Capri 1BOff-plan, due 2029AED 1,439 per sq ft no change in a year off-plan, 76 sales
Sales alert
Home › Dubai Investment Park (DIP) › Residential towers › Dubai Investment Park 2 (DIP 2) › Capri 1B
Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains
Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains. Render: skyviewdubai.com
Off-plan mid-range residential tower by DAMAC Properties, handover due in 2029, with 14 floors and 158 off-plan sales on the Land Department record

Capri 1B, Dubai Investment Park (DIP) · by DAMAC Properties

An off-plan 1-bed in Capri 1B sells for about AED 1.36m

Median of 70 off-plan sales in the 12 months to 21 Oct 2026, from Land Department records. Last sale in the tower: 22 Jul 2026.

The market says
76 off-plan sales in the 12 months to 21 Oct 2026 at AED 1,439 per sq ft (no change in a year).
James Paul Booth
The agent's view
“Capri 1B is off-plan, due in 2029, so no owner has sold a completed home here yet. Buyers took 76 homes here in the 12 months to 21 Oct 2026, at about AED 1,439 per sq ft. Demand is there. Your return depends on the handover date and on the price of the completed towers next door on that day.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page

James is the human, licensed broker. Dalia, in the yellow bar, is the AI analyst.

Renting, or buying to let? Signed rents across the area: rent prices on RENT DUBAI →
Size
14 floors
Service charge
AED 14.0 per sq ft a year
157 units with a sale on record since 2025.
76sales in the 12 months to 21 Oct 2026: 76 off-plan
0for sale now
Off-plannot built yet: every sale so far is off-plan
AIWritten by Dalia, an AI data analyst. Data to 20 Oct 2026. Built 22 Oct 2026.

Pictures of Capri 1B

Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains
Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains
Render: skyviewdubai.com
Project picture: Capri 1. Tower with podium and lagoon at dusk
Project picture: Capri 1. Tower with podium and lagoon at dusk
Render: propsearch.ae
Project picture: Capri 1. Terracotta stepped facade above podium and lagoon
Project picture: Capri 1. Terracotta stepped facade above podium and lagoon
Render: propsearch.ae

3 pictures of this building: developer renders. Each shows its source; select one to open it there. A drawing is made by BUY DUBAI from real pictures and is marked as a drawing.

Other towers in Dubai Investment Park 2 (DIP 2)

Capri 1B is in Dubai Investment Park 2 (DIP 2), Dubai Investment Park. Sold prices and sales for the other towers with a page:

From the developer: DAMAC Properties

What DAMAC Properties publishes about Capri 1B. Pictures are the developer's artist's impressions, not photos of the building. Each fact shows where it comes from; a fact read from the developer's text is checked word for word.

Checked, not found: artist's impressions, floor plans, a video, a brochure or other PDF, facts we could check. We searched the developer site and the web on 13 Oct 2026. Ask DAMAC Properties for the latest brochure and floor plans.

Capri 1B on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Construction progress: not found

We found no public progress record for this tower. Ask the developer for the latest inspection report from the Land Department.

Payment plan: not found

We checked the pages we hold for this tower and found no payment plan that passed our checks. We do not guess one. Ask the developer for the current plan.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, by the developer or by an earlier buyer (a Land Department "delayed sell"). The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 21 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A sold median needs 10 sales, an advert median 3 adverts.

TypeOff-plan: soldOff-plan: per sq ft
1-bedAED 1,361,350 (70)1,441

Sold prices: Land Department sale records to 21 Oct 2026, BUY DUBAI facts cube. Asking and rent are adverts, not contracts.

Sales we leave out of every median, count and chart (0 of 158 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (0); a sale at exactly the same price as that unit's sale before (0); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Off-plan price per sq ft did not change in a year

Median AED 1,439 per sq ft in the last 12 months (76 off-plan sales) against AED 1,442 in the 12 months before (82 off-plan sales).

2025-Q3: AED 1,441 per sq ft, 39 sales1,44125 Q32025-Q4: AED 1,441 per sq ft, 99 sales1,44125 Q42026-Q1: AED 1,456 per sq ft, 12 sales1,45626 Q139 sales3999 sales9912 sales12Median AED per sq ftNumber of sales

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most; Land Department records, quarters with 10 or more sales. Off-plan sales are 100% of sales in the last 12 months, so the bars can mix launch and resale prices.

