Capri 1DOff-plan, due 2029AED 1,456 per sq ft ▼ 1% in a year off-plan, 71 sales
Sales alert
Home › Dubai Investment Park (DIP) › Residential towers › Dubai Investment Park 2 (DIP 2) › Capri 1D
Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains
Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains. Render: skyviewdubai.com
Off-plan upper mid-range residential tower by DAMAC Properties, handover due in 2029, with 18 floors, 138 units and 136 off-plan sales on the Land Department record

Capri 1D, Dubai Investment Park (DIP) · by DAMAC Properties

An off-plan 1-bed in Capri 1D sells for about AED 1.35m

Median of 64 off-plan sales in the 12 months to 21 Oct 2026, from Land Department records. Last sale in the tower: 11 Sep 2026.

The market says
71 off-plan sales in the 12 months to 21 Oct 2026 at AED 1,456 per sq ft (down 1% in a year).
James Paul Booth
The agent's view
“Capri 1D is off-plan, due in 2029, so no owner has sold a completed home here yet. Buyers took 71 homes here in the 12 months to 21 Oct 2026, at about AED 1,456 per sq ft. Demand is there. Your return depends on the handover date and on the price of the completed towers next door on that day.”
James Paul Booth, Dubai broker since 2018. A personal view. Not financial advice.
Ask James a question about this page

James is the human, licensed broker. Dalia, in the yellow bar, is the AI analyst.

Renting, or buying to let? Signed rents across the area: rent prices on RENT DUBAI →
Size
18 floors · 138 units
136 units with a sale on record since 2025.
71sales in the 12 months to 21 Oct 2026: 71 off-plan
0for sale now
Off-plannot built yet: every sale so far is off-plan
AIWritten by Dalia, an AI data analyst. Data to 20 Oct 2026. Built 22 Oct 2026.

Pictures of Capri 1D

Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains
Project picture: Capri 1. Aerial render of curved terraced building with pool and fountains
Render: skyviewdubai.com
Project picture: Capri 1. Tower with podium and lagoon at dusk
Project picture: Capri 1. Tower with podium and lagoon at dusk
Render: propsearch.ae
Project picture: Capri 1. Terracotta stepped facade above podium and lagoon
Project picture: Capri 1. Terracotta stepped facade above podium and lagoon
Render: propsearch.ae

3 pictures of this building: developer renders. Each shows its source; select one to open it there. A drawing is made by BUY DUBAI from real pictures and is marked as a drawing.

Other towers in Dubai Investment Park 2 (DIP 2)

Capri 1D is in Dubai Investment Park 2 (DIP 2), Dubai Investment Park. Sold prices and sales for the other towers with a page:

From the developer: DAMAC Properties

What DAMAC Properties publishes about Capri 1D. Pictures are the developer's artist's impressions, not photos of the building. Each fact shows where it comes from; a fact read from the developer's text is checked word for word.

Checked, not found: artist's impressions, floor plans, a video, a brochure or other PDF, facts we could check. We searched the developer site and the web on 13 Oct 2026. Ask DAMAC Properties for the latest brochure and floor plans.

Capri 1D on the map

Three views of the same place, from the same direction. The other towers we cover are on all three: click one to open its page.

The map loads when you reach it.

3D: AI picture models of our towers (height and position from the map, detail approximate) and blocks from OpenStreetMap heights.

Construction progress: not found

We found no public progress record for this tower. Ask the developer for the latest inspection report from the Land Department.

Payment plan: not found

We checked the pages we hold for this tower and found no payment plan that passed our checks. We do not guess one. Ask the developer for the current plan.

Resale and off-plan prices by bedroom

Resale = a completed home sold on. Off-plan = a home sold before the tower is complete, by the developer or by an earlier buyer (a Land Department "delayed sell"). The two are different markets, so we never mix them in one price. Sold = median price of sales in the 12 months to 21 Oct 2026. Asking and rent = live listings on 7 Oct 2026. Counts are in brackets. A sold median needs 10 sales, an advert median 3 adverts.

TypeOff-plan: soldOff-plan: per sq ft
1-bedAED 1,354,200 (64)1,459

Sold prices: Land Department sale records to 21 Oct 2026, BUY DUBAI facts cube. Asking and rent are adverts, not contracts.

Sales we leave out of every median, count and chart (0 of 136 here): bulk transfers, meaning 5 or more completed homes sold within two days at prices per sq ft within 25% of each other (0); a sale at exactly the same price as that unit's sale before (0); a size more than 1.6 times the usual size for the recorded type, or a "studio" above 750 sq ft (0). They stay in the list below with a label.

Off-plan price per sq ft fell 1% in a year

Median AED 1,456 per sq ft in the last 12 months (71 off-plan sales) against AED 1,467 in the 12 months before (65 off-plan sales).

2025-Q3: AED 1,467 per sq ft, 27 sales1,46725 Q32025-Q4: AED 1,461 per sq ft, 91 sales1,46125 Q427 sales2791 sales91Median AED per sq ftNumber of sales

Bars: median AED per sq ft by quarter. Blue line and blue numbers under the bars: number of sales in the quarter. Last 16 quarters at most; Land Department records, quarters with 10 or more sales. Off-plan sales are 100% of sales in the last 12 months, so the bars can mix launch and resale prices.

Every sale since 2025: 136 sales of 136 units

Newest first. Each sale is marked Resale or Off-plan. The last column shows the change from the same unit's sale before.

UnitTypeSq ftPriceAED per sq ftDateMarket
7082-bed1,419AED 2,022,0001,42511 Sep 2026Off-plan
5061-bed1,091AED 1,535,0401,40829 Jul 2026Off-plan
7061-bed1,091AED 1,610,0001,47616 Jul 2026Off-plan
1062-bed1,481AED 2,054,0001,3878 May 2026Off-plan
12041-bed697AED 1,037,0001,4876 May 2026Off-plan
2041-bed697AED 1,002,0001,43730 Apr 2026Off-plan
4061-bed1,038AED 1,486,6601,43216 Apr 2026Off-plan
14031-bed967AED 1,408,4401,45614 Apr 2026Off-plan
9101-bed968AED 1,424,0001,4709 Apr 2026Off-plan
8101-bed973AED 1,426,0001,46530 Mar 2026Off-plan
13031-bed963AED 1,436,0001,49111 Mar 2026Off-plan
12101-bed973AED 1,446,0001,4864 Mar 2026Off-plan
12021-bed922AED 1,371,0001,48617 Feb 2026Off-plan
4021-bed922AED 1,334,0001,44613 Feb 2026Off-plan
6041-bed697AED 1,016,0001,45710 Feb 2026Off-plan
2021-bed922AED 1,325,0001,4366 Feb 2026Off-plan
3021-bed924AED 1,332,0001,44129 Jan 2026Off-plan
7021-bed924AED 1,350,0001,46121 Jan 2026Off-plan
8031-bed967AED 1,418,0001,46626 Dec 2025Off-plan
6061-bed1,038AED 1,527,0001,47117 Dec 2025Off-plan
11051-bed743AED 1,100,0001,48116 Dec 2025Off-plan
2031-bed967AED 1,389,0001,43616 Dec 2025Off-plan
3071-bed753AED 1,097,0001,45612 Dec 2025Off-plan
14021-bed922AED 1,385,0001,50111 Dec 2025Off-plan
3051-bed743AED 1,070,0001,4418 Dec 2025Off-plan
7101-bed968AED 1,358,4001,4038 Dec 2025Off-plan
1041-bed1,157AED 1,635,0001,4138 Dec 2025Off-plan
8091-bed818AED 1,199,0001,4665 Dec 2025Off-plan
13051-bed743AED 1,107,0001,4913 Dec 2025Off-plan
7011-bed879AED 1,284,0001,4613 Dec 2025Off-plan
11031-bed963AED 1,426,0001,4803 Dec 2025Off-plan
5011-bed879AED 1,276,0001,45228 Nov 2025Off-plan
12082-bed1,364AED 1,979,0001,45028 Nov 2025Off-plan
4031-bed967AED 1,399,0001,44628 Nov 2025Off-plan
9011-bed879AED 1,293,0001,47127 Nov 2025Off-plan
11082-bed1,419AED 2,009,9801,41727 Nov 2025Off-plan
9021-bed924AED 1,359,0001,47126 Nov 2025Off-plan
10021-bed922AED 1,362,0001,47625 Nov 2025Off-plan
13082-bed1,419AED 2,023,7001,42624 Nov 2025Off-plan
5101-bed968AED 1,405,0001,45121 Nov 2025Off-plan
14082-bed1,364AED 2,000,0001,46621 Nov 2025Off-plan
8011-bed968AED 1,419,0001,46520 Nov 2025Off-plan
11041-bed797AED 1,181,0001,48119 Nov 2025Off-plan
2101-bed973AED 1,397,0001,43519 Nov 2025Off-plan
2061-bed1,038AED 1,506,0001,45112 Nov 2025Off-plan
7051-bed743AED 1,085,0001,46112 Nov 2025Off-plan
3091-bed918AED 1,301,0001,41812 Nov 2025Off-plan
2011-bed968AED 1,390,0001,43510 Nov 2025Off-plan
14071-bed757AED 1,148,0001,51610 Nov 2025Off-plan
5091-bed918AED 1,310,0001,42810 Nov 2025Off-plan
4101-bed973AED 1,407,0001,4467 Nov 2025Off-plan
4091-bed818AED 1,183,0001,4477 Nov 2025Off-plan
9071-bed753AED 1,107,8101,4704 Nov 2025Off-plan
7071-bed753AED 1,112,0001,4763 Nov 2025Off-plan
5031-bed963AED 1,370,0401,42230 Oct 2025Off-plan
10041-bed697AED 1,030,0001,47729 Oct 2025Off-plan
3041-bed797AED 1,149,0001,44129 Oct 2025Off-plan
11101-bed968AED 1,434,0001,48129 Oct 2025Off-plan
1031-bed740AED 1,060,0001,43229 Oct 2025Off-plan
10051-bed743AED 1,096,0001,47628 Oct 2025Off-plan
4082-bed1,364AED 1,925,0001,41128 Oct 2025Off-plan
5051-bed743AED 1,078,0001,45228 Oct 2025Off-plan
10011-bed968AED 1,429,0001,47628 Oct 2025Off-plan
2051-bed743AED 1,067,0001,43727 Oct 2025Off-plan
5021-bed924AED 1,341,0001,45127 Oct 2025Off-plan
14091-bed818AED 1,228,0001,50224 Oct 2025Off-plan
9031-bed963AED 1,417,0001,47122 Oct 2025Off-plan
7041-bed797AED 1,165,0001,46122 Oct 2025Off-plan
6031-bed967AED 1,408,0001,45522 Oct 2025Off-plan
4011-bed968AED 1,400,0001,44621 Oct 2025Off-plan
6011-bed968AED 1,410,0001,45621 Oct 2025Off-plan
13021-bed924AED 1,378,0001,49121 Oct 2025Off-plan
9082-bed1,419AED 2,037,0001,43620 Oct 2025Off-plan
3101-bed968AED 1,395,0001,44020 Oct 2025Off-plan
5071-bed753AED 1,104,0001,46520 Oct 2025Off-plan
11011-bed879AED 1,302,0001,48117 Oct 2025Off-plan
12051-bed743AED 1,104,0001,48617 Oct 2025Off-plan
4051-bed743AED 1,074,0001,44616 Oct 2025Off-plan
13041-bed797AED 1,189,0001,49116 Oct 2025Off-plan
2091-bed818AED 1,175,0001,43715 Oct 2025Off-plan
13011-bed879AED 1,311,0001,49214 Oct 2025Off-plan
14061-bed1,038AED 1,574,0001,51614 Oct 2025Off-plan
12031-bed967AED 1,437,0001,48514 Oct 2025Off-plan
8021-bed922AED 1,352,0001,46610 Oct 2025Off-plan
14051-bed743AED 1,115,0001,5018 Oct 2025Off-plan
8041-bed697AED 1,023,0001,4678 Oct 2025Off-plan
7031-bed963AED 1,407,0001,4608 Oct 2025Off-plan
4071-bed757AED 1,106,0001,4618 Oct 2025Off-plan
10071-bed757AED 1,129,0001,4918 Oct 2025Off-plan
12061-bed1,038AED 1,558,0001,5018 Oct 2025Off-plan
11091-bed918AED 1,337,0001,4578 Oct 2025Off-plan
14011-bed968AED 1,453,0001,5008 Oct 2025Off-plan
9061-bed1,091AED 1,621,0001,4868 Oct 2025Off-plan
9091-bed918AED 1,328,0001,4478 Oct 2025Off-plan
2071-bed757AED 1,099,0001,4518 Oct 2025Off-plan
9041-bed797AED 1,173,0001,4718 Oct 2025Off-plan
3031-bed963AED 1,388,0001,4418 Oct 2025Off-plan
13101-bed968AED 1,444,0001,4917 Oct 2025Off-plan
13071-bed753AED 1,135,0001,5077 Oct 2025Off-plan
1071-bed917AED 1,292,0001,4087 Oct 2025Off-plan
5041-bed797AED 1,157,0001,4517 Oct 2025Off-plan
10031-bed967AED 1,428,0001,4767 Oct 2025Off-plan
8071-bed757AED 1,098,5801,4516 Oct 2025Off-plan
8082-bed1,364AED 1,952,0001,4316 Oct 2025Off-plan
6101-bed973AED 1,417,0001,4562 Oct 2025Off-plan
11061-bed1,091AED 1,631,0001,4962 Oct 2025Off-plan
6091-bed818AED 1,191,0001,4561 Oct 2025Off-plan
8061-bed1,038AED 1,538,0001,4821 Oct 2025Off-plan
14041-bed697AED 1,047,0001,5011 Oct 2025Off-plan
10101-bed973AED 1,436,0001,47530 Sep 2025Off-plan
14101-bed973AED 1,461,0001,50130 Sep 2025Off-plan
8051-bed743AED 1,089,0001,46630 Sep 2025Off-plan
2082-bed1,364AED 1,911,0001,40130 Sep 2025Off-plan
9051-bed743AED 1,092,0001,47130 Sep 2025Off-plan
10061-bed1,038AED 1,548,0001,49129 Sep 2025Off-plan
10091-bed818AED 1,208,0001,47729 Sep 2025Off-plan
3082-bed1,419AED 1,994,0001,40529 Sep 2025Off-plan
1051-bed756AED 1,094,0001,44629 Sep 2025Off-plan
3061-bed1,091AED 1,588,0001,45629 Sep 2025Off-plan
1021-bed797AED 1,141,0001,43129 Sep 2025Off-plan
6082-bed1,364AED 2,003,8921,46929 Sep 2025Off-plan
10082-bed1,364AED 1,965,0001,44029 Sep 2025Off-plan
11071-bed753AED 1,127,0001,49629 Sep 2025Off-plan
12071-bed757AED 1,137,0001,50229 Sep 2025Off-plan
5082-bed1,419AED 2,008,0001,41529 Sep 2025Off-plan
6021-bed922AED 1,343,0001,45629 Sep 2025Off-plan
4041-bed697AED 1,009,0001,44726 Sep 2025Off-plan
12011-bed968AED 1,439,0001,48626 Sep 2025Off-plan
6071-bed757AED 1,114,0001,47125 Sep 2025Off-plan
7091-bed918AED 1,319,0001,43824 Sep 2025Off-plan
13091-bed918AED 1,346,0001,46724 Sep 2025Off-plan
13061-bed1,091AED 1,642,0001,50623 Sep 2025Off-plan
12091-bed818AED 1,216,0001,48723 Sep 2025Off-plan
11021-bed924AED 1,369,0001,48122 Sep 2025Off-plan
6051-bed743AED 1,081,0001,45522 Sep 2025Off-plan
3011-bed879AED 1,267,0001,44119 Sep 2025Off-plan

The official record

Checked, not found. We could not match this tower to a building name in the Dubai Land Department register, so sales before 2020, offices, shops, mortgages and gifts are not shown.

Get a message when something changes in Capri 1D
Sales, price cuts, new adverts and news, on WhatsApp. You choose what and how often.
Sales alert

Which side faces what

The direction of each landmark from Capri 1D, and the towers within 150 m that can stand in the way. What a home really sees depends on its floor and its side of the building. We do not have the unit positions for this tower yet, so we cannot tell you the view of one unit.

SideWhat lies that way
NorthCapri 1B, a tower 0 m away · Marine 2A, a tower 0 m away · Burj Al Arab and the sea 19.2 km · Meydan racecourse 21.4 km · Sheikh Zayed Road 24.3 km · Dubai Design District 24.7 km · Burj Khalifa 25.2 km · Jumeirah beach and the sea 25.7 km · DIFC 26.9 km
North-eastCapri 1A, a tower 91 m away · Dubai Creek and Ras Al Khor 26.3 km
EastCapri 1E, a tower 58 m away · Capri 1C, a tower 106 m away
South-eastCapri 2A, a tower 42 m away · Capri 2B, a tower 42 m away · Capri 2C, a tower 42 m away · Capri 2D, a tower 42 m away · Capri 2E, a tower 42 m away
North-westRoyal 1A, a tower 112 m away · Royal 1B, a tower 112 m away · Dubai Marina skyline 14.9 km

No resident reviews: the tower is not built

Nobody lives in Capri 1D yet, so there is nothing a resident can tell you. Reviews you see elsewhere under this name are about the sales office, the developer or another building. What we can show is below: what the developer and the documents say about the project. We add resident reviews after handover.

The project: what the developer and the documents say

The tower is not complete, so these are plans and claims, not facts you can check on site. Each one names its source.

Developer
DAMAC Properties
Handover due
2029
Floors
18
Apartments
138
Unit mix
138 units: 124 one-bedroom and 14 two-bedroom apartments

Amenities: Retail outlets, Game Room, Amphitheatre, Clubhouse, Essential Oil Lakes

Where sources disagree

No conflict found between sources.

Building

Floors, apartments and completion year
The tower has 18 floors and 138 apartments. It is scheduled for completion in March 2029.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Amenities list
Amenities include retail outlets, a game room, an amphitheatre, a clubhouse, and essential oil lakes.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Developer

Who is the developer?
The developer is DAMAC Properties.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).
Delivery record (on time or late)
The project is currently under construction with a planned handover date of March 2029.
Reported by a site · Resident and public material found on the open web (one passage per block; source and date under each).

Around

Entertainment within a 15-minute walk
In the community, there are mid-sized malls like Souq Extra and The Market offering dining and retail, as well as Green Community Park & Lake.
Reported by a site · live adverts: community guide
Metro and public transport
In the community, the Dubai Investment Park Metro Station on the Red Line provides direct access to key areas, supplemented by several RTA bus stops.
Reported by a site · live adverts: community guide

Around Capri 1D

Price against the nearest towers

TowerDistanceAED per sq ft, 12 months (sales)
Capri 1D (this tower)–1,456 (75)
Capri 1B0 m1,441 (82)
Marine 2A0 m1,476 (27)
Capri 2E42 m1,470 (32)
Capri 2A42 m1,472 (41)
Capri 2C42 m1,547 (35)
Capri 2B42 m1,470 (20)
Capri 2D42 m1,488 (24)
Capri 1E58 m1,451 (91)

Drive times with no traffic

ToTimeDistance
Dubai Mall44 min42.5 km
DIFC Gate44 min43.3 km
DXB Terminal 362 min54.4 km
Dubai Marina Mall38 min34.3 km
Mall of the Emirates34 min30.4 km
Kite Beach40 min36.2 km
DWC airport31 min17.9 km

OSRM routing on OpenStreetMap roads. Real times in traffic are longer.

Own a unit here?

Ask for a report on your unit: its sales history, the same type's sales in the last 12 months and the homes for sale against it. A licensed partner agent, named on the report with the registration number, sends it. BUY DUBAI is not a broker and takes no part in the sale.

Method, sources and what we did not find

  • Sales: unit-level Dubai Land Department sale records, 19 Sep 2025 to 20 Oct 2026, checked by year against Dubai Land Department open data. Our unit list does not hold every sale, so some sales are missing.
  • Listings: one snapshot, 7 Oct 2026. Asking prices and asking rents.
  • Residents and building facts: Google Maps reviews and guide pages (Building guide from live adverts (facts and resident opinions; rewrite in your own words; cite as "live adverts")., Resident and public material found on the open web (one passage per block; source and date under each)., live adverts: community guide, mcconeproperties.com), read by an AI model on 22 Oct 2026 with a fixed question list. A script checks that each answer names its source.
  • Nobody visited the tower. Every fact is from a document, a map or a resident's review.
  • Checked, not found for this tower: a Google Maps place, resident reviews, a floor plan document, unit positions on a floor, the side and view of each unit, a licensed photo.

Corrections

Found an error? Tell us what is wrong and how you know. We check it, correct the page and list the change here.

Change log: 22 Oct 2026 first build of this page. No correction yet.

DaliaAIAsk DaliaAI analyst

Rental data (signed rents, renewals, asking against signed): RENT DUBAI, our sister site for tenants, from Dubai Land Department Ejari leases.