Off-plan
1041-bed1,157AED 1,635,0001,41324 Jun 2026Off-plan
8011-bed1,028AED 1,507,0001,46624 Jun 2026Off-plan
2061-bed698AED 972,9101,39418 May 2026Off-plan
5011-bed1,028AED 1,477,0801,43716 Apr 2026Off-plan
6011-bed1,028AED 1,482,0301,44216 Apr 2026Off-plan
3081-bed1,091AED 1,573,1101,44116 Apr 2026Off-plan
6081-bed1,039AED 1,513,7101,45614 Apr 2026Off-plan
10081-bed1,039AED 1,550,0001,4916 Apr 2026Off-plan
1101-bed946AED 1,340,0001,41612 Feb 2026Off-plan
3031-bed702AED 1,011,0001,44130 Jan 2026Off-plan
4081-bed1,039AED 1,519,0001,46130 Jan 2026Off-plan
4061-bed698AED 1,010,0001,44722 Jan 2026Off-plan
14091-bed757AED 1,200,0001,58419 Jan 2026Off-plan, sold again+10% from AED 1.09m in 2025
11111-bed890AED 1,280,0001,43829 Dec 2025Off-plan
8111-bed890AED 1,267,0001,42423 Dec 2025Off-plan
12141-bed960AED 1,412,0001,47123 Dec 2025Off-plan
11141-bed958AED 1,405,0001,46619 Dec 2025Off-plan
3091-bed755AED 1,099,0001,45616 Dec 2025Off-plan
5071-bed743AED 1,051,0501,4158 Dec 2025Off-plan
3102-bed1,418AED 1,993,0001,4055 Dec 2025Off-plan
12051-bed803AED 1,145,2801,42628 Nov 2025Off-plan
10011-bed1,028AED 1,517,0001,47627 Nov 2025Off-plan
1071-bed869AED 1,221,0001,40527 Nov 2025Off-plan
6061-bed698AED 986,4901,41326 Nov 2025Off-plan
3071-bed743AED 1,071,0001,44224 Nov 2025Off-plan
11041-bed819AED 1,213,0001,48124 Nov 2025Off-plan
11031-bed702AED 1,039,0001,48120 Nov 2025Off-plan
11021-bed702AED 1,040,0001,48220 Nov 2025Off-plan
6091-bed757AED 1,080,5801,42719 Nov 2025Off-plan
1031-bed741AED 1,060,0001,43119 Nov 2025Off-plan
9061-bed797AED 1,173,0001,47119 Nov 2025Off-plan
2081-bed1,039AED 1,508,0001,45116 Nov 2025Off-plan
9031-bed702AED 1,032,0001,47112 Nov 2025Off-plan
2071-bed743AED 1,067,0001,43612 Nov 2025Off-plan
6121-bed717AED 1,033,0001,44112 Nov 2025Off-plan
4111-bed890AED 1,249,0001,40311 Nov 2025Off-plan
8051-bed803AED 1,177,0001,46610 Nov 2025Off-plan
13131-bed696AED 1,027,0001,47610 Nov 2025Off-plan
11051-bed799AED 1,183,0001,4817 Nov 2025Off-plan
4102-bed1,366AED 2,000,0001,4646 Nov 2025Off-plan
1021-bed797AED 1,141,0001,4315 Nov 2025Off-plan
14011-bed1,028AED 1,465,8501,42629 Oct 2025Off-plan
14111-bed890AED 1,232,1501,38529 Oct 2025Off-plan
4131-bed787AED 1,127,0001,43129 Oct 2025Off-plan
14031-bed793AED 1,130,5001,42629 Oct 2025Off-plan
14091-bed757AED 1,090,6001,44028 Oct 2025Off-plan
13051-bed799AED 1,155,2701,44628 Oct 2025Off-plan
14131-bed787AED 1,111,5001,41228 Oct 2025Off-plan
13011-bed1,028AED 1,487,0101,44728 Oct 2025Off-plan
8141-bed960AED 1,393,0001,45128 Oct 2025Off-plan
5021-bed702AED 1,018,0001,45128 Oct 2025Off-plan
8041-bed819AED 1,201,0001,46728 Oct 2025Off-plan
14061-bed698AED 995,6001,42628 Oct 2025Off-plan
14071-bed743AED 1,059,2501,42628 Oct 2025Off-plan
9111-bed890AED 1,271,0001,42828 Oct 2025Off-plan
14141-bed960AED 1,354,7001,41128 Oct 2025Off-plan
13121-bed810AED 1,159,1501,43128 Oct 2025Off-plan
3011-bed1,028AED 1,481,0001,44128 Oct 2025Off-plan
14102-bed1,366AED 1,901,9001,39228 Oct 2025Off-plan
5141-bed958AED 1,376,0001,43628 Oct 2025Off-plan
13111-bed890AED 1,249,3601,40428 Oct 2025Off-plan
14021-bed793AED 1,130,5001,42628 Oct 2025Off-plan
8031-bed793AED 1,162,0001,46628 Oct 2025Off-plan
10111-bed890AED 1,275,0001,43327 Oct 2025Off-plan
5111-bed890AED 1,254,0001,40924 Oct 2025Off-plan
12131-bed787AED 1,134,8401,44124 Oct 2025Off-plan
14081-bed1,039AED 1,497,2001,44024 Oct 2025Off-plan
14121-bed717AED 1,011,7501,41224 Oct 2025Off-plan
14051-bed803AED 1,144,7501,42624 Oct 2025Off-plan
3121-bed810AED 1,131,9001,39724 Oct 2025Off-plan
14041-bed819AED 1,168,5001,42722 Oct 2025Off-plan
9121-bed810AED 1,179,0001,45622 Oct 2025Off-plan
9021-bed702AED 1,032,0001,47122 Oct 2025Off-plan
9102-bed1,418AED 2,036,0001,43522 Oct 2025Off-plan
5131-bed696AED 999,0001,43622 Oct 2025Off-plan
6131-bed787AED 1,134,0001,44022 Oct 2025Off-plan
13031-bed702AED 1,014,6201,44622 Oct 2025Off-plan
13081-bed1,091AED 1,594,6801,46121 Oct 2025Off-plan
13041-bed819AED 1,185,3401,44721 Oct 2025Off-plan
13091-bed755AED 1,102,8901,46121 Oct 2025Off-plan
13061-bed797AED 1,153,3301,44621 Oct 2025Off-plan
13021-bed702AED 1,015,5901,44721 Oct 2025Off-plan
9051-bed799AED 1,175,0001,47121 Oct 2025Off-plan
13102-bed1,418AED 2,002,0801,41221 Oct 2025Off-plan
12071-bed743AED 1,059,8401,42720 Oct 2025Off-plan
3061-bed797AED 1,149,0001,44120 Oct 2025Off-plan
5061-bed797AED 1,157,0001,45120 Oct 2025Off-plan
8102-bed1,366AED 1,954,0001,43120 Oct 2025Off-plan
5102-bed1,418AED 2,007,0001,41520 Oct 2025Off-plan
12021-bed793AED 1,130,8801,42720 Oct 2025Off-plan
12031-bed793AED 1,130,8801,42720 Oct 2025Off-plan
13071-bed743AED 1,074,7601,44720 Oct 2025Off-plan
4021-bed793AED 1,146,0001,44620 Oct 2025Off-plan
12091-bed757AED 1,091,5201,44120 Oct 2025Off-plan
12121-bed717AED 1,012,8001,41320 Oct 2025Off-plan
12102-bed1,366AED 1,901,7601,39217 Oct 2025Off-plan
12081-bed1,039AED 1,497,6001,44117 Oct 2025Off-plan
12061-bed698AED 996,4801,42817 Oct 2025Off-plan
9041-bed819AED 1,205,0001,47117 Oct 2025Off-plan
7111-bed890AED 1,262,0001,41817 Oct 2025Off-plan
12111-bed890AED 1,232,6401,38517 Oct 2025Off-plan
12011-bed1,028AED 1,466,8801,42717 Oct 2025Off-plan
7041-bed819AED 1,197,0001,46217 Oct 2025Off-plan
11011-bed1,028AED 1,522,0001,48117 Oct 2025Off-plan
3111-bed890AED 1,245,0001,39917 Oct 2025Off-plan
9091-bed755AED 1,122,0001,48617 Oct 2025Off-plan
12041-bed819AED 1,169,2801,42817 Oct 2025Off-plan
5121-bed810AED 1,163,0001,43616 Oct 2025Off-plan
7051-bed799AED 1,167,0001,46116 Oct 2025Off-plan
4121-bed717AED 1,026,0001,43116 Oct 2025Off-plan
10021-bed793AED 1,170,0001,47616 Oct 2025Off-plan
2121-bed717AED 1,019,0001,42215 Oct 2025Off-plan
2051-bed803AED 1,153,0001,43615 Oct 2025Off-plan
4031-bed793AED 1,146,0001,44614 Oct 2025Off-plan
10061-bed698AED 1,031,0001,47714 Oct 2025Off-plan
6041-bed819AED 1,133,3501,38414 Oct 2025Off-plan
6031-bed793AED 1,154,0001,45614 Oct 2025Off-plan
11102-bed1,418AED 2,050,0001,44514 Oct 2025Off-plan
7081-bed1,091AED 1,578,7801,44614 Oct 2025Off-plan
6021-bed793AED 1,154,0001,45614 Oct 2025Off-plan
10131-bed787AED 1,150,0001,46114 Oct 2025Off-plan
5041-bed819AED 1,129,5501,37914 Oct 2025Off-plan
5091-bed755AED 1,107,0001,46610 Oct 2025Off-plan
8081-bed1,039AED 1,540,0001,48210 Oct 2025Off-plan
6111-bed890AED 1,258,0001,4149 Oct 2025Off-plan
10031-bed793AED 1,170,0001,4769 Oct 2025Off-plan
10141-bed960AED 1,402,0001,4619 Oct 2025Off-plan
10041-bed819AED 1,209,0001,4768 Oct 2025Off-plan
3131-bed696AED 993,0001,4278 Oct 2025Off-plan
2011-bed1,028AED 1,476,0001,4368 Oct 2025Off-plan
6102-bed1,366AED 1,940,0001,4208 Oct 2025Off-plan
3021-bed702AED 1,011,0001,4418 Oct 2025Off-plan
3041-bed819AED 1,181,0001,4428 Oct 2025Off-plan
8021-bed793AED 1,162,0001,4667 Oct 2025Off-plan
2111-bed890AED 1,240,0001,3937 Oct 2025Off-plan
1091-bed775AED 1,097,0001,4157 Oct 2025Off-plan
10102-bed1,366AED 1,967,0001,4407 Oct 2025Off-plan
2041-bed819AED 1,177,0001,4377 Oct 2025Off-plan
1011-bed873AED 1,246,0001,4267 Oct 2025Off-plan
11121-bed810AED 1,187,0001,4657 Oct 2025Off-plan
1062-bed1,450AED 2,024,0001,3967 Oct 2025Off-plan
6141-bed960AED 1,383,0001,4417 Oct 2025Off-plan
4011-bed1,028AED 1,486,0001,4466 Oct 2025Off-plan
3051-bed799AED 1,151,0001,4416 Oct 2025Off-plan
6051-bed803AED 1,169,0001,4563 Oct 2025Off-plan
9131-bed696AED 1,013,0001,4562 Oct 2025Off-plan
7102-bed1,418AED 2,022,0001,4261 Oct 2025Off-plan
7121-bed810AED 1,171,0001,4461 Oct 2025Off-plan
11061-bed797AED 1,181,0001,4811 Oct 2025Off-plan
9081-bed1,091AED 1,622,0001,4861 Oct 2025Off-plan
1081-bed796AED 1,127,0001,41630 Sep 2025Off-plan
4091-bed757AED 1,106,0001,46030 Sep 2025Off-plan
5051-bed799AED 1,159,0001,45130 Sep 2025Off-plan
5031-bed702AED 1,018,0001,45130 Sep 2025Off-plan
7091-bed755AED 1,114,0001,47630 Sep 2025Off-plan
6071-bed743AED 1,082,0001,45630 Sep 2025Off-plan
7021-bed702AED 1,025,0001,46130 Sep 2025Off-plan
7011-bed1,028AED 1,502,0001,46129 Sep 2025Off-plan
4071-bed743AED 1,074,0001,44629 Sep 2025Off-plan
7071-bed743AED 1,085,0001,46029 Sep 2025Off-plan
5081-bed1,091AED 1,600,0001,46629 Sep 2025Off-plan
11081-bed1,091AED 1,633,0001,49629 Sep 2025Off-plan
2021-bed793AED 1,138,0001,43629 Sep 2025Off-plan
7061-bed797AED 1,165,0001,46129 Sep 2025Off-plan
8131-bed787AED 1,142,0001,45029 Sep 2025Off-plan
11131-bed696AED 1,020,0001,46629 Sep 2025Off-plan
11091-bed755AED 1,129,0001,49629 Sep 2025Off-plan
1051-bed757AED 1,094,0001,44626 Sep 2025Off-plan
2131-bed787AED 1,119,0001,42126 Sep 2025Off-plan
4041-bed819AED 1,161,3001,41824 Sep 2025Off-plan
10071-bed743AED 1,097,0001,47724 Sep 2025Off-plan
8071-bed743AED 1,089,0001,46624 Sep 2025Off-plan
8091-bed757AED 1,122,0001,48124 Sep 2025Off-plan
9011-bed1,028AED 1,512,0001,47123 Sep 2025Off-plan
10121-bed717AED 1,047,0001,46123 Sep 2025Off-plan
2031-bed793AED 1,138,0001,43622 Sep 2025Off-plan
4051-bed803AED 1,161,0001,44622 Sep 2025Off-plan
9071-bed743AED 1,093,0001,47122 Sep 2025Off-plan
11071-bed743AED 1,100,0001,48122 Sep 2025Off-plan
8061-bed698AED 1,024,0001,46719 Sep 2025Off-plan
10091-bed757AED 1,129,0001,49119 Sep 2025Off-plan
10051-bed803AED 1,185,0001,47619 Sep 2025Off-plan
7031-bed702AED 1,025,0001,46119 Sep 2025Off-plan
2091-bed757AED 1,099,0001,45118 Sep 2025Off-plan
2102-bed1,366AED 1,913,0001,40118 Sep 2025Off-plan
8121-bed717AED 1,040,0001,45118 Sep 2025Off-plan

The official record

Checked, not found. We could not match this tower to a building name in the Dubai Land Department register, so sales before 2020, offices, shops, mortgages and gifts are not shown.

Get a message when something changes in Capri 1A
Sales, price cuts, new adverts and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from Capri 1A, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
NorthBurj Al Arab and the sea 19.1 km · Meydan racecourse 21.4 km · Sheikh Zayed Road 24.3 km · Dubai Design District 24.6 km · Burj Khalifa 25.2 km · Jumeirah beach and the sea 25.7 km · DIFC 26.9 km
North-eastDubai Creek and Ras Al Khor 26.2 km
South-eastCapri 1C, a tower 92 m away
SouthCapri 1E, a tower 72 m away · Capri 2A, a tower 108 m away · Capri 2B, a tower 108 m away · Capri 2C, a tower 108 m away · Capri 2D, a tower 108 m away · Capri 2E, a tower 108 m away
South-westCapri 1B, a tower 91 m away · Capri 1D, a tower 91 m away · Marine 2A, a tower 91 m away
WestRoyal 3B, a tower 149 m away · Royal 4B, a tower 149 m away
North-westDubai Marina skyline 14.9 km

No resident reviews: the tower is not built

Nobody lives in Capri 1A yet, so there is nothing a resident can tell you. Reviews you see elsewhere under this name are about the sales office, the developer or another building. What we can show is below: what the developer and the documents say about the project. We add resident reviews after handover.

The project: what the developer and the documents say

The tower is not complete, so these are plans and claims, not facts you can check on site. Each one names its source.

Developer
DAMAC Properties
Handover due
2029
Floors
14
Unit mix
1 and 2 bedroom apartments

Amenities: Pool, Gym, Kids play area, BBQ areas, Retail outlets, Waterfront dining

Where sources disagree

No conflict found between sources.

Building

Floors, apartments and completion year
The tower has 14 residential floors. It is scheduled for handover in March 2029. The total number of apartments in this specific wing is not specified, though the wider Capri 1 cluster has about 824 units.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Amenities list
Marketing materials list a pool, gym, kids adventure land, BBQ areas, retail outlets and waterfront dining. These are shared across the wider Riverside Views campus.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Shops in the building
Amenity lists include retail outlets and dining within the Capri/Riverside Views scheme.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Developer

Who is the developer?
The developer is DAMAC Properties.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Delivery record (on time or late)
The project is currently under construction with a target handover of March 2029. As of September 2026, it was approximately 8.2% complete.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Around

Entertainment within a 15-minute walk
In the community, entertainment options include floating cinema, waterfront restaurants and Malibu Cove leisure facilities within the master plan.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each)., live adverts: community guide
Metro and public transport
In the community, the area is served by the Dubai Investment Park Metro Station on the Red Line and several RTA bus stops connecting to Ibn Battuta and Jebel Ali.
Reported by a site · live adverts: community guide, Resident and public material found on the open web (one passage per block; source and date under each).
What is being built next to it?
In the community, Verdana 1 is starting to welcome residents. The area is also near Expo City Dubai and Al Maktoum International Airport.
Reported by a site · live adverts: community guide, Resident and public material found on the open web (one passage per block; source and date under each).

Around Capri 1A

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
Capri 1A (this tower)–1,440 (96)
Capri 1E72 m1,451 (91)
Capri 1B91 m1,441 (82)
Marine 2A91 m1,476 (27)
Capri 1D91 m1,456 (75)
Capri 1C92 m1,433 (80)
Capri 2E108 m1,470 (32)
Capri 2A108 m1,472 (41)
Capri 2C108 m1,547 (35)

Drive times with no traffic

ToTimeDistance
Dubai Mall44 min42.5 km
DIFC Gate44 min43.3 km
DXB Terminal 362 min54.4 km
Dubai Marina Mall38 min34.2 km
Mall of the Emirates34 min30.3 km
Kite Beach40 min36.2 km
DWC airport31 min17.9 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 18 Sep 2025 to 20 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Resident and public material found on the open web (one passage per block; source and date under each)., live adverts: community guide, mcconeproperties.com), read by an AI model on 22 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: a Google Maps place, resident reviews, a floor plan document, unit positions on a floor, the side and view of each unit, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 22 Oct 2026 first build of this page. No correction yet.

DaliaAIAsk DaliaAI analyst

Rental data (signed rents, renewals, asking against signed): RENT DUBAI, our sister site for tenants, from Dubai Land Department Ejari leases.