Every sale since 2025: 158 sales of 157 units

Newest first. Each sale is marked Resale or Off-plan. The last column shows the change from the same unit's sale before.

UnitTypeSq ftPriceAED per sq ftDateMarketAgainst the sale before
7041-bed1,044AED 1,525,0001,46122 Jul 2026Off-plan
8061-bed697AED 1,023,0001,46710 Jun 2026Off-plan
8121-bed972AED 1,425,0001,46621 Apr 2026Off-plan
5081-bed1,091AED 1,599,0001,46620 Apr 2026Off-plan
2011-bed1,028AED 1,476,0001,43615 Apr 2026Off-plan
3011-bed1,028AED 1,481,0001,44113 Apr 2026Off-plan
6081-bed1,038AED 1,527,0001,4713 Apr 2026Off-plan
12102-bed1,364AED 2,105,2521,5432 Apr 2026Off-plan, sold again+12% from AED 1.88m in 2025
7081-bed1,091AED 1,537,5501,41024 Mar 2026Off-plan
7011-bed1,028AED 1,502,0001,46113 Mar 2026Off-plan
6051-bed971AED 1,414,0001,45611 Mar 2026Off-plan
13011-bed1,028AED 1,533,0001,49210 Mar 2026Off-plan
13121-bed968AED 1,443,0001,4904 Mar 2026Off-plan
9011-bed1,028AED 1,512,0001,47126 Feb 2026Off-plan
6121-bed972AED 1,415,0001,45524 Feb 2026Off-plan
8011-bed1,028AED 1,507,0001,46618 Feb 2026Off-plan
6011-bed1,028AED 1,467,0601,42713 Feb 2026Off-plan
2061-bed697AED 1,002,0001,4375 Feb 2026Off-plan
2102-bed1,364AED 1,911,0001,4014 Feb 2026Off-plan
9111-bed918AED 1,328,0001,44728 Jan 2026Off-plan
2021-bed793AED 1,138,0001,43630 Dec 2025Off-plan
5111-bed918AED 1,310,0001,42726 Dec 2025Off-plan
1021-bed797AED 1,141,0001,43112 Dec 2025Off-plan
8102-bed1,364AED 1,952,0001,4318 Dec 2025Off-plan
13091-bed755AED 1,137,0001,5064 Dec 2025Off-plan
3041-bed1,044AED 1,413,7601,3553 Dec 2025Off-plan
13071-bed743AED 1,108,0001,49128 Nov 2025Off-plan
8111-bed818AED 1,163,0301,42221 Nov 2025Off-plan
7121-bed968AED 1,414,0001,46019 Nov 2025Off-plan
5121-bed968AED 1,405,0001,45119 Nov 2025Off-plan
9081-bed1,091AED 1,621,0001,48618 Nov 2025Off-plan
6071-bed743AED 1,081,0001,45612 Nov 2025Off-plan
3081-bed1,091AED 1,588,0001,45612 Nov 2025Off-plan
7091-bed755AED 1,114,0001,47611 Nov 2025Off-plan
13051-bed967AED 1,442,0001,49111 Nov 2025Off-plan
12061-bed697AED 985,1501,41310 Nov 2025Off-plan
12121-bed972AED 1,372,7501,41210 Nov 2025Off-plan
11081-bed1,091AED 1,549,4501,42110 Nov 2025Off-plan
12041-bed1,042AED 1,471,5501,41210 Nov 2025Off-plan
11011-bed1,028AED 1,445,9001,40710 Nov 2025Off-plan
11071-bed743AED 1,045,0001,40710 Nov 2025Off-plan
11061-bed797AED 1,121,9501,40710 Nov 2025Off-plan
11031-bed724AED 1,018,4001,40710 Nov 2025Off-plan
12031-bed822AED 1,160,9001,41210 Nov 2025Off-plan
12011-bed1,028AED 1,451,6001,41210 Nov 2025Off-plan
11111-bed918AED 1,270,1501,38410 Nov 2025Off-plan
12111-bed818AED 1,155,2001,41310 Nov 2025Off-plan
11121-bed968AED 1,362,3001,40710 Nov 2025Off-plan
11102-bed1,417AED 1,945,6001,37310 Nov 2025Off-plan
13021-bed693AED 981,3501,41610 Nov 2025Off-plan
14071-bed743AED 1,070,4001,4417 Nov 2025Off-plan
12051-bed971AED 1,370,8501,4127 Nov 2025Off-plan
11091-bed755AED 1,072,5501,4217 Nov 2025Off-plan
6091-bed757AED 1,114,0001,4717 Nov 2025Off-plan
11021-bed693AED 974,7001,4077 Nov 2025Off-plan
12081-bed1,038AED 1,480,1001,4267 Nov 2025Off-plan
12021-bed793AED 1,119,1001,4127 Nov 2025Off-plan
12102-bed1,364AED 1,880,0501,3787 Nov 2025Off-plan
12071-bed743AED 1,048,8001,4127 Nov 2025Off-plan
11051-bed967AED 1,360,4001,4077 Nov 2025Off-plan
13031-bed724AED 1,025,0501,4167 Nov 2025Off-plan
9091-bed755AED 1,122,0001,4866 Nov 2025Off-plan
12091-bed757AED 1,080,1501,4266 Nov 2025Off-plan
11041-bed1,044AED 1,468,7001,4076 Nov 2025Off-plan
9051-bed967AED 1,393,5601,4413 Nov 2025Off-plan
9021-bed693AED 999,6001,4433 Nov 2025Off-plan
9061-bed797AED 1,149,5401,4423 Nov 2025Off-plan
9031-bed724AED 1,043,7001,4423 Nov 2025Off-plan
9041-bed1,044AED 1,504,3001,4413 Nov 2025Off-plan
9071-bed743AED 1,071,1401,4423 Nov 2025Off-plan
9121-bed968AED 1,395,5201,44129 Oct 2025Off-plan
4011-bed1,028AED 1,486,0001,44628 Oct 2025Off-plan
7102-bed1,417AED 2,019,0001,42528 Oct 2025Off-plan
4051-bed971AED 1,404,0001,44624 Oct 2025Off-plan
5021-bed693AED 1,006,0001,45222 Oct 2025Off-plan
8031-bed822AED 1,206,0001,46722 Oct 2025Off-plan
3051-bed967AED 1,393,0001,44021 Oct 2025Off-plan
3121-bed968AED 1,360,1251,40521 Oct 2025Off-plan
2081-bed1,038AED 1,506,0001,45120 Oct 2025Off-plan
2071-bed743AED 1,066,0001,43520 Oct 2025Off-plan
7071-bed743AED 1,085,0001,46020 Oct 2025Off-plan
13041-bed1,044AED 1,556,0001,49120 Oct 2025Off-plan
5102-bed1,417AED 2,005,0001,41517 Oct 2025Off-plan
3091-bed755AED 1,099,0001,45617 Oct 2025Off-plan
13102-bed1,417AED 2,062,0001,45517 Oct 2025Off-plan
5071-bed743AED 1,078,0001,45117 Oct 2025Off-plan
1031-bed740AED 1,059,0001,43017 Oct 2025Off-plan
3021-bed693AED 999,0001,44217 Oct 2025Off-plan
2091-bed757AED 1,099,0001,45116 Oct 2025Off-plan
2051-bed971AED 1,394,0001,43514 Oct 2025Off-plan
6102-bed1,364AED 1,938,0001,42014 Oct 2025Off-plan
8091-bed757AED 1,122,0001,48114 Oct 2025Off-plan
13111-bed918AED 1,346,0001,46714 Oct 2025Off-plan
6021-bed793AED 1,154,0001,45614 Oct 2025Off-plan
7051-bed967AED 1,413,0001,46110 Oct 2025Off-plan
7031-bed724AED 1,058,0001,4629 Oct 2025Off-plan
3071-bed743AED 1,071,0001,4429 Oct 2025Off-plan
4102-bed1,364AED 1,925,0001,4118 Oct 2025Off-plan
7061-bed797AED 1,165,0001,4618 Oct 2025Off-plan
4061-bed697AED 1,009,0001,4478 Oct 2025Off-plan
8051-bed971AED 1,423,0001,4658 Oct 2025Off-plan
7111-bed918AED 1,319,0001,4378 Oct 2025Off-plan
2121-bed972AED 1,354,1201,3938 Oct 2025Off-plan
4021-bed793AED 1,146,0001,4468 Oct 2025Off-plan
4091-bed757AED 1,106,0001,4607 Oct 2025Off-plan
5061-bed797AED 1,157,0001,4517 Oct 2025Off-plan
3061-bed797AED 1,149,0001,4417 Oct 2025Off-plan
6031-bed822AED 1,198,0001,4577 Oct 2025Off-plan
1062-bed1,480AED 2,054,0001,3876 Oct 2025Off-plan
7021-bed693AED 1,013,0001,4626 Oct 2025Off-plan
4071-bed743AED 1,074,0001,4466 Oct 2025Off-plan
8021-bed793AED 1,162,0001,4666 Oct 2025Off-plan
6061-bed697AED 1,016,0001,4573 Oct 2025Off-plan
5031-bed724AED 1,050,0001,4513 Oct 2025Off-plan
13061-bed797AED 1,189,0001,4912 Oct 2025Off-plan
9102-bed1,417AED 2,034,0001,4361 Oct 2025Off-plan
2111-bed818AED 1,175,0001,4371 Oct 2025Off-plan
3111-bed918AED 1,301,0001,41830 Sep 2025Off-plan
4031-bed822AED 1,189,0001,44630 Sep 2025Off-plan
2031-bed822AED 1,181,0001,43630 Sep 2025Off-plan
5091-bed755AED 1,107,0001,46630 Sep 2025Off-plan
3031-bed724AED 1,043,0001,44130 Sep 2025Off-plan
14102-bed1,364AED 1,920,0001,40729 Sep 2025Off-plan
8041-bed1,042AED 1,528,0001,46629 Sep 2025Off-plan
1051-bed757AED 1,094,0001,44629 Sep 2025Off-plan
4121-bed972AED 1,406,0001,44629 Sep 2025Off-plan
5051-bed967AED 1,403,0001,45129 Sep 2025Off-plan
1071-bed918AED 1,292,0001,40829 Sep 2025Off-plan
6111-bed818AED 1,191,0001,45629 Sep 2025Off-plan
6041-bed1,042AED 1,517,0001,45629 Sep 2025Off-plan
8081-bed1,038AED 1,537,0001,48129 Sep 2025Off-plan
4081-bed1,038AED 1,517,0001,46229 Sep 2025Off-plan
8071-bed743AED 1,089,0001,46629 Sep 2025Off-plan
3102-bed1,417AED 1,991,0001,40529 Sep 2025Off-plan
14111-bed818AED 1,178,8801,44229 Sep 2025Off-plan
14031-bed822AED 1,185,6001,44225 Sep 2025Off-plan
10071-bed743AED 1,052,1601,41724 Sep 2025Off-plan
10111-bed818AED 1,159,6801,41822 Sep 2025Off-plan
10121-bed972AED 1,377,6001,41722 Sep 2025Off-plan
14041-bed1,042AED 1,501,4401,44122 Sep 2025Off-plan
13081-bed1,091AED 1,642,0001,50622 Sep 2025Off-plan
10061-bed697AED 988,8001,41822 Sep 2025Off-plan
14021-bed793AED 1,142,4001,44122 Sep 2025Off-plan
14081-bed1,038AED 1,511,0401,45622 Sep 2025Off-plan
10041-bed1,042AED 1,476,4801,41722 Sep 2025Off-plan
10031-bed822AED 1,165,4401,41819 Sep 2025Off-plan
10081-bed1,038AED 1,486,0801,43219 Sep 2025Off-plan
10102-bed1,364AED 1,886,4001,38319 Sep 2025Off-plan
14091-bed757AED 1,102,0801,45519 Sep 2025Off-plan
10011-bed1,028AED 1,456,3201,41719 Sep 2025Off-plan
14011-bed1,028AED 1,481,2801,44119 Sep 2025Off-plan
10021-bed793AED 1,123,2001,41719 Sep 2025Off-plan
14051-bed971AED 1,398,7201,44018 Sep 2025Off-plan
4111-bed818AED 1,183,0001,44718 Sep 2025Off-plan
10051-bed971AED 1,375,6801,41718 Sep 2025Off-plan
14121-bed972AED 1,400,6401,44118 Sep 2025Off-plan
10091-bed757AED 1,083,8401,43118 Sep 2025Off-plan
14061-bed697AED 1,005,1201,44118 Sep 2025Off-plan

The official record

Checked, not found. We could not match this tower to a building name in the Dubai Land Department register, so sales before 2020, offices, shops, mortgages and gifts are not shown.

Get a message when something changes in Capri 1B
Sales, price cuts, new adverts and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from Capri 1B, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
NorthCapri 1D, a tower 0 m away · Marine 2A, a tower 0 m away · Burj Al Arab and the sea 19.2 km · Meydan racecourse 21.4 km · Sheikh Zayed Road 24.3 km · Dubai Design District 24.7 km · Burj Khalifa 25.2 km · Jumeirah beach and the sea 25.7 km · DIFC 26.9 km
North-eastCapri 1A, a tower 91 m away · Dubai Creek and Ras Al Khor 26.3 km
EastCapri 1E, a tower 58 m away · Capri 1C, a tower 106 m away
South-eastCapri 2A, a tower 42 m away · Capri 2B, a tower 42 m away · Capri 2C, a tower 42 m away · Capri 2D, a tower 42 m away · Capri 2E, a tower 42 m away
North-westRoyal 1A, a tower 112 m away · Royal 1B, a tower 112 m away · Dubai Marina skyline 14.9 km

No resident reviews: the tower is not built

Nobody lives in Capri 1B yet, so there is nothing a resident can tell you. Reviews you see elsewhere under this name are about the sales office, the developer or another building. What we can show is below: what the developer and the documents say about the project. We add resident reviews after handover.

The project: what the developer and the documents say

The tower is not complete, so these are plans and claims, not facts you can check on site. Each one names its source.

Developer
DAMAC
Handover due
2029
Floors
14
Service charge
AED 14.0 per sq ft a year
Unit mix
1 and 2 bedrooms

Amenities: pools, gym, kids' play area, clubhouse, retail, outdoor cinema, sports areas, spa, waterfront features

Where sources disagree

No conflict found between sources.

Building

Floors, apartments and completion year
The tower has 14 residential floors. The registered completion date is March 2029. The building contains 1 and 2-bedroom apartments.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each)., our sales data
Amenities list
Planned amenities include pools, a gym, kids' play area, clubhouse, retail outlets, an outdoor cinema, sports areas, a spa, and waterfront features.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Developer

Who is the developer?
DAMAC is the developer.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Delivery record (on time or late)
The original delivery promise was Q2 2028. The current target is Q1 2029, representing a postponement of about 10 months.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Around

Entertainment within a 15-minute walk
In the community, there are mid-sized community malls with cafés and retail outlets, as well as dining hubs like The Market in Green Community and the Ritaj area.
Reported by a site · live adverts: community guide
Metro and public transport
In the community, the Dubai Investment Park Metro Station on the Red Line provides direct access to Expo City and Business Bay. Several RTA bus stops connect the area to Ibn Battuta and Jebel Ali.
Reported by a site · live adverts: community guide
What is being built next to it?
In the community, Verdana 1 is starting to welcome residents.
Reported by a site · live adverts: community guide

Around Capri 1B

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
Capri 1B (this tower)–1,441 (82)
Marine 2A0 m1,476 (27)
Capri 1D0 m1,456 (75)
Capri 2E42 m1,470 (32)
Capri 2A42 m1,472 (41)
Capri 2C42 m1,547 (35)
Capri 2B42 m1,470 (20)
Capri 2D42 m1,488 (24)
Capri 1E58 m1,451 (91)

Drive times with no traffic

ToTimeDistance
Dubai Mall44 min42.5 km
DIFC Gate44 min43.3 km
DXB Terminal 362 min54.4 km
Dubai Marina Mall38 min34.3 km
Mall of the Emirates34 min30.4 km
Kite Beach40 min36.2 km
DWC airport31 min17.9 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 18 Sep 2025 to 20 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Resident and public material found on the open web (one passage per block; source and date under each)., live adverts: community guide, mcconeproperties.com), read by an AI model on 22 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: a Google Maps place, resident reviews, a floor plan document, unit positions on a floor, the side and view of each unit, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 22 Oct 2026 first build of this page. No correction yet.

DaliaAIAsk DaliaAI analyst

Rental data (signed rents, renewals, asking against signed): RENT DUBAI, our sister site for tenants, from Dubai Land Department Ejari leases